| Energy | Original | A | 8/6/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2344529 |
| Mechanical | Original | A | 8/6/2026 | QUINTONW | QUINTONW | Approved: Engineered design | | Mechanical | 2344528 |
| Electrical | Original | A | 8/6/2026 | CONNERM | CONNERM | | | Electrical | 2344527 |
| Electrical | Original | D | 8/6/2026 | CONNERM | CONNERM | Remove amendments. No longer apply * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2344357 |
| Electronic Plan | Original | / | 8/6/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2344352 |
| Construction | Original | A | 8/6/2026 | BRIANB | BRIANB | | | Construction | 2344312 |
| Submittal 2 | Original | / | 8/6/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2344273 |
| WP Fire (CSFD Commercial) | Original | D | 8/6/2026 | NETCFIRE | NETCFIRE | Need to update site plan for driveway turnaround as discussed with Mark. Fire impact fees will be assessed to this project. | netcfire | WP Fire (CSFD Commercial) | 2344021 |
| Energy | Original | D | 8/5/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2343501 |
| Mechanical | Original | D | 8/5/2026 | QUINTONW | QUINTONW | Disapproved: Pending approved IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2343500 |
| Electronic Plan | Original | / | 8/5/2026 | QUINTONW | QUINTONW | In Current Review by QUINTONW | | Electronic Plan | 2343484 |
| Plumbing | Original | A | 8/5/2026 | SHANEN | SHANEN | | | Plumbing | 2343271 |
| Electrical | Original | D | 8/4/2026 | CONNERM | CONNERM | Specify and show location of potential PV pathway from roof to electric panel.
Provide a plan note stating there will be a 2-pole breaker space for each proposed combustion appliance
Show a 2-pole breaker space at the opposite end of the buss for Solar Ready.
Provide a plan note requiring compliance with 2021 IECC R402.4.6 limiting air leakage through electrical and communication outlet boxes installed in the building thermal envelope
Remove IECC amendments. No longer apply * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2343237 |
| Electronic Plan | Original | / | 8/4/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2343229 |
| Construction | Original | D | 8/4/2026 | BRIANB | BRIANB | See IECC certificate / See sheets A4-5 / Missing solar ready plan * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2343224 |
| Construction | Original | / | 8/4/2026 | WEBSITE | WEBSITE | Overtime Authorized for Construction by Mark McNab | MBI Contractors Inc. | Construction | 2343023 |
| Plumbing | Original | / | 8/4/2026 | WEBSITE | WEBSITE | Overtime Authorized for Plumbing by Mark McNab | MBI Contractors Inc. | Plumbing | 2343022 |
| Mechanical | Original | / | 8/4/2026 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by Mark McNab | MBI Contractors Inc. | Mechanical | 2343021 |
| Electrical | Original | / | 8/4/2026 | WEBSITE | WEBSITE | Overtime Authorized for Electrical by Mark McNab | MBI Contractors Inc. | Electrical | 2343018 |
| Electronic Plan | Original | / | 8/4/2026 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2342911 |
| Construction | Original | / | 8/4/2026 | WEBSITE | WEBSITE | Overtime Deauthorized for Construction by Mark McNab | MBI Contractors Inc. | Construction | 2342869 |
| Construction | Original | / | 8/4/2026 | WEBSITE | WEBSITE | Overtime Authorized for Construction by Mark McNab | MBI Contractors Inc. | Construction | 2342865 |
| WP Zoning | Original | A | 8/4/2026 | DBURGESS | DBURGESS | ZDP Conditionally Approved on 7/21/2026. WP Development Fees paid on 7/23/2026. | | WP Zoning | 2342672 |
| WP Floodplain | Original | N | 8/4/2026 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2342671 |
| WP Enumeration | Original | A | 8/4/2026 | DBURGESS | DBURGESS | Owner, parcel number & Tax number matches Teller County Assessor's published online data. Modified address from "4931 Trout Creek Road" to "4931 County Road 25" to match Teller County parcel data. Unable to add Address Point to PPRBD GIS Mapping - would not take the numeric entry. | | WP Enumeration | 2342669 |
| | Original | / | 7/30/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/30/2026 for plan submitted 07/30/2026. Submit Date updated to now. Plan now open for review. | | | 2341407 |
| Energy | Original | / | 7/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2341398 |