TRI-STAR MASONRY, INC. | B= | C | 01/09/1997 | FIRE FINAL OK; OK BLDG FINAL PER J. POCH | ANDY | ANDY | | B= | C | 1135588 | TRI-STAR MASONRY, INC. | B= | P | 12/20/1996 | Pending Fire final | JOHNP | JOHNP | | B= | P | 1135579 | TRI-STAR MASONRY, INC. | B= | R | 12/18/1996 | SEE CARD,FIRE FINAL REQD,RECALL | RICH | RICH | | B= | R | 1135570 | TRI-STAR MASONRY, INC. | BFR | C | 10/31/1996 | | RICH | RICH | | BFR | C | 1135561 | TRI-STAR MASONRY, INC. | BFR | P | 10/21/1996 | LOBBY CURTAIL WALL,PARTIAL STAIRWAY,RESTROOM LID,RECALL ,SEPATIONREQD AT AREA #6 TO UPPER FLOOR,FINISH STAIR CHASE | RICH | RICH | | BFR | P | 1135553 | TRI-STAR MASONRY, INC. | BFR | P | 10/18/1996 | STAIRWAY AND RESTROOM LID ,PARTIAL NOT COMPLT | RICH | RICH | | BFR | P | 1135546 | TRI-STAR MASONRY, INC. | BFR | P | 10/16/1996 | NORTH WALL THEATER #6 COMPLT,LOBBY WALL ,PARTIAL CURTAIN SOOFFIT AT ENTRY LOBBY,RESTRM WALLS ONLY,NEED TO SSE LID | RICH | RICH | | BFR | P | 1135538 | TRI-STAR MASONRY, INC. | BFR | P | 10/08/1996 | THEATERS 1-5,PARTIAL 6,UPPER FLOOR PROJECTION AREA,STARWY NOT DONE ,RESTROOMS,PASSAGEWAT NOT DONE | RICH | RICH | | BFR | P | 1135530 | TRI-STAR MASONRY, INC. | BFR | P | 09/12/1996 | UPPER HALF WALL ROOF CLOSURE OK | RICH | RICH | | BFR | P | 1135522 | TRI-STAR MASONRY, INC. | BBB | P | 08/08/1996 | south side and middles east/ | FRANK | FRANK | | BBB | P | 1135514 | TRI-STAR MASONRY, INC. | BFN | P | 08/06/1996 | grade beam 2 | JOE | JOE | | BFN | P | 1135506 | TRI-STAR MASONRY, INC. | BBB | P | 08/05/1996 | GRID A-A,34-2,C-8 and C-2 | GREGC | GREGC | | BBB | P | 1135498 | TRI-STAR MASONRY, INC. | BFN | P | 07/29/1996 | SOUTH WEST CORNER COMPLT | RICH | RICH | | BFN | P | 1135489 | TRI-STAR MASONRY, INC. | BFN | P | 07/26/1996 | WEST GRADE BEAM,SEE S-1 | RICH | RICH | | BFN | P | 1135482 | TRI-STAR MASONRY, INC. | BFN | P | 07/23/1996 | SEE S-1 | RICH | RICH | | BFN | P | 1135473 | TRI-STAR MASONRY, INC. | BFN | P | 07/15/1996 | DATED ON PLAN NORTH AND EAST SIDES | PHIL | PHIL | | BFN | P | 1135465 | TRI-STAR MASONRY, INC. | BFT | P | 06/28/1996 | CASSIONS,LYNKON DEVOR ON SITE,PROVIDE LOG | RICH | RICH | | BFT | P | 1135458 | L. G. ELECTRIC | E= | C | 12/17/1996 | | ARNOLD | ARNOLD | | E= | C | 1135870 | L. G. ELECTRIC | ER | P | 11/12/1996 | lobby ceiling. | RON | RON | | ER | P | 1135854 | L. G. ELECTRIC | ES | C | 11/12/1996 | 3w/ug 600 amp 480v e+g electric. | RON | RON | | ES | C | 1135862 | L. G. ELECTRIC | ER | P | 11/06/1996 | ceilings in4-5-6 | ARNOLD | ARNOLD | | ER | P | 1135847 | L. G. ELECTRIC | ER | P | 10/31/1996 | ceilings theatre 1 2 and 3 | ARNOLD | ARNOLD | | ER | P | 1135839 | L. G. ELECTRIC | ER | P | 10/29/1996 | HALLWAYS CEILING WALLS LOBBY WALLS,WORKROOM WALLS.,LO | RON | RON | | ER | P | 1135831 | L. G. ELECTRIC | ER | R | 10/22/1996 | no hidden j-boxs above hard ceilings without access holes-support pipe in proper manner secure all j-boxs | ARNOLD | ARNOLD | | ER | R | 1135823 | E.I.S. INC | E= | C | 10/18/1996 | | ARNOLD | ARNOLD | | E= | C | 1135726 | L. G. ELECTRIC | ER | P | 10/11/1996 | | ARNOLD | ARNOLD | | ER | P | 1135813 | L. G. ELECTRIC | ER | P | 10/04/1996 | walls in units 601-2 and 3 | ARNOLD | ARNOLD | | ER | P | 1135805 | L. G. ELECTRIC | ER | P | 09/27/1996 | OUTSIDE WALLS 601-602-603 | RED | RED | | ER | P | 1135797 | L. G. ELECTRIC | EUG | P | 08/20/1996 | | RON | RON | | EUG | P | 1135789 | SOUTHERN AIR & MECHANICAL CONT | H= | C | 12/06/1996 | | JOHNW | JOHNW | | H= | C | 1135781 | WALKER HICKS PIPING, LLC | H= | C | 12/06/1996 | | JOHNW | JOHNW | | H= | C | 1135609 | SOUTHERN AIR & MECHANICAL CONT | HD | C | 11/12/1996 | | JOHNW | JOHNW | | HD | C | 1135773 | SOUTHERN AIR & MECHANICAL CONT | HC | C | 11/01/1996 | | JIMV | JIMV | | HC | C | 1135757 | SOUTHERN AIR & MECHANICAL CONT | HD | P | 11/01/1996 | need to complete duct in concession, & lower hallway | JIMV | JIMV | | HD | P | 1135765 | SOUTHERN AIR & MECHANICAL CONT | HC | R | 10/30/1996 | NO ACCESS | PAT | PAT | | HC | R | 1135749 | SOUTHERN AIR & MECHANICAL CONT | HD | P | 10/29/1996 | all theatres ok, need retaining angles on upstair fire dampers thru wall, complete duct in concession | JIMV | JIMV | | HD | P | 1135741 | SOUTHERN AIR & MECHANICAL CONT | HD | P | 10/24/1996 | duct in theaters 101,102& 103 complete / radiation dampers require support on all 4 cornners /theaters 104,105 &106 above ceiling rough ok | JOHNW | JOHNW | | HD | P | 1135734 | WALKER HICKS PIPING, LLC | HI | C | 10/17/1996 | | JOHNW | JOHNW | | HI | C | 1135600 | WALKER HICKS PIPING, LLC | H= | C | 10/17/1996 | GAS PIPING | JOHNW | JOHNW | | H= | C | 1135595 | WALKER HICKS PIPING, LLC | P= | C | 12/06/1996 | | PAT | PAT | | P= | C | 1135718 | WALKER HICKS PIPING, LLC | PTO | C | 10/18/1996 | | JIMV | JIMV | | PTO | C | 1135701 | WALKER HICKS PIPING, LLC | PTO | P | 10/18/1996 | GAVE TO JIM V | PAT | PAT | | PTO | P | 1135709 | WALKER HICKS PIPING, LLC | P16 | R | 10/14/1996 | NEED BETTER DIRECTIONS AND WHAT THIS INSPECTION IS FOR | JOHNW | JOHNW | | P16 | R | 1135693 | WALKER HICKS PIPING, LLC | PTO | P | 10/09/1996 | DWV ONLY | PAT | PAT | | PTO | P | 1135684 | WALKER HICKS PIPING, LLC | PRD | C | 10/09/1996 | | PAT | PAT | | PRD | C | 1135676 | WALKER HICKS PIPING, LLC | PTO | T | 09/18/1996 | PAID (REC#: 248461)NOTHING IS READY TO BE INSPECTED--NO PLUMBERS AROUND--135 PM | PAT | PAT | | PTO | T | 1135669 | WALKER HICKS PIPING, LLC | PB | C | 08/28/1996 | | PAT | PAT | | PB | C | 1135662 | WALKER HICKS PIPING, LLC | PB | R | 08/27/1996 | NOT READY--NO TEST--BACKFALL | PAT | PAT | | PB | R | 1135654 | WALKER HICKS PIPING, LLC | PRD | P | 08/26/1996 | | DAVEL | DAVEL | | PRD | P | 1135646 | WALKER HICKS PIPING, LLC | PRD | R | 08/23/1996 | not ready | DAVEL | DAVEL | | PRD | R | 1135638 | WALKER HICKS PIPING, LLC | PRD | P | 08/21/1996 | underground roof lines except the south side | DAVEL | DAVEL | | PRD | P | 1135633 | WALKER HICKS PIPING, LLC | PB | P | 08/09/1996 | see plans | JIMV | JIMV | | PB | P | 1135625 | WALKER HICKS PIPING, LLC | PB | P | 07/26/1996 | see job site plans | JIMV | JIMV | | PB | P | 1135617 |
|
|