CO Springs Fire | Original | D | 9/10/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. (see full review) | phil.valdez | CO Springs Fire | 2058420 |
City Engr | Original | D | 9/5/2024 | JDAGNILLO | JDAGNILLO | Public sidewalk plans for proposed sidewalk along Fillmore must be approved prior to Preserve at Mesa Creek building permit sign-offs, along with financial assurances posted. Thank you. | | City Engr | 2056222 |
CO Springs DRE | Original | D | 9/5/2024 | CHUDSPETH | CHUDSPETH | Plans have been denied until planner review is complete. All PLDO, School, CDI fees were paid on 9/5/2024 (see full review) | | CO Springs DRE | 2055856 |
CO Springs DRE | Original | D | 8/30/2024 | KSCHOTT | KSCHOTT | 1. Per DEPN-24-0034 notes on cover sheet, each lot will require a hillside site plan and hillside elevations at time of building permit for review. Please visit our website for the Hillside Site Plan checklist. Existing grade lines must be shown on site plan and elevations in accordance with the preliminary grading plan shown in the DP set of file DEPN-24-0034. Max allowable height is to be shown from the existing grade lines https://coloradosprings.gov/planning-and-development/page/hillside-overlay 2. PLDO fees are due at time of building permit, to pay contact DREPlanningInfo@coloradosprings.gov 3. Informational: both public and private financial assurances for the development must be posted prior to permit approval kerri.schott@coloradosprings.gov 4. Contact patrick.dosch@coloradosprings.gov for LOD inspections Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 2054190 |
Zoning/Planning | Original | / | 8/29/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2053250 |
Stormwater | Original | D | 8/28/2024 | JLANDON | JLANDON | Include the following on the Hillside site plan: -Show and label Limits of Disturbance. -Show and label existing and proposed contours (min. 2') and label with elevations. -Show and label soil stockpile within limits of disturbance. -PE sign and stamp. | | Stormwater | 2053151 |
Zoning/Planning | Original | / | 8/28/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2052793 |
Enumeration | Original | A | 8/28/2024 | AMY | AMY | In the future add the tax schedule number to the plot plan. This has been added for you. | | Enumeration | 2052775 |
Floodplain | Original | N | 8/28/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7335403011) | | Floodplain | 2052774 |
Fire | Original | / | 8/28/2024 | RBD GIS | RBD GIS | Parcel 7335403011 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 2052772 |
Stormwater | Original | / | 8/28/2024 | SYSTEM | SYSTEM | Parcel 7335403011 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 2052773 |