HUGHES-SMITH, INC | B= | C | 03/26/1998 | Rec'd letter from CTL Thompson(19181) indicating that the final grade around the bldg is adequate as installed | MIKE | MIKE | | B= | C | 1215360 |
HUGHES-SMITH, INC | B= | P | 03/03/1998 | Final grade not complete | MIKE | MIKE | | B= | P | 1215352 |
HUGHES-SMITH, INC | BSP | P | 03/02/1998 | roof ok | PHIL | PHIL | | BSP | P | 1215346 |
HUGHES-SMITH, INC | BSP | P | 01/21/1998 | BROKEN TILES | PHIL | PHIL | | BSP | P | 1216205 |
HUGHES-SMITH, INC | BSP | R | 01/16/1998 | NEED TO MEET WITH ROOFING CONTRACTOR,TO DO THIS INSPECTION. | PHIL | PHIL | | BSP | R | 1216197 |
HUGHES-SMITH, INC | B= | P | 01/14/1998 | Elec & fire final,Seal conduit in telephone rooms,Egress ladder @ guest room,Handrail Exterior steps,Final grade,Roof inspection | MIKE | MIKE | | B= | P | 1215337 |
HUGHES-SMITH, INC | B= | P | 12/23/1997 | West wing complete | MIKE | MIKE | | B= | P | 1216189 |
HUGHES-SMITH, INC | B= | R | 12/16/1997 | WEST WING - UNIT SMOKE DETECTOR MONITORING NOT COMPLETE,FIRE RATING @ PHONE CONDUIT & BOILER ROOM,SMOKE SEAL & ADJUST DR HRDWARE | MIKE | MIKE | | B= | R | 1216181 |
HUGHES-SMITH, INC | BFN | C | 12/12/1997 | | MIKE | MIKE | | BFN | C | 1216157 |
HUGHES-SMITH, INC | BFT | C | 12/12/1997 | | MIKE | MIKE | | BFT | C | 1216173 |
HUGHES-SMITH, INC | BFR | C | 12/12/1997 | | MIKE | MIKE | | BFR | C | 1216165 |
HUGHES-SMITH, INC | B= | R | 12/11/1997 | NOT READY | MIKE | MIKE | | B= | R | 1216141 |
HUGHES-SMITH, INC | BBB | C | 12/11/1997 | | MIKE | MIKE | | BBB | C | 1216149 |
HUGHES-SMITH, INC | BFR | P | 12/08/1997 | ELEVATOR SHAFT OK | DANF | DANF | | BFR | P | 1215330 |
HUGHES-SMITH, INC | BFR | P | 11/26/1997 | CORRIDOR CEILING PENETRATIONS COMPLETE | MIKE | MIKE | | BFR | P | 1216133 |
HUGHES-SMITH, INC | BFR | P | 11/13/1997 | BRIDGE FRMG COMPLETE,FIRERATING @ SINK DRAINS COMPLETE | MIKE | MIKE | | BFR | P | 1216125 |
HUGHES-SMITH, INC | BFR | P | 11/12/1997 | FIREWALL PENETRATIONS UNDER SINK COMPLETE WEST WING 3RD FLR | MIKE | MIKE | | BFR | P | 1216117 |
HUGHES-SMITH, INC | BFR | P | 10/20/1997 | 4TH FLOOR KNUCKLE AREA REFRAME OK | DANF | DANF | | BFR | P | 1216110 |
HUGHES-SMITH, INC | BFR | P | 10/16/1997 | WEST WING CORRIDORS - SEAL CONDUIT & SHEET ROCK AROUD LIGHT FIXTURES LARGER THAN 16 SQ INCHES | MIKE | MIKE | | BFR | P | 1216103 |
HUGHES-SMITH, INC | BFR | P | 10/09/1997 | REVIEWED CORRIDOR FIRERATING PROBLEMS | MIKE | MIKE | | BFR | P | 1216094 |
HUGHES-SMITH, INC | BFR | P | 10/07/1997 | 3RD FLR KNUCKEL FRMG COMPLETE | MIKE | MIKE | | BFR | P | 1216086 |
HUGHES-SMITH, INC | BFR | P | 10/06/1997 | 3RD FLR KNUCKEL FRMG - SEAL FIREWALL PENET.,TIGHTEN ALL LEDGER BOLTS,BEAM FRMG PER DESIGN | MIKE | MIKE | | BFR | P | 1216077 |
HUGHES-SMITH, INC | BFR | P | 09/25/1997 | 2nd floor nuckle & 3rd floor loundry shaft | JOHNP | JOHNP | | BFR | P | 1216069 |
HUGHES-SMITH, INC | BFR | P | 09/22/1997 | 4th floor, East, rooms OK | JOHNP | JOHNP | | BFR | P | 1216061 |
HUGHES-SMITH, INC | BFR | P | 09/19/1997 | 4th floor, East: Shim floor trusses at ext wall, strap plate breaks < 4', nail kingstuds to trimmers better, check on washer box rating in rated walls, OK to ins., 3rd & 4th floor laundry room shafts not framed yet | JOHNP | JOHNP | | BFR | P | 1216054 |
HUGHES-SMITH, INC | BFR | P | 09/15/1997 | 1st floor nuckle & 3rd floor tub drain penetrations OK | JOHNP | JOHNP | | BFR | P | 1216045 |
HUGHES-SMITH, INC | BFR | P | 09/11/1997 | EAST WING 3RD FLR - COMPLETE SHAFT IN LAUNDRY RM,FIRE RATING @ TUB DRAINS | MIKE | MIKE | | BFR | P | 1216037 |
HUGHES-SMITH, INC | BFR | R | 09/05/1997 | BRIDGE FRMG - ITEMS NOT CORRECTED | MIKE | MIKE | | BFR | R | 1216020 |
HUGHES-SMITH, INC | BSP | R | 09/05/1997 | 1. VALLEYS ON NORTH SIDE ARE NOT REPAIRED PROPERLY AND NAILS IN PAN STILL NEED ICE AND WATER 2. TILE LAYED ON SO. EAST VALLEY PANS HAVE NAILS IN PANS | PHIL | PHIL | | BSP | R | 1216029 |
HUGHES-SMITH, INC | BFR | P | 09/02/1997 | EAST WING 3RD FLR - COMPLETE SHAFT IN LAUNDRY RM,SEAL FLOOR PENETRATIONS @ TUBS | MIKE | MIKE | | BFR | P | 1216013 |
HUGHES-SMITH, INC | BFR | P | 08/29/1997 | Garden level soffit OK, 3rd floor corridor draft stopsabove soffits OK | JOHNP | JOHNP | | BFR | P | 1216006 |
HUGHES-SMITH, INC | BSP | P | 08/29/1997 | SO. SIDE OK RECALL FOR NORTH SIDE | PHIL | PHIL | | BSP | P | 1215997 |
HUGHES-SMITH, INC | BFR | P | 08/28/1997 | BRIDGE FRMG - ANCHOR BOLTS,JOIST LEDGER DESIGN,STRAP PLATE BREAKS,ROOF LEDGER DESIGN,HIP /RIDGE/VALLEY/RAFTER CLIPS/SUPPORT,SHIM HEADERS | MIKE | MIKE | | BFR | P | 1215990 |
HUGHES-SMITH, INC | BFR | R | 08/27/1997 | NOT READY | MIKE | MIKE | | BFR | R | 1215973 |
HUGHES-SMITH, INC | BSP | R | 08/27/1997 | 1. damaged ice and water 2. holes and nails in valley pans | PHIL | PHIL | | BSP | R | 1215982 |
HUGHES-SMITH, INC | BFR | P | 08/20/1997 | 2nd floor, East - penetrations OK | JOHNP | JOHNP | | BFR | P | 1215965 |
HUGHES-SMITH, INC | BFR | P | 08/19/1997 | KNUCKEL @ GARDEN LEVEL - COMPLETE SHAFT WALL FRMG | MIKE | MIKE | | BFR | P | 1215957 |
HUGHES-SMITH, INC | BFR | P | 08/08/1997 | 1st floor east wing - floor penetrations OK | JOHNP | JOHNP | | BFR | P | 1215950 |
HUGHES-SMITH, INC | BFR | P | 08/07/1997 | EAST WING GARDEN LEVEL - NORTH SIDE COMPLETE,EAST WING 1ST FLR - FIRERATE ALL FLOOR PENETRATIONS | MIKE | MIKE | | BFR | P | 1215942 |
HUGHES-SMITH, INC | BFR | R | 08/04/1997 | EAST WING 1ST FLR - NOT READY | MIKE | MIKE | | BFR | R | 1215934 |
HUGHES-SMITH, INC | BFR | P | 07/30/1997 | EAST WING GARDEN LEVEL NORTH SIDE - ELEC ROUGH | MIKE | MIKE | | BFR | P | 1215926 |
HUGHES-SMITH, INC | BFR | P | 07/29/1997 | EAST WING GARDEN LEVEL - SEAL PENETRATIONS IN DRAFTSTOPS | MIKE | MIKE | | BFR | P | 1215919 |
HUGHES-SMITH, INC | BFR | P | 07/24/1997 | East wing, north side overframe OK | JOHNP | JOHNP | | BFR | P | 1215910 |
HUGHES-SMITH, INC | BFR | P | 07/23/1997 | NORTH SIDE OF EAST WING ATTIC DRAFT STOPS OK | JOHNP | JOHNP | | BFR | P | 1215903 |
HUGHES-SMITH, INC | BFR | R | 07/18/1997 | EAST WING ATTIC DRAFTSTOPS - COULD NOT ACCESS,HOT MOPPING ROOF | MIKE | MIKE | | BFR | R | 1215896 |
HUGHES-SMITH, INC | BFR | P | 07/16/1997 | EAST WING GARDEN LVL - CORRIDOR CEILINGS | MIKE | MIKE | | BFR | P | 1215885 |
HUGHES-SMITH, INC | BFR | P | 07/11/1997 | 4TH FLR CEILING - COMPLETE SEALING PENETRATIONS IN DRAFTSTOPS | MIKE | MIKE | | BFR | P | 1215877 |
HUGHES-SMITH, INC | BFR | P | 07/10/1997 | EAST WING ROOF FRMG - SEAL DRAFTSTOPS,UPLIFT CLIPS @ TRUSSES,CRIPPLES FROM OVERFRMG TO STRUCTURE BELOW | MIKE | MIKE | | BFR | P | 1215869 |
HUGHES-SMITH, INC | BFR | P | 07/08/1997 | EAST WING ROOF - TRS LAT BRCG,A35 @ CORNERJACK MONO'S,SEAL DRAFTSTOPS | MIKE | MIKE | | BFR | P | 1215862 |
HUGHES-SMITH, INC | BFR | R | 07/03/1997 | WEST WING - 4TH FLR DRAFTSTOPS NOT COMPLETE/NOT INSPECTED(STOP INSULATING),EAST WING ROOF TRUSSES - CORNERJACKS NOT BRG ON BEAMS,NO CORNERJACK HGRS OR MONO TRS CLIPS,MISSING ALL UPLIFT CLIPS,TRS LAT BRCG(STOP SHEETING ROOF) | MIKE | MIKE | | BFR | R | 1215857 |
HUGHES-SMITH, INC | BFR | P | 07/02/1997 | EAST WING - 1ST & 2ND FLR CORRIDOR CEILINGS,WEST WING - 3RD FLR FLR PENETRATIONS COMPLETE/NEED TO INSPECT SHAFT WALLS | MIKE | MIKE | | BFR | P | 1215851 |
HUGHES-SMITH, INC | BFR | P | 06/30/1997 | 3RD FLR FRMG - FLOOR PENETRATIONS NOT CORRECTED | MIKE | MIKE | | BFR | P | 1215846 |
HUGHES-SMITH, INC | BFR | P | 06/25/1997 | 3RD FLR - FIRERATE FLR PENETRATIONS | MIKE | MIKE | | BFR | P | 1215841 |
HUGHES-SMITH, INC | BFR | R | 06/24/1997 | NOT READY | MIKE | MIKE | | BFR | R | 1215835 |
HUGHES-SMITH, INC | BFR | P | 06/19/1997 | REVIEWED SOFFIT & SHAFT WALLS | MIKE | MIKE | | BFR | P | 1215829 |
HUGHES-SMITH, INC | BFR | P | 06/16/1997 | WEST WING 2ND FLR - SEAL DRAFT STOPS & RATED FLR PENETRATIONS | MIKE | MIKE | | BFR | P | 1215823 |
HUGHES-SMITH, INC | BFR | P | 06/13/1997 | West wing , South side type X sheathing OK, recall draft stop 2nd floor | JOHNP | JOHNP | | BFR | P | 1215817 |
HUGHES-SMITH, INC | BFR | P | 06/06/1997 | 1st floor west wing shaft in laundry room, Bsmt corridor ceiling frame in east wing | JOHNP | JOHNP | | BFR | P | 1215808 |
HUGHES-SMITH, INC | BFR | R | 05/30/1997 | CANCELLED | MIKE | MIKE | | BFR | R | 1215803 |
HUGHES-SMITH, INC | BFR | P | 05/29/1997 | WEST WING 1ST FLR - NEED TO INSPECT SHAFT IN LAUNDRY RM | MIKE | MIKE | | BFR | P | 1215797 |
HUGHES-SMITH, INC | BFR | P | 05/28/1997 | WEST WING 1ST FLR - COMPLETE RATINGS @ EXTERIOR WALLS/WASHER BOXES/BATH FANS/SHAFTS,SEAL PENETRATIONS @ DRAFTSTOPS | MIKE | MIKE | | BFR | P | 1215791 |
HUGHES-SMITH, INC | BFR | P | 05/27/1997 | WEST WING 1ST FLR DECK FRMG - SEAL 2HR FIREWALL PENETRATIONS | MIKE | MIKE | | BFR | P | 1215784 |
HUGHES-SMITH, INC | BFR | R | 05/22/1997 | PLANS LOCKED IN TRAILER | MIKE | MIKE | | BFR | R | 1215779 |
HUGHES-SMITH, INC | BFR | P | 05/19/1997 | 3RD FLR CORRIDOR - NOT READY FOR CEILING DRYWALL INSPECTION | MIKE | MIKE | | BFR | P | 1215773 |
HUGHES-SMITH, INC | BFR | P | 05/06/1997 | 3RD & 4TH FLR CORRIDOR CEILINGD ONLY | MIKE | MIKE | | BFR | P | 1215766 |
HUGHES-SMITH, INC | BBB | P | 04/22/1997 | WEST WING - EAST WALL ROOF LEVEL | MIKE | MIKE | | BBB | P | 1215760 |
HUGHES-SMITH, INC | BFR | P | 04/21/1997 | WEST WING CORRIDOR CEILINGS 1ST & 2ND FLR | MIKE | MIKE | | BFR | P | 1215752 |
HUGHES-SMITH, INC | BFN | P | 04/10/1997 | FDTN WALLS @ CONNECTING BRIDGE | MIKE | MIKE | | BFN | P | 1215745 |
HUGHES-SMITH, INC | BFN | P | 04/09/1997 | CONNECTING BRIDGE FDTN WALLS | MIKE | MIKE | | BFN | P | 1215739 |
HUGHES-SMITH, INC | BFN | P | 04/08/1997 | LOWER FDTN WALLS FOR CONNECTING BRIDGE | MIKE | MIKE | | BFN | P | 1215728 |
HUGHES-SMITH, INC | BFT | P | 04/08/1997 | UPPER FTGS FOR CONNECTING BRIDGE | MIKE | MIKE | | BFT | P | 1215734 |
HUGHES-SMITH, INC | BFT | P | 04/04/1997 | East bridge ftg OK | JOHNP | JOHNP | | BFT | P | 1215722 |
HUGHES-SMITH, INC | BFN | P | 04/03/1997 | SOUTH ENTRANCE FDTN | MIKE | MIKE | | BFN | P | 1215715 |
HUGHES-SMITH, INC | BFN | P | 04/02/1997 | 3 patios | JOHNP | JOHNP | | BFN | P | 1215710 |
HUGHES-SMITH, INC | BFN | P | 04/01/1997 | EAST WING - (2) PATIO FDTN WALLS SE CORNER | MIKE | MIKE | | BFN | P | 1215702 |
HUGHES-SMITH, INC | BBB | P | 04/01/1997 | WEST STAIRWELL - EAST WALL/4TH FLR | MIKE | MIKE | | BBB | P | 1215696 |
HUGHES-SMITH, INC | BBB | P | 03/28/1997 | 3RD FLR CENTRAL SRAIR TOWER | MIKE | MIKE | | BBB | P | 1215690 |
HUGHES-SMITH, INC | BBB | P | 03/26/1997 | EAST WING - 2ND FLR EAST WALL & 1/2 SOUTH WALL | MIKE | MIKE | | BBB | P | 1215678 |
HUGHES-SMITH, INC | BSP | P | 03/26/1997 | REVIEWED FIREWALL CONFIG & EXTERIOR SHEATHING NAIL SPACING WEST WING/2ND FLR/SOUTH WALL | MIKE | MIKE | | BSP | P | 1215685 |
HUGHES-SMITH, INC | BBB | P | 03/21/1997 | 2ND FLR LVL INTERIOR PARTITION WALLS BETWEEN EAST & WEST WING | MIKE | MIKE | | BBB | P | 1215673 |
HUGHES-SMITH, INC | BBB | P | 03/18/1997 | NORTH WALL 2ND FLR CONNECTION BETWEEN EAST & WEST WING | MIKE | MIKE | | BBB | P | 1215666 |
HUGHES-SMITH, INC | BBB | P | 03/13/1997 | EAST WING - NORTH WALL,2ND FLR LEVEL COMPLETE | MIKE | MIKE | | BBB | P | 1215660 |
HUGHES-SMITH, INC | BBB | P | 03/12/1997 | EAST WING - NORTH WALL,EAST HALF,2ND FLR | MIKE | MIKE | | BBB | P | 1215655 |
HUGHES-SMITH, INC | BBB | P | 03/07/1997 | Elevator shaft at 2nd story | JOHNP | JOHNP | | BBB | P | 1215649 |
HUGHES-SMITH, INC | BBB | P | 03/04/1997 | 1ST FLR LEVEL OF CENTRAL STAIRWELL & ELEVATOR SHAFT | MIKE | MIKE | | BBB | P | 1215642 |
HUGHES-SMITH, INC | BBB | P | 02/27/1997 | | JOHNP | JOHNP | | BBB | P | 1215636 |
HUGHES-SMITH, INC | BBB | P | 02/20/1997 | EAST WING - BAR JOIST BRG HT NORTH & EAST WALL | MIKE | MIKE | | BBB | P | 1215623 |
HUGHES-SMITH, INC | BFN | P | 02/20/1997 | WEST WING - NORTH FDTN WALL COMPLETE | MIKE | MIKE | | BFN | P | 1215630 |
HUGHES-SMITH, INC | BBB | P | 02/18/1997 | EAST WING - TOP OF NORTH WALL | MIKE | MIKE | | BBB | P | 1215606 |
HUGHES-SMITH, INC | BFT | P | 02/18/1997 | EAST WING - COMPLETE NORTH WALL FTG | MIKE | MIKE | | BFT | P | 1215612 |
HUGHES-SMITH, INC | BBB | R | 02/14/1997 | WEST WING - NORTH WALL NOT READY | MIKE | MIKE | | BBB | R | 1215590 |
HUGHES-SMITH, INC | BFN | P | 02/14/1997 | WEST WING - TWO CENTER FDTN WALLS COMPLETE,SOUTH FDTN WALL COMPLETE | MIKE | MIKE | | BFN | P | 1215598 |
HUGHES-SMITH, INC | BBB | P | 02/12/1997 | west wing and south end | FRANK | FRANK | | BBB | P | 1215582 |
HUGHES-SMITH, INC | BFT | P | 02/10/1997 | WEST WING - BOTH INTERIOR FTGS COMPLETE TO EAST WING | MIKE | MIKE | | BFT | P | 1215575 |
HUGHES-SMITH, INC | BFN | P | 02/06/1997 | 3 patios | JOHNP | JOHNP | | BFN | P | 1215568 |
HUGHES-SMITH, INC | BFN | P | 02/05/1997 | EAST WING - NORTH FDTN WALL COMPLETE | MIKE | MIKE | | BFN | P | 1215550 |
HUGHES-SMITH, INC | BFT | R | 02/05/1997 | NOT READY | MIKE | MIKE | | BFT | R | 1215560 |
HUGHES-SMITH, INC | BFN | P | 02/03/1997 | INTERIOR CORRIDOR WALL NORTH COMPLT | RICH | RICH | | BFN | P | 1215542 |
HUGHES-SMITH, INC | BFN | P | 01/30/1997 | EAST WING - SOUTH INTERIOR FDTN WALL/SPREAD TOP BAR/ADD 2ND TOP BAR TO NORTH RETAINING WALL | MIKE | MIKE | | BFN | P | 1215535 |
HUGHES-SMITH, INC | BFN | P | 01/28/1997 | EAST WING - EAST END FDTN WALLS(INSTALL #6 BAR AS SPECIFIED ON FDTN DESIGN) | MIKE | MIKE | | BFN | P | 1215527 |
HUGHES-SMITH, INC | BFN | P | 01/27/1997 | WEST WING - WEST FDTN WALLS @ STAIR WELL | MIKE | MIKE | | BFN | P | 1215518 |
HUGHES-SMITH, INC | BFN | R | 01/22/1997 | NOT READY | MIKE | MIKE | | BFN | R | 1215510 |
HUGHES-SMITH, INC | BFN | P | 01/21/1997 | EAST WING - SOUTH FDTN WALL | MIKE | MIKE | | BFN | P | 1215495 |
HUGHES-SMITH, INC | BFT | P | 01/21/1997 | WEST WING - WEST STAIRWELL FTGS | MIKE | MIKE | | BFT | P | 1215503 |
HUGHES-SMITH, INC | BFN | P | 01/16/1997 | SEE SHT S-1,WEST WALL,LOWER FOOTER OK | RICH | RICH | | BFN | P | 1215487 |
HUGHES-SMITH, INC | BFN | P | 01/15/1997 | WEST WING - SOUTH CENTER FDTN WALL | MIKE | MIKE | | BFN | P | 1215471 |
HUGHES-SMITH, INC | BFT | R | 01/15/1997 | WORK NOT COMPLETE | MIKE | MIKE | | BFT | R | 1215480 |
HUGHES-SMITH, INC | BFT | P | 01/09/1997 | EAST WING - EAST END FTGS COMPLETE | MIKE | MIKE | | BFT | P | 1215464 |
HUGHES-SMITH, INC | BFN | P | 01/09/1997 | WEST WING - NORTH CENTER FDTN WALL | MIKE | MIKE | | BFN | P | 1215456 |
HUGHES-SMITH, INC | BFN | R | 01/08/1997 | NOT READY | MIKE | MIKE | | BFN | R | 1215439 |
HUGHES-SMITH, INC | BFT | P | 01/08/1997 | EAST WING - MECHANICAL RM FTGS NORTH WALL | MIKE | MIKE | | BFT | P | 1215448 |
HUGHES-SMITH, INC | BFT | P | 01/07/1997 | EAST WING - TWO CENTER & NORTH CONT. FTGS | MIKE | MIKE | | BFT | P | 1215431 |
HUGHES-SMITH, INC | BFT | P | 01/06/1997 | CENTRAL STAIR TOWER FTG - REMOVE SNOW & LOOSE DIRT | MIKE | MIKE | | BFT | P | 1215424 |
HUGHES-SMITH, INC | BFT | P | 01/03/1997 | EAST WING - SOUTH CONT. FTG,NEED COMPACTION TEST REPORT FOR FILL UNDER FTG | MIKE | MIKE | | BFT | P | 1215416 |
HUGHES-SMITH, INC | BFN | P | 01/03/1997 | WEST WING - NORTH FDTN WALL(INCLUDES PORCH & MECH RM FDTN WALLS) | MIKE | MIKE | | BFN | P | 1215409 |
HUGHES-SMITH, INC | BFN | R | 12/31/1996 | NOT READY | MIKE | MIKE | | BFN | R | 1215403 |
HUGHES-SMITH, INC | BFT | P | 12/30/1996 | WEST WING - EAST CONTINUES FTG | MIKE | MIKE | | BFT | P | 1215396 |
HUGHES-SMITH, INC | BFT | P | 12/26/1996 | west wing - 125' north int. cont. ftgf | JIMA | JIMA | | BFT | P | 1215387 |
HUGHES-SMITH, INC | BFT | P | 12/23/1996 | WEST WING - 125' SOUTH INTERIOR CONT FTG | MIKE | MIKE | | BFT | P | 1215381 |
HUGHES-SMITH, INC | BFT | P | 12/20/1996 | WEST WING - 125' SOUTH WALL | MIKE | MIKE | | BFT | P | 1215373 |
HUGHES-SMITH, INC | BFT | P | 12/12/1996 | WEST WING - 125' OF NORTH WALL | MIKE | MIKE | | BFT | P | 1215366 |
FERGUSON ELECTRIC CORPORATION | E= | C | 01/15/1998 | | MIKEC | MIKEC | | E= | C | 1216387 |
FERGUSON ELECTRIC CORPORATION | E= | C | 01/15/1998 | | JAN | JAN | | E= | C | 1216599 |
FERGUSON ELECTRIC CORPORATION | E= | P | 01/06/1998 | 3rd+4th fl. | RON | RON | | E= | P | 1216591 |
FERGUSON ELECTRIC CORPORATION | ER | P | 12/23/1997 | 4TH FLOOR CEILING EAST | MIKEC | MIKEC | | ER | P | 1216379 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/23/1997 | 1ST AND 2ND FLOOR | MIKEC | MIKEC | | E= | P | 1216374 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/19/1997 | 1.2.3 FLOOR CORR | MIKEC | MIKEC | | E= | P | 1216576 |
FERGUSON ELECTRIC CORPORATION | ER | P | 12/19/1997 | CEILING AT GAREN LEVEL | MIKEC | MIKEC | | ER | P | 1216583 |
FERGUSON ELECTRIC CORPORATION | ER | P | 12/11/1997 | 1ST FLOOR CEILING | MIKEC | MIKEC | | ER | P | 1216569 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/05/1997 | 3rd and 4th floor units except units being remodeled,knuckle areas 3rd and 4th | MIKEC | MIKEC | | E= | P | 1216562 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/04/1997 | 1ST AND 2ND FLOOR UNITS EXCEPT UNITS BEING REMODELED | MIKEC | MIKEC | | E= | P | 1216554 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/25/1997 | ALREADY INSPECTED | MIKEC | MIKEC | | ER | P | 1216545 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/20/1997 | 3 AND 4TH FLOOR CORR. CEILINGS | MIKEC | MIKEC | | ER | P | 1216537 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/03/1997 | 1ST AND 2ND FLOOR WEST CORR. | MIKEC | MIKEC | | ER | P | 1216530 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/17/1997 | 4th floor knuckle ceiling | IKE | IKE | | ER | P | 1216521 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/03/1997 | 3RD FLOOR CNTR | MIKEC | MIKEC | | ER | P | 1216514 |
FERGUSON ELECTRIC CORPORATION | ER | P | 09/24/1997 | 2ND FLOOR CENTER | MIKEC | MIKEC | | ER | P | 1216506 |
FERGUSON ELECTRIC CORPORATION | ER | P | 09/15/1997 | BREEZEWAY AND 1ST. FLOOR CENTER | MIKEC | MIKEC | | ER | P | 1216498 |
FERGUSON ELECTRIC CORPORATION | ES | C | 09/09/1997 | 3PH 120/208V 4W WYE 4000 AMP UG FERGUSON ELEC. | MIKEC | MIKEC | | ES | C | 1216489 |
FERGUSON ELECTRIC CORPORATION | ER | P | 09/05/1997 | 4TH FLOOR EAST | MIKEC | MIKEC | | ER | P | 1216481 |
FERGUSON ELECTRIC CORPORATION | ER | P | 08/20/1997 | 3RD. FLOOR AND GARDENLEVEL(NO ACCESS TO PERMIT) | MIKEC | MIKEC | | ER | P | 1216473 |
FERGUSON ELECTRIC CORPORATION | ER | P | 08/13/1997 | 2ND FLOOR EAST | MIKEC | MIKEC | | ER | P | 1216466 |
FERGUSON ELECTRIC CORPORATION | ER | P | 07/31/1997 | 1ST. FLOOR EAST BASEMENT APTS. | MIKEC | MIKEC | | ER | P | 1216458 |
FERGUSON ELECTRIC CORPORATION | ER | P | 06/25/1997 | 4 TH FLOOR WEST | MIKEC | MIKEC | | ER | P | 1216450 |
FERGUSON ELECTRIC CORPORATION | ER | P | 06/17/1997 | 3rd floor west wing | ARNOLD | ARNOLD | | ER | P | 1216441 |
FERGUSON ELECTRIC CORPORATION | ER | P | 06/02/1997 | 2 ND. FLOORWEST.PUT BUSHINGS IN BOXES WHERE REQUIRED | MIKEC | MIKEC | | ER | P | 1216433 |
FERGUSON ELECTRIC CORPORATION | ER | P | 05/14/1997 | 1ST FLOOR WEST | MIKEC | MIKEC | | ER | P | 1216425 |
FERGUSON ELECTRIC CORPORATION | ER | P | 05/05/1997 | 1 ST. FLOOR WEST END | MIKEC | MIKEC | | ER | P | 1216417 |
FERGUSON ELECTRIC CORPORATION | ESL | P | 03/06/1997 | west end slab ok | TERRY | TERRY | | ESL | P | 1216402 |
FERGUSON ELECTRIC CORPORATION | ESL | P | 02/28/1997 | | MIKEC | MIKEC | | ESL | P | 1216395 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 01/14/1998 | | DAVEL | DAVEL | | H= | C | 1216607 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 01/14/1998 | | DAVEL | DAVEL | | H= | C | 1216647 |
J D STEWARD AIR CONDITIONING | H= | P | 12/23/1997 | 1ST 2ND & 3RD FLOORS EAST EAST WING OK | JOHNW | JOHNW | | H= | P | 1216366 |
J D STEWARD AIR CONDITIONING | H= | P | 12/04/1997 | west wing and knuckle complete ok tco | DAVEL | DAVEL | | H= | P | 1216357 |
J D STEWARD AIR CONDITIONING | H= | P | 10/28/1997 | 1st 2nd 3rd and 4th west end units complete | JOHNW | JOHNW | | H= | P | 1216348 |
J D STEWARD AIR CONDITIONING | HV | C | 10/13/1997 | shafts cleaned | DAVEL | DAVEL | | HV | C | 1216340 |
J D STEWARD AIR CONDITIONING | HV | P | 10/06/1997 | EAST WING 4TH FLOOR OK | DAVEL | DAVEL | | HV | P | 1216333 |
J D STEWARD AIR CONDITIONING | HC | C | 10/06/1997 | | DAVEL | DAVEL | | HC | C | 1216324 |
J D STEWARD AIR CONDITIONING | HD | P | 09/16/1997 | bridge area ok check radiation damper at final | JOHNW | JOHNW | | HD | P | 1216316 |
J D STEWARD AIR CONDITIONING | HD | P | 08/22/1997 | 4th floor east wing above ceiling ok/ firedampers in center knuckle all floors ok | JOHNW | JOHNW | | HD | P | 1216309 |
J D STEWARD AIR CONDITIONING | HD | R | 08/18/1997 | need to specify what area / looked for Ron S couldn't locate asked one of the tinners he didn't know what area | JOHNW | JOHNW | | HD | R | 1216301 |
J D STEWARD AIR CONDITIONING | HD | P | 08/05/1997 | 3rd and 4th floors west end ok | JOHNW | JOHNW | | HD | P | 1216293 |
J D STEWARD AIR CONDITIONING | HD | P | 07/31/1997 | east wing 1st, 2nd & some of 3rd level ok for above ceiling rough and also firedampers on those levels ok for rough in | JOHNW | JOHNW | | HD | P | 1216285 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 07/09/1997 | | DAVEL | DAVEL | | HI | C | 1216640 |
J D STEWARD AIR CONDITIONING | HD | P | 07/07/1997 | 1st & 2nd floors above ceiling rough on exhaust fans ok / 2nd floor duct work for HVAC ok to soffitt also 2nd and 3rd west wing shafts ok | JOHNW | JOHNW | | HD | P | 1216277 |
J D STEWARD AIR CONDITIONING | HD | P | 06/24/1997 | 1st floor HVAC duct work on west end ok | JOHNW | JOHNW | | HD | P | 1216269 |
J D STEWARD AIR CONDITIONING | HD | P | 06/17/1997 | 3rd and 4th floor west end exhaust fan, duct work and dryer duct | JOHNW | JOHNW | | HD | P | 1216261 |
J D STEWARD AIR CONDITIONING | HD | P | 06/05/1997 | PVC ventson 4 furnaces in basement ok | JOHNW | JOHNW | | HD | P | 1216245 |
J D STEWARD AIR CONDITIONING | HD | P | 06/05/1997 | firedampers 1st level west end framing ok | JOHNW | JOHNW | | HD | P | 1216253 |
J D STEWARD AIR CONDITIONING | HD | P | 06/04/1997 | 4TH FLOOR WEST WING BATH FAN AND CLOTHES DRYER DUCTS | DAVEL | DAVEL | | HD | P | 1216237 |
J D STEWARD AIR CONDITIONING | HD | P | 05/20/1997 | 2ND LEVEL WEST END EXHAUST DUCT AND DRYER VENTS | JOHNW | JOHNW | | HD | P | 1216229 |
J D STEWARD AIR CONDITIONING | HD | P | 05/13/1997 | 1st floor west wing bath vents and dryer vents ok | JOHNW | JOHNW | | HD | P | 1216221 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 05/08/1997 | WEST WING AND 1ST AND GARDEN LEVEL EAST WING | DAVEL | DAVEL | | HI | P | 1216631 |
J D STEWARD AIR CONDITIONING | HD | R | 05/06/1997 | NOT READY | DAVEL | DAVEL | | HD | R | 1216213 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 04/17/1997 | inside gas main | DAVEL | DAVEL | | HI | P | 1216623 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 01/14/1998 | | DAVEL | DAVEL | | P= | C | 1216614 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 01/14/1998 | | DAVEL | DAVEL | | P= | C | 1216763 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 12/18/1997 | garden level and 1st floor | DAVEL | DAVEL | | P= | P | 1216754 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 12/08/1997 | core area | DAVEL | DAVEL | | P= | P | 1216745 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 12/02/1997 | final west wing complete | DAVEL | DAVEL | | P= | P | 1216737 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 11/04/1997 | 1st&2nd floors except h/c units | DAVEL | DAVEL | | P= | P | 1216730 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 07/10/1997 | | DAVEL | DAVEL | | PTO | C | 1216721 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | C | 07/09/1997 | east wing | DAVEL | DAVEL | | PRD | C | 1216701 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 07/09/1997 | east wing north side | DAVEL | DAVEL | | PTO | P | 1216713 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 05/08/1997 | WEST WING COMPLETE | DAVEL | DAVEL | | PRD | P | 1216685 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 05/08/1997 | WEST WING COMPLETE | DAVEL | DAVEL | | PTO | P | 1216695 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 03/06/1997 | | DAVEL | DAVEL | | PB | C | 1216678 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 02/27/1997 | EAST WING COMPLETE | DAVEL | DAVEL | | PB | P | 1216670 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 02/19/1997 | east wingtrunk and tie in to west trunk | DAVEL | DAVEL | | PB | P | 1216663 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 02/06/1997 | west wing trunk line | DAVEL | DAVEL | | PB | P | 1216656 |