HUGHES-SMITH, INC | B= | C | 08/09/1995 | | MIKE | MIKE | | B= | C | 929600 |
HUGHES-SMITH, INC | B= | P | 08/03/1995 | ELECTRICAL FINAL | MIKE | MIKE | | B= | P | 929575 |
HUGHES-SMITH, INC | BFD | C | 08/03/1995 | CTL THOMPSON, INC. PERFORMED THE FDTN DRAIN INSPECTION | MIKE | MIKE | | BFD | C | 929583 |
HUGHES-SMITH, INC | BFN | C | 08/03/1995 | MORGAN & ASSOCIATES COMPLETED ALL FDTN WALL & FTG INSPECTIONS | MIKE | MIKE | | BFN | C | 929592 |
HUGHES-SMITH, INC | B= | P | 08/02/1995 | 2ND & 3RD FLR - CENTER SMOKE SEAL @ 90 MIN DRS IN 2 HR AREA SEP WALL,DECK GRDRL @ 2ND FLR LAUNDRY,FINAL GRADE | MIKE | MIKE | | B= | P | 929567 |
HUGHES-SMITH, INC | B= | P | 08/01/1995 | GARDEN LEVEL & 1ST FLR - CLEAR FDTN & FDTN DRAIN INSPECTION,ELEC FINAL,SEAL FIREWALL PENETRATIONS,60 MIN LABEL DR #G42,SMOKE SEAL DR #G01 & G23,ADJ DR HRDWR #101 | MIKE | MIKE | | B= | P | 929557 |
HUGHES-SMITH, INC | BLA | C | 05/10/1995 | | MIKE | MIKE | | BLA | C | 929550 |
HUGHES-SMITH, INC | BFR | C | 05/03/1995 | | DAVE JONES | DAVE JONES | | BFR | C | 929534 |
HUGHES-SMITH, INC | BLA | P | 05/03/1995 | WEST SIDE ONLY | DAVE JONES | DAVE JONES | | BLA | P | 929541 |
HUGHES-SMITH, INC | BFR | R | 05/02/1995 | 3RD FLR - ITEMS NOT CORRECTED | MIKE | MIKE | | BFR | R | 929526 |
HUGHES-SMITH, INC | BFR | L | 05/01/1995 | FRT GATE LOCKED | MIKE | MIKE | | BFR | L | 929518 |
HUGHES-SMITH, INC | BFR | P | 04/24/1995 | 3RD FLR - 5/8" SHTRK BEHIND SHWR WALLS,COMPLETE SHAFT WALLS TO PLENUM,SHEAR WALL NAIL SPCG,SEAL PENETRATIONS IN FIREWALL @ 2HR WALLS | MIKE | MIKE | | BFR | P | 929513 |
HUGHES-SMITH, INC | BFR | P | 04/20/1995 | 3RD FLR - COMPLETE SEALING DRAFTSTOPS,SEAL SHAFT & FLOOR PENETRATIONS,SHEAR WALL INSPECTION,PLMBG & VENT INSPECTION | MIKE | MIKE | | BFR | P | 929507 |
HUGHES-SMITH, INC | BFR | P | 04/13/1995 | 2ND FLR COMPLETE,COMPLETE SEALING OF FLR PENETRATIONS | MIKE | MIKE | | BFR | P | 929499 |
HUGHES-SMITH, INC | BFR | P | 04/10/1995 | OK to insulate exterior walls of 2nd floor only need plumbing rough before framing inspection can be done | BILLC | BILLC | | BFR | P | 929491 |
HUGHES-SMITH, INC | BFR | P | 04/04/1995 | 1ST FLR WALLS COMPLETE | MIKE | MIKE | | BFR | P | 929484 |
HUGHES-SMITH, INC | BFR | P | 04/03/1995 | recall for fl.seals | DAVE JONES | DAVE JONES | | BFR | P | 929476 |
HUGHES-SMITH, INC | BFR | P | 03/30/1995 | 1ST FLR - SEAL FLOOR PENET NOT COMPLETE | MIKE | MIKE | | BFR | P | 929468 |
HUGHES-SMITH, INC | BFR | P | 03/29/1995 | 1ST FLR FRMG - JST BLKG @ EXTERIOR WALL,SEAL DRAFT STOP/FIREWALL/FLOOR PENETRATIONS,CHASE WALL FRMG | MIKE | MIKE | | BFR | P | 929461 |
HUGHES-SMITH, INC | BFR | P | 03/27/1995 | PARTIAL-SOUTH EXTERIOR SHEAR WALL NAILING OK ALL 3 FLOORS/MECH ROOM FRAMING OK ALL 2ND FLOOR UNITS/3RD FLOOR CORRIDOR CEILING OK TO ROCK | BLAKE | BLAKE | | BFR | P | 929453 |
HUGHES-SMITH, INC | BLA | P | 03/14/1995 | INSIDE OF ROOF PARAPET | MIKE | MIKE | | BLA | P | 929444 |
HUGHES-SMITH, INC | BLA | R | 03/13/1995 | not ready/recall | DAVE JONES | DAVE JONES | | BLA | R | 929430 |
HUGHES-SMITH, INC | BFR | P | 03/10/1995 | ground level only | JOE | JOE | | BFR | P | 929420 |
HUGHES-SMITH, INC | BFR | P | 03/03/1995 | FURNACE RM #623,HVAC UNIT RMS 1ST FLR - INSTALL ALL HANGER NAILS | MIKE | MIKE | | BFR | P | 929413 |
HUGHES-SMITH, INC | BFR | P | 02/23/1995 | BSMT CORREDOR & DRAFT STOPS ABOVE CEILING,SEAL PENETRATIONS IN CORRIDOR FIREWALL & PARTY WALL DRAFTSTOPS | MIKE | MIKE | | BFR | P | 929405 |
HUGHES-SMITH, INC | BFD | R | 02/23/1995 | SEAL PLASTIC TO FDTN WALL & INSTALL FABRIC OVER GRAVEL | MIKE | MIKE | | BFD | R | 929398 |
HUGHES-SMITH, INC | BFR | P | 02/06/1995 | BSMT HALL CEILING,NEED TEST REPORTS FOR STL BEAM FIREPROOFING,BSMT FIREWALLS DO NOT SHOW FIRESAFING @ SLIP TRACK VOID | MIKE | MIKE | | BFR | P | 929390 |
HUGHES-SMITH, INC | BFN | P | 01/31/1995 | AREA WELL FDTN WALLS - ENG APPV HEATING DWLS TO BEND INTO WALL | MIKE | MIKE | | BFN | P | 929382 |
HUGHES-SMITH, INC | BFT | P | 01/20/1995 | PATIO FTGS WEST SIDE OF BLDG | MIKE | MIKE | | BFT | P | 929375 |
HUGHES-SMITH, INC | BBB | C | 12/22/1994 | BBB CMPLTD TOP OF WALL,SOUTH/EAST | RICH | RICH | | BBB | C | 929367 |
FERGUSON ELECTRIC CORPORATION | E= | C | 08/08/1995 | | TERRY | TERRY | | E= | C | 929878 |
FERGUSON ELECTRIC CORPORATION | E= | P | 07/24/1995 | TCO ok, need to rotate cover on outside recpetilces, support mirror recepticles, add convenience outlets for roof top units | TERRY | TERRY | | E= | P | 929869 |
FERGUSON ELECTRIC CORPORATION | ER | P | 04/13/1995 | 3rd floor apartments ok | TERRY | TERRY | | ER | P | 929862 |
FERGUSON ELECTRIC CORPORATION | ER | P | 04/05/1995 | 2nd floor walls | TERRY | TERRY | | ER | P | 929853 |
FERGUSON ELECTRIC CORPORATION | ER | P | 03/28/1995 | 1ST FLOOR UNIT & 2ND & 3RD FLOOR FURNACE CLOSETS | TERRY | TERRY | | ER | P | 929844 |
FERGUSON ELECTRIC CORPORATION | ER | P | 03/20/1995 | 2ND FLOOR FURNACE ROOMS | TERRY | TERRY | | ER | P | 929835 |
FERGUSON ELECTRIC CORPORATION | ER | P | 03/09/1995 | 4 APARTMENTS GARDEN LEVEL | RED | RED | | ER | P | 929827 |
FERGUSON ELECTRIC CORPORATION | ER | P | 03/03/1995 | garden level community level, furnace area rough | TERRY | TERRY | | ER | P | 929820 |
FERGUSON ELECTRIC CORPORATION | ER | R | 01/27/1995 | rejectd sprinkler piping in existing main electrical room, informed them of variance process, room has only eletrical equipement inside and is designated as an electrical space on plans and with sign outside the door | TERRY | TERRY | | ER | R | 929812 |
FERGUSON ELECTRIC CORPORATION | ESL | C | 01/19/1995 | | TERRY | TERRY | | ESL | C | 929805 |
FERGUSON ELECTRIC CORPORATION | ESL | P | 01/11/1995 | 1st floor slab ok | TERRY | TERRY | | ESL | P | 929798 |
J D STEWARD AIR CONDITIONING | HV | C | 07/27/1995 | | JOHNW | JOHNW | | HV | C | 929789 |
J D STEWARD AIR CONDITIONING | H= | C | 07/27/1995 | ok for c.o. | JOHNW | JOHNW | | H= | C | 929782 |
WALKER HICKS PIPING, LLC | H= | C | 07/27/1995 | | JOHNW | JOHNW | | H= | C | 929616 |
WALKER HICKS PIPING, LLC | HI | C | 07/27/1995 | | JOHNW | JOHNW | | HI | C | 929624 |
J D STEWARD AIR CONDITIONING | H= | P | 07/20/1995 | ok for t.c.o./extend vent on M.U.A. unit also gas pipe same unit | JOHNW | JOHNW | | H= | P | 929772 |
J D STEWARD AIR CONDITIONING | HD | C | 05/10/1995 | all 3 levels complete | JOHNW | JOHNW | | HD | C | 929766 |
J D STEWARD AIR CONDITIONING | HD | P | 05/02/1995 | 2nd level dryer vents ok/3rd level duct in north units ok | JOHNW | JOHNW | | HD | P | 929756 |
J D STEWARD AIR CONDITIONING | HD | P | 04/12/1995 | 1ST LEVEL CORIDOR DUCT OK/1ST & 2ND LEVELS EXHAUST DUCT OK/1ST LEVEL DRYER VENTS OK | JOHNW | JOHNW | | HD | P | 929748 |
J D STEWARD AIR CONDITIONING | HD | P | 03/31/1995 | dryer vents in ground level complete/bath fan vents in 1 & 2nd levels complete | JOHNW | JOHNW | | HD | P | 929745 |
J D STEWARD AIR CONDITIONING | HD | P | 03/27/1995 | LOWER LEVEL COMPLETE FOR ABOVE CEILING ROUGH EXCEPT FOR MECH ROOM | JOHNW | JOHNW | | HD | P | 929737 |
J D STEWARD AIR CONDITIONING | HD | P | 03/15/1995 | duct in lower level ok for above ceiling rough except for dryer vents including all floors | JOHNW | JOHNW | | HD | P | 929728 |
J D STEWARD AIR CONDITIONING | HD | R | 03/10/1995 | cannot find tinners | JIMV | JIMV | | HD | R | 929720 |
WALKER HICKS PIPING, LLC | HI | P | 03/10/1995 | garden level 60 garden level 60# ok | JIMV | JIMV | | HI | P | 929608 |
J D STEWARD AIR CONDITIONING | HD | P | 02/27/1995 | fire dampers in garden level ok | JOHNW | JOHNW | | HD | P | 929712 |
WALKER HICKS PIPING, LLC | P= | C | 07/14/1995 | | JIMV | JIMV | | P= | C | 929705 |
WALKER HICKS PIPING, LLC | PTO | C | 04/21/1995 | | MARTY | MARTY | | PTO | C | 929697 |
WALKER HICKS PIPING, LLC | PTO | P | 04/13/1995 | 2nd floor | MARTY | MARTY | | PTO | P | 929687 |
WALKER HICKS PIPING, LLC | PTO | R | 04/12/1995 | no revents below flood level | MARTY | MARTY | | PTO | R | 929680 |
WALKER HICKS PIPING, LLC | PTO | P | 03/30/1995 | 1st floor ok | JIMV | JIMV | | PTO | P | 929672 |
WALKER HICKS PIPING, LLC | PTO | P | 03/09/1995 | garden level | MARTY | MARTY | | PTO | P | 929664 |
WALKER HICKS PIPING, LLC | PB | C | 01/17/1995 | | JIMV | JIMV | | PB | C | 929647 |
WALKER HICKS PIPING, LLC | PRD | P | 01/17/1995 | underground ok | JIMV | JIMV | | PRD | P | 929655 |
WALKER HICKS PIPING, LLC | PB | P | 01/12/1995 | see approved plans for inspection history; s. end garden level ok | JIMV | JIMV | | PB | P | 929639 |
WALKER HICKS PIPING, LLC | PB | P | 12/30/1994 | TRUNK LINES ONLY | MARTY | MARTY | | PB | P | 929632 |