GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 10/25/1996 | | JOE | JOE | | B= | C | 1066526 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/15/1996 | PARTIAL BUILDING FINAL,FIRE FINAL REQUIRED FOR C.O. | RICH | RICH | | B= | P | 1066518 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/11/1996 | signage/fire final/cables at stairs/firedoor needs to latch | FRANK | FRANK | | B= | P | 1066511 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/13/1996 | signage/handrail ext. west stairs/ seal holes elect room 1st floor/ pad piper under lav/ east entry stair risers not to code/ cable spacing greater 4" at stairwells/ temp glass 2nd floor office/ smoke seal door to existing bld at 2nd floor | JOE | JOE | | B= | P | 1066503 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 09/04/1996 | | JOE | JOE | | BFR | C | 1066496 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/28/1996 | 2ND FLOOR CORRIDOR PENETRATIONS NOT DONE ,CONDUIT RACEWAYS NEED FIRE CHAULK,MECH DAMPER ASSEMBLIES NOT RATED,NO FUSE LINK,RECALL | RICH | RICH | | BFR | P | 1066490 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/23/1996 | still need firedampers in 1 hr wall upper pen. ok still need pen. at hall closet and w/pool room | JIMA | JIMA | | BFR | P | 1066481 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/21/1996 | UPPER CORRIDOR PENETRATION,OPEN GRILLS INTO CORRIDOR,RATING ON CEILING ASSEMBLY UNSTAMPED TILES ,CLASS A TYPE III,OTHER HOLES T FILL RECALL | RICH | RICH | | BFR | P | 1066473 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/16/1996 | interior partions | JOE | JOE | | BFR | P | 1066466 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/13/1996 | seal penatrations in floor & frame shaft walls in elect room | JOE | JOE | | BFR | P | 1066456 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 06/04/1996 | not ready | JOE | JOE | | BFR | R | 1066450 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/30/1996 | 2nd floor OK | JOHNP | JOHNP | | BFR | P | 1066441 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/15/1996 | 2nd floor ---seal all penatrations floor/ frame shaft wall | JOE | JOE | | BFR | P | 1066434 |
KENNY ELECTRIC SERVICE, INC. | E= | C | 10/09/1996 | | RON | RON | | E= | C | 1066919 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 09/12/1996 | final. | RON | RON | | E= | P | 1066910 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/20/1996 | 2ND FLOOR GRID CEILING | ARNOLD | ARNOLD | | ER | P | 1066902 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/01/1996 | bathroom ceilings and dock walls | ARNOLD | ARNOLD | | ER | P | 1066894 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/15/1996 | 1st and 2nd floors floor to grid walls | ARNOLD | ARNOLD | | ER | P | 1066886 |
KENNY ELECTRIC SERVICE, INC. | ES | C | 07/01/1996 | ok to re-energize servive-please coordinated with kenny elec. service | ARNOLD | ARNOLD | | ES | C | 1066878 |
KENNY ELECTRIC SERVICE, INC. | ES | P | 06/26/1996 | sub feed to panels | TERRY | TERRY | | ES | P | 1066870 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 06/26/1996 | east side ceilings | TERRY | TERRY | | ER | P | 1066861 |
KENNY ELECTRIC SERVICE, INC. | ES | P | 06/07/1996 | switch gear and grounding | ARNOLD | ARNOLD | | ES | P | 1066853 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 06/07/1996 | 1st floor walls | ARNOLD | ARNOLD | | ER | P | 1066846 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 05/09/1996 | 2nd floor walls floor to floor | ARNOLD | ARNOLD | | ER | P | 1066837 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 05/07/1996 | wall ruff in bsmt | ARNOLD | ARNOLD | | ER | P | 1066828 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 04/17/1996 | | ARNOLD | ARNOLD | | EUG | P | 1066820 |
KENNY ELECTRIC SERVICE, INC. | ESL | P | 03/26/1996 | slab for communication area | ARNOLD | ARNOLD | | ESL | P | 1066813 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 02/26/1996 | | ARNOLD | ARNOLD | | EUG | P | 1066804 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 09/04/1996 | | JOHNW | JOHNW | | H= | C | 1066629 |
HEATING & PLUMBING ENGINEERS, INC | HC | C | 08/26/1996 | OK FOR METER | JOHNW | JOHNW | | HC | C | 1066621 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/21/1996 | check combustion air size on waterheater room 2nd level/finish unit above ceilng 2nd level | JOHNW | JOHNW | | H= | P | 1066586 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/21/1996 | ok for meter | JOHNW | JOHNW | | H= | P | 1066594 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 08/21/1996 | | JOHNW | JOHNW | | HD | C | 1066602 |
HEATING & PLUMBING ENGINEERS, INC | HV | C | 08/21/1996 | | JOHNW | JOHNW | | HV | C | 1066611 |
HEATING & PLUMBING ENGINEERS, INC | HV | P | 08/08/1996 | | JOHNW | JOHNW | | HV | P | 1066578 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 07/16/1996 | 60# psi test ok | JOHNW | JOHNW | | HI | P | 1066570 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 06/19/1996 | 60# test | JOHNW | JOHNW | | HI | P | 1066560 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 06/10/1996 | welded gas line stub into building 60# test | JOHNW | JOHNW | | HI | P | 1066550 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/21/1996 | 1st level 70% on rough duct | JOHNW | JOHNW | | HD | P | 1066541 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/17/1996 | 2nd level 80% above ceiling rough still need firedamper frame inspection | JOHNW | JOHNW | | HD | P | 1066534 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 10/08/1996 | | JIMV | JIMV | | P= | C | 1066796 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 09/12/1996 | TCO need owner provided equip installed | JIMV | JIMV | | P= | P | 1066770 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 09/12/1996 | | JIMV | JIMV | | PTO | C | 1066788 |
HEATING & PLUMBING ENGINEERS, INC | PRD | C | 09/12/1996 | | JIMV | JIMV | | PRD | C | 1066778 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/03/1996 | complete water pipe on the whole addition at this time static 100# test,,,rough-in in casting room number 140 on grid lines 3 and 4 on column line B.5 ok | BILL | BILL | | PTO | P | 1066761 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/10/1996 | sanitary waste and vent only,no water pipe, on the first floor to the east bathrooms and hydro area,, and the storm and overflows on the east entry area done | BILL | BILL | | PTO | P | 1066752 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/21/1996 | first and second floor sanitary waste for the second floor bathrooms on the north end of the addition and floor drains, and the water pipe for the second floor bathrooms ok but no sanitary or water pipe for the first floor yet | BILL | BILL | | PTO | P | 1066743 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/16/1996 | ALL THE DWV ON THE FIRST FLOOR SOUTH OF THE BATHROOM DEMISING WALL EXEPT THE HYDRO TUB AREA AND THE WATER PIPE ANYWHERE OK | BILL | BILL | | PTO | P | 1066735 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 05/07/1996 | EAST ENTRY ONLY, UG UP TO THE RISERS AND SWEEPS TO AREA DRAINS IN THE ENTRY AREA | BILL | BILL | | PRD | P | 1066727 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 05/01/1996 | 4 6" FROM THE MAIN FLOOR TO THE ROOF AND OVERFLOWS ON THE EAST COLUMN LINE 2 OK | BILL | BILL | | PRD | P | 1066719 |
HEATING & PLUMBING ENGINEERS, INC | PRD | R | 04/30/1996 | cancelled per sandy at 1125 hours | BILL | BILL | | PRD | R | 1066711 |
HEATING & PLUMBING ENGINEERS, INC | PRD | R | 04/29/1996 | CANCEL | SANDY | SANDY | | PRD | R | 1066704 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/26/1996 | 4 6" risers from 1st floor to the roof drains and overflows ok west side | BILL | BILL | | PRD | P | 1066696 |
HEATING & PLUMBING ENGINEERS, INC | PB | C | 04/16/1996 | last of the underground in this building//ug for the hydro-therapy tubs area h2o test | BILL | BILL | | PB | C | 1066686 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/11/1996 | last of the underground on this building on the east end on column line 2 both 8" stubs on the south end of the building to the north end of the new addition | BILL | BILL | | PRD | P | 1066678 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/09/1996 | from grid line 4 to 2 and between column lines a and b,to the floor clean out and two 2" risers but no run outs | BILL | BILL | | PB | P | 1066670 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/01/1996 | deep trunks west of column line 4 with the 3" run out to the entry floor drain and the 3" from the sump which picks up the stairwell drains | BILL | BILL | | PTO | P | 1066662 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 03/18/1996 | all the trunks to the bathrooms on the main level and the branches to the sinks in the medicine interview rooms,but no other trunks or roof drains | BILL | BILL | | PB | P | 1066654 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/28/1996 | deep trunks on the east side of the science bldg that ties into the 6" from the exsisting building drain from the building to the north and runs to the south of the new building,,also the stair well to the southwest of the new building to the sump ok | BILL | BILL | | PB | P | 1066646 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/22/1996 | science and medicine bldg, area drain in the bsmnt partial on the deep trunk up to where it turns flat to the trap arm ok but need to see the trap and vent when backfilled and installed, flow test then will be ok | BILL | BILL | | PB | P | 1066638 |