| CO Springs DRE | Original | A | 9/10/2026 | KDODGE | KDODGE | see previous DRE approval 8/4/26, comments still apply | | CO Springs DRE | 2357968 |
| Energy | Original | D | 9/10/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2357870 |
| Construction | Original | D | 9/10/2026 | SHELLEY | SHELLEY | Still need an approved AMM to use 2024 IECC. Cancelled previous patio cover submittal and it will be included in the scope as shown on these plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2357869 |
| Submittal 2 | Original | / | 9/10/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2357821 |
| CO Springs DRE | Original | A | 8/4/2026 | SSADLER | SSADLER | Approved to enclose a 130sqft section of an existing patio and cover 525sqft of an existing patio. New lot coverage is 26% | | CO Springs DRE | 2342903 |
| Energy | Original | D | 8/3/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2342285 |
| Mechanical | Original | A | 8/3/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2342284 |
| City Engr | Original | A | 7/31/2026 | JDAGNILLO | JDAGNILLO | Geological hazard report on file for subdivision. | | City Engr | 2341597 |
| Stormwater | Original | N | 7/30/2026 | EWANG | EWANG | | | Stormwater | 2341267 |
| Zoning/Planning | Original | / | 7/30/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2341177 |
| Electrical | Original | A | 7/30/2026 | CONNERM | CONNERM | | | Electrical | 2341158 |
| Electronic Plan | Original | / | 7/30/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2341157 |
| Plumbing | Original | N | 7/30/2026 | SHANEN | SHANEN | | | Plumbing | 2341151 |
| Construction | Original | D | 7/30/2026 | SHELLEY | SHELLEY | IECC and framing * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2341140 |
| Energy | Original | / | 7/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2341138 |
| Energy | Original | / | 7/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2341137 |
| Electronic Plan | Original | / | 7/30/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2341136 |
| | Original | / | 7/16/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/16/2026 for plan submitted 07/16/2026. Submit Date updated to now. Plan now open for review. | | | 2335055 |
| Energy | Original | N | 7/16/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2335038 |
| Floodplain | Original | N | 7/16/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5304311006) | | Floodplain | 2335037 |