| Out to Review | Original | / | 9/29/2026 | REESAA | REESAA | steve walking 719- 205-8635 | | Out to Review | 2365073 |
| Finished Bin (Main) | Original | / | 9/25/2026 | | SCANNING | Location = Finished Bin (Main) by SCANNING | | Finished Bin (Main) | 2363899 |
| City Engr | Original | D | 9/25/2026 | JDAGNILLO | JDAGNILLO | Please clarify the depth of the proposed foundation on the plan. If it is greater than 3' excavation, Engineering Development Review has determined a geologic hazard report will be required for this lot. It must be completed by a geotechnical engineer and submitted directly to EDR through our electronic review system called ProjectDox. Below is a link to ProjectDox and a user manual.
https://coloradosprings.gov/stormwater/planreview
EDR's review fee will be collected by ProjectDox and if the report requires a third party review such as Colorado Geological Survey (CGS), their review fees are invoiced and paid directly to the third party review agency.
Revised application forms are available on Public Works web-page. Public Works/City Engineering Hub/New Development/Standards and References/ "References and Research Tools" https://coloradosprings.gov/public-works/page/engineering-standards-and-references
Once the City has approved the report, please include a copy with the building permit plan for City Engineering signoff on the permit.
plans routed to RBD | | City Engr | 2363849 |
| City Engr | Original | / | 9/23/2026 | | SCANNING | Location = City Engr by SCANNING | | City Engr | 2362464 |
| Plan Coordinator | Original | / | 9/22/2026 | | SSADLER | Location = Plan Coordinator by SSADLER | | Plan Coordinator | 2362234 |
| CO Springs DRE | Original | D | 9/22/2026 | SSADLER | SSADLER | On the site plan show the dimensions of all structures on the property. Show the distance the proposed addition is from the rear property line. | | CO Springs DRE | 2362233 |
| Zoning/Planning | Original | / | 9/21/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2361339 |
| Zoning/Planning | Original | / | 9/18/2026 | | SCANNING | Location = Zoning/Planning by SCANNING | | Zoning/Planning | 2361276 |
| Plan Coordinator (Main) | Original | / | 9/18/2026 | | SHANEN | Location = Plan Coordinator (Main) by SHANEN | | Plan Coordinator (Main) | 2361268 |
| Energy | Original | D | 9/18/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2361267 |
| Plumbing | Original | D | 9/18/2026 | SHANEN | SHANEN | Provide plumbing plans that comply with PPRBD residential plumbing plan review requirements. See inserted sheet. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2361266 |
| Plumbing (Main) | Original | / | 9/18/2026 | | SCANNING | Location = Plumbing (Main) by SCANNING | | Plumbing (Main) | 2361253 |
| Plan Coordinator (Main) | Original | / | 9/18/2026 | | QUINTONW | Location = Plan Coordinator (Main) by QUINTONW | | Plan Coordinator (Main) | 2361244 |
| Mechanical | Original | D | 9/18/2026 | QUINTONW | QUINTONW | Disapproved: see heat calcs and equipment cert for comments. Pending approved IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2361243 |
| Mechanical (Main) | Original | / | 9/17/2026 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 2360474 |
| Plan Coordinator (Main) | Original | / | 9/16/2026 | | DANIELG | Location = Plan Coordinator (Main) by DANIELG | | Plan Coordinator (Main) | 2360230 |
| Electrical | Original | D | 9/16/2026 | DANIELG | DANIELG | Comply with the CO MERSRC
RE 301.1
RS 410.1
RV501.1 * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2360046 |
| Electrical (Main) | Original | / | 9/15/2026 | | SCANNING | Location = Electrical (Main) by SCANNING | | Electrical (Main) | 2359619 |
| Plan Coordinator (Main) | Original | / | 9/15/2026 | AMY | AMY | In Current Review by AMY | | Plan Coordinator (Main) | 2359618 |
| Plan Coordinator (Main) | Original | / | 9/15/2026 | | MATTHEWA | Location = Plan Coordinator (Main) by MATTHEWA | | Plan Coordinator (Main) | 2359616 |
| Construction | Original | D | 9/15/2026 | MATTHEWA | MATTHEWA | Incorrect IECC form submitted, 2021 IECC unamended needs to be utilized // Revise R-values shown on structural drawings to reflect current code requirements. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2359615 |
| Energy | Original | / | 9/15/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2359581 |
| Construction (Main) | Original | / | 9/15/2026 | MATTHEWA | MATTHEWA | In Current Review by MATTHEWA | | Construction (Main) | 2359573 |
| Construction (Main) | Original | / | 9/10/2026 | | NELIDA | Location = Construction (Main) by NELIDA | | Construction (Main) | 2357960 |
| | Original | / | 9/10/2026 | SYSTEM | SYSTEM | Plan Review fees paid 09/10/2026 for plan submitted 09/08/2026 | | | 2357953 |
| Out to Review | Original | / | 9/8/2026 | TREYW | TREYW | Steve Walking 7192058635 | | Out to Review | 2357291 |
| Energy | Original | N | 9/8/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2357290 |
| Floodplain | Original | N | 9/8/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7411421002) | | Floodplain | 2357289 |