PROCESSING....
This is hidden content to make Wave think this is not a heading
Skip to main content
Pikes Peak Regional Building Department
Ensuring life safety and welfare of our community through efficient and consistent application of adopted codes and standards.
Home
Contact
Search
Accessibility
Cart
Sign In
Home
Contact
Search
Accessibility
Cart
Sign In
Plan Details
Clear
Permits
By Address
By Permit Number
Fee Calculator
Plans
By Address
List of Plans
Links
City PlanTrac
Colorado Springs Utilities
Home
Plan #
  
Type
 
Plan
Owner
Address
5667 VILLA LORENZO DR, COLORADO SPRINGS, CO 80919
Parcel Info
7314315019
Truss P/SF
30 (Elevation: 6,563 Feet)
Bedrooms
3
Project
RESIDENCE (
101
)
Type Of Plan
Normal
Review Type
Electronic
Fire District
COLORADO SPRINGS FIRE DIST
Submit Date
Approval Date
Location
Resubmittal
Plan Image
View Plan Image
Download Plan Image
Map
Google Map
Yahoo Maps
Bing Maps
MapQuest
GIS Map
County Map & Data
PPRBD Directions
Required Departments: 5
By checking this box, you agree to the following:
Overtime reviews are billed at $100/hour of review time.
Requesting overtime is optional. If I don’t request it, my plan will still be reviewed in the order submitted.
Overtime reviews are dependent on staff availability, so there is no guarantee that the review will be expedited. You will only be charged overtime fees if we are able to perform those reviews. If no one is available to take that review on an overtime basis, your plan may end up being reviewed in the regular sequence.
Required Departments and Log Entries
Department
Status
Approve Overtime
Overtime
Overtime_2
BoundColumn_2
Department
Enumeration
A
0
N
Enumeration
CO Springs Fire
A
F
CO Springs Fire
Floodplain
N
W
Floodplain
Stormwater
A
0
Q
Stormwater
CO Springs DRE
A
0
Z
CO Springs DRE
Log Entries: 14
Log Details
View Log
Log
Time Summary
Department
Splice
Status
Date
Reviewer
Reviewer
Comment
username
Department
tid
CO Springs DRE
Original
A
8/17/2022
KSCHOTT
KSCHOTT
new sfr, development standards met, all grading must conform with approved hillside site plan. Please note that limit of disturbance boundary and any preservation easements must be marked with 4' orange construction fencing according to approved plan; stockpiling to occur within LOD also according to approved site plan. Hillside site inspections will occur throughout construction to ensure compliance
PLDO fees are paid 8/17/22
CO Springs DRE
1729685
CO Springs DRE
Original
D
8/17/2022
KSCHOTT
KSCHOTT
1. PLDO fees are due for EACH unit prior to permit approval. Call 719-385-5982 to make payment. Otherwise site plan/elevations are stamped for approval
Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan
CO Springs DRE
1729531
Stormwater
Original
A
8/17/2022
JMOXNESS
JMOXNESS
Stormwater
1729523
Zoning/Planning
Original
/
8/12/2022
KSCHOTT
KSCHOTT
In Current Review by KSCHOTT
Zoning/Planning
1727648
Enumeration
Original
A
8/12/2022
BECKYA
BECKYA
Enumeration
1727619
Submittal 2
Original
/
8/12/2022
BECKYA
BECKYA
Submittal #2
Submittal 2
1727618
CO Springs Fire
Original
A
8/11/2022
CSFIRE
CSFIRE
We are pleased to inform you this plan is approved
You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS!
ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION!
dwithee
CO Springs Fire
1727058
CO Springs DRE
Original
D
8/1/2022
KSCHOTT
KSCHOTT
1. Show stockpile location
2. Elevations: label the existing grade line and max height "from existing grade"
3. PLDO fees are due prior to permit approval for EACH unit. Contact DREPlanningInfo@coloradosprings.gov for amount and to pay
kerri.schott@coloradosprings.gov
Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan
CO Springs DRE
1721818
Stormwater
Original
D
8/1/2022
JMOXNESS
JMOXNESS
- Show soils stockpile within limits of disturbance or note where it is.
Stormwater
1721521
Zoning/Planning
Original
/
7/26/2022
KSCHOTT
KSCHOTT
In Current Review by KSCHOTT
Zoning/Planning
1718627
Enumeration
Original
A
7/25/2022
BRENT
BRENT
Enumeration
1718445
Fire
Original
/
7/25/2022
RBD GIS
RBD GIS
Parcel 7314315019 is within the Wildland Urban Interface (WUI). Fire Department Review is required.
Fire
1718442
Stormwater
Original
/
7/25/2022
SYSTEM
SYSTEM
Parcel 7314315019 is within the Hillside Overlay (HS). Stormwater Review is required.
Stormwater
1718443
Floodplain
Original
N
7/25/2022
RBD GIS
RBD GIS
Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7314315019)
Floodplain
1718444