RADIL CONSTRUCTION INC | B= | C | 01/07/1997 | | JOE | JOE | | B= | C | 1194940 |
RADIL CONSTRUCTION INC | B= | P | 11/21/1996 | z-d blding | JOE | JOE | | B= | P | 1194925 |
RADIL CONSTRUCTION INC | BLA | C | 11/21/1996 | men shower ceiling | JOE | JOE | | BLA | C | 1194933 |
RADIL CONSTRUCTION INC | BFR | P | 11/12/1996 | men shower ceiling/ 2nd floor rest rooms/ lab framing pending damper insp | JOE | JOE | | BFR | P | 1194917 |
RADIL CONSTRUCTION INC | B= | P | 11/12/1996 | woman locker room/ lunch room/ | JOE | JOE | | B= | P | 1194907 |
RADIL CONSTRUCTION INC | BFR | P | 10/09/1996 | woman locker & lunch room | JOE | JOE | | BFR | P | 1194899 |
RADIL CONSTRUCTION INC | BBB | P | 09/18/1996 | womens locker room ok bbb ,, the rest of the walls don,t even call for bbb but cont. is doing them for an extra | JIMA | JIMA | | BBB | P | 1194891 |
RADIL CONSTRUCTION INC | BBB | P | 09/11/1996 | ZD blding | JOE | JOE | | BBB | P | 1194883 |
RADIL CONSTRUCTION INC | BSP | P | 09/09/1996 | dowels woman locker room | JOE | JOE | | BSP | P | 1194875 |
RADIL CONSTRUCTION INC | BSP | P | 09/04/1996 | re-bar for concrete block | JOE | JOE | | BSP | P | 1194868 |
RADIL CONSTRUCTION INC | BFR | P | 08/30/1996 | ZD BUILDING UPPER FLOOR | DANF | DANF | | BFR | P | 1194860 |
RADIL CONSTRUCTION INC | B16 | N | 08/23/1996 | | JIMA | JIMA | | B16 | N | 1194852 |
FERGUSON ELECTRIC CORPORATION | E= | C | 12/23/1996 | | HAROLD | HAROLD | | E= | C | 1194844 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/20/1996 | | HAROLD | HAROLD | | E= | P | 1194836 |
FERGUSON ELECTRIC CORPORATION | ER | P | 12/10/1996 | | RON | RON | | ER | P | 1194828 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/02/1996 | chem lab | HAROLD | HAROLD | | E= | P | 1194820 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/12/1996 | mens shower | HAROLD | HAROLD | | ER | P | 1194812 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/08/1996 | WALLS CHEMICAL LAB | HAROLD | HAROLD | | ER | P | 1194804 |
FERGUSON ELECTRIC CORPORATION | E= | P | 11/04/1996 | tco cafetera | HAROLD | HAROLD | | E= | P | 1194795 |
FERGUSON ELECTRIC CORPORATION | ES | C | 10/28/1996 | lunch room service 150 amp. | RON | RON | | ES | C | 1194788 |
FERGUSON ELECTRIC CORPORATION | ES | P | 10/25/1996 | | HAROLD | HAROLD | | ES | P | 1194780 |
FERGUSON ELECTRIC CORPORATION | E= | P | 10/25/1996 | tco zd building | HAROLD | HAROLD | | E= | P | 1194771 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/24/1996 | ceiling zd bldg. womans locker | HAROLD | HAROLD | | ER | P | 1194766 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/11/1996 | ZD BUILDING | RED | RED | | ER | P | 1194759 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/09/1996 | ladies locker room,lunch room | HAROLD | HAROLD | | ER | P | 1194751 |
FERGUSON ELECTRIC CORPORATION | ER | P | 09/30/1996 | ceiling in ZD building | TERRY | TERRY | | ER | P | 1194742 |
FERGUSON ELECTRIC CORPORATION | ER | P | 08/27/1996 | O DISCHARGE BLDG | HAROLD | HAROLD | | ER | P | 1194735 |
BOCHNAK MECHANICAL, INC. | H= | C | 11/20/2001 | | JIMV | JIMV | | H= | C | 1194563 |
TRADEWINDS HEATING & AIR-COND. | H= | C | 01/02/1997 | | JOHNW | JOHNW | | H= | C | 1194719 |
TRADEWINDS HEATING & AIR-COND. | HV | C | 01/02/1997 | | JOHNW | JOHNW | | HV | C | 1194727 |
TRADEWINDS HEATING & AIR-COND. | HV | P | 12/30/1996 | need to raise vent on reznor unit for mens lockerroom also waterheater bvent must be inclosed on 2nd level | JOHNW | JOHNW | | HV | P | 1194710 |
TRADEWINDS HEATING & AIR-COND. | HV | P | 12/24/1996 | bvent on waterheater must be inclosed where it goes thru 2nd level | JOHNW | JOHNW | | HV | P | 1194703 |
TRADEWINDS HEATING & AIR-COND. | HD | P | 12/19/1996 | mens locker room | JOHNW | JOHNW | | HD | P | 1194695 |
TRADEWINDS HEATING & AIR-COND. | H= | P | 12/19/1996 | mens locker room | JOHNW | JOHNW | | H= | P | 1194686 |
TRADEWINDS HEATING & AIR-COND. | H= | P | 12/16/1996 | chem. lab complete | JOHNW | JOHNW | | H= | P | 1194678 |
TRADEWINDS HEATING & AIR-COND. | HD | P | 10/08/1996 | above ceiling on lunch and locker room | JOHNW | JOHNW | | HD | P | 1194668 |
BOCHNAK MECHANICAL, INC. | HI | P | 10/02/1996 | main building rough gas line ok 60# tst | JOHNW | JOHNW | | HI | P | 1194579 |
BOCHNAK MECHANICAL, INC. | HI | R | 10/01/1996 | couldn't locate gas test | JOHNW | JOHNW | | HI | R | 1194571 |
TRADEWINDS HEATING & AIR-COND. | HD | P | 09/26/1996 | | JOHNW | JOHNW | | HD | P | 1194663 |
BOCHNAK MECHANICAL, INC. | P= | C | 12/31/1996 | | DAVEL | DAVEL | | P= | C | 1194652 |
BOCHNAK MECHANICAL, INC. | P= | P | 12/23/1996 | shower heads loose,3rd urinal flush valve sticks | DAVEL | DAVEL | | P= | P | 1194645 |
BOCHNAK MECHANICAL, INC. | P16 | C | 12/11/1996 | CHECK DRINKING FOUNTAIN IN MAINTENANCE BUILDING (INSIDE THE GATE TO THE LEFT) - GENERAL INSTALLED AFTER SQUABBLING WITH PLUMBER - PLUMBER SAYS INCORRECTLY INSTALLED. | BOBM | BOBM | | P16 | C | 1194636 |
BOCHNAK MECHANICAL, INC. | PB | C | 11/21/1996 | | DAVEL | DAVEL | | PB | C | 1194629 |
BOCHNAK MECHANICAL, INC. | PB | P | 11/08/1996 | north east side | DAVEL | DAVEL | | PB | P | 1194620 |
BOCHNAK MECHANICAL, INC. | PTO | C | 10/15/1996 | | DAVEL | DAVEL | | PTO | C | 1194612 |
BOCHNAK MECHANICAL, INC. | PTO | P | 10/09/1996 | | DAVEL | DAVEL | | PTO | P | 1194604 |
BOCHNAK MECHANICAL, INC. | PTO | R | 10/08/1996 | lost test | DAVEL | DAVEL | | PTO | R | 1194595 |
BOCHNAK MECHANICAL, INC. | PB | P | 09/03/1996 | | DAVEL | DAVEL | | PB | P | 1194587 |