PROCESSING....
This is hidden content to make Wave think this is not a heading
Skip to main content
Pikes Peak Regional Building Department
Ensuring life safety and welfare of our community through efficient and consistent application of adopted codes and standards.
Home
Contact
Search
Accessibility
Cart
Sign In
Home
Contact
Search
Accessibility
Cart
Sign In
Plan Details
Clear
Permits
By Address
By Permit Number
Fee Calculator
Plans
By Address
List of Plans
Home
Plan #
  
Type
 
Plan
Owner
Address
14940 TIBORIA LOOP, PEYTON, CO 80831
Parcel Info
4135001003
Truss P/SF
30 (Elevation: 6,990 Feet)
Bedrooms
3
Project
RESIDENCE (
101
)
Type Of Plan
Normal
Review Type
Electronic
Fire District
PEYTON FIRE PROTECTION DISTRICT
Submit Date
Approval Date
Location
Plan Image
View Plan Image
Download Plan Image
Map
Google Map
Yahoo Maps
Bing Maps
MapQuest
GIS Map
County Map & Data
PPRBD Directions
Required Departments: 8
By checking this box, you agree to the following:
Overtime reviews are billed at $100/hour of review time.
Requesting overtime is optional. If I don’t request it, my plan will still be reviewed in the order submitted.
Overtime reviews are dependent on staff availability, so there is no guarantee that the review will be expedited. You will only be charged overtime fees if we are able to perform those reviews. If no one is available to take that review on an overtime basis, your plan may end up being reviewed in the regular sequence.
Required Departments and Log Entries
Department
Status
Approve Overtime
Overtime
Overtime_2
BoundColumn_2
Department
Construction
D
0
C
Construction
Electrical
D
0
E
Electrical
Energy
D
G
Energy
Enumeration
A
0
N
Enumeration
Floodplain
N
W
Floodplain
Mechanical
D
0
M
Mechanical
Plumbing
A
0
P
Plumbing
County Zoning
A
Z
County Zoning
Log Entries: 14
Log Details
View Log
Log
Time Summary
Department
Splice
Status
Date
Reviewer
Reviewer
Comment
username
Department
tid
Energy
Original
D
8/6/2026
SYSTEM
SYSTEM
Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews
Energy
2344583
Mechanical
Original
D
8/6/2026
QUINTONW
QUINTONW
Disapproved: Pending approved IECC
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Mechanical
2344582
County Zoning
Original
A
8/6/2026
DSDHILLS
DSDHILLS
Single Family Dwelling Approved (
see full review
)
County Zoning
2344566
Plumbing
Original
A
8/6/2026
SHANEN
SHANEN
Plumbing
2344372
Electrical
Original
D
8/6/2026
CONNERM
CONNERM
Specify and show location of potential PV pathway from roof to electric panel.
Verify locations of conduit and termination points serving the EV ready space.
Show an EV ready space is noted in the garage
Provide a plan note stating a minimum 2-pole, 40 amp GFCI breaker, conduit, conductor, and receptacle is provided for an EV Charger
Provide a plan note stating there will be a 2-pole breaker space for each proposed combustion appliance
Show a 2-pole breaker space at the opposite end of the buss for Solar Ready.
Provide a plan note requiring compliance with 2021 IECC R402.4.6 limiting air leakage through electrical and communication outlet boxes installed in the building thermal envelope
High efficacy lighting amendment for R404.2 does not apply to the unamended 2021 IECC. Plan will need to fully comply with original R.404.2 for lighting controls
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Electrical
2344368
Electronic Plan
Original
/
8/6/2026
CONNERM
CONNERM
In Current Review by CONNERM
Electronic Plan
2344358
Zoning/Planning
Original
/
8/6/2026
DSDHILLS
DSDHILLS
In Current Review by DSDHILLS
Zoning/Planning
2344339
Construction
Original
D
8/6/2026
BRIANB
BRIANB
See IECC certificate / Sheets S3 and S5 / missing solar ready roof plan
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Construction
2344329
Electronic Plan
Original
/
8/6/2026
BRIANB
BRIANB
In Current Review by BRIANB
Electronic Plan
2344059
Enumeration
Original
A
8/4/2026
BECKYA
BECKYA
Enumeration
2343100
Electronic Plan
Original
/
8/4/2026
BECKYA
BECKYA
In Current Review by BECKYA
Electronic Plan
2343065
Original
/
8/4/2026
SYSTEM
SYSTEM
Plan Review fees paid 08/04/2026 for plan submitted 08/04/2026. Submit Date updated to now. Plan now open for review.
2343046
Energy
Original
/
8/4/2026
SYSTEM
SYSTEM
Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews
Energy
2343037
Floodplain
Original
N
8/4/2026
RBD GIS
RBD GIS
Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 4135001003)
Floodplain
2343036