BLACK FOREST CONSTRUCTION | B= | C | 06/24/1998 | HAVE ENG ON DECK CANT FOR FRANK | GREGC | GREGC | | B= | C | 1370486 |
BLACK FOREST CONSTRUCTION | B= | P | 05/14/1998 | firedoor garage/crawl space vents/point load/final grading/house numbers/deck plans and attached to cantilever | FRANK | FRANK | | B= | P | 1370444 |
BLACK FOREST CONSTRUCTION | BLA | C | 02/12/1998 | | JIMP | JIMP | | BLA | C | 1370438 |
BLACK FOREST CONSTRUCTION | BFR | C | 01/28/1998 | ok framing needs to pay trip fee asap/needs 1 point load in bsmnnt above column in front of stairs by final/i marked it on the column with arrow | FRANK | FRANK | | BFR | C | 1370430 |
BLACK FOREST CONSTRUCTION | BFR | T | 01/21/1998 | PAID (REC#: 290870)POINT LOADS STILL MISSING /FIRESTOPS ALL/GIRDER NAILING NOT COMPLETE/OK TO INSL | FRANK | FRANK | | BFR | T | 1370478 |
BLACK FOREST CONSTRUCTION | BFR | R | 01/15/1998 | vent insp/see back of plans/ok letter on cut joist and micro garage on file | FRANK | FRANK | | BFR | R | 1370422 |
BLACK FOREST CONSTRUCTION | BFN | C | 10/14/1997 | | JIMP | JIMP | | BFN | C | 1370470 |
BLACK FOREST CONSTRUCTION | BFN | P | 10/13/1997 | WEST WALLS, NO PADS | JIMP | JIMP | | BFN | P | 1370461 |
BLACK FOREST CONSTRUCTION | BFD | C | 10/09/1997 | no floating walls needed ok soils/5%/ | FRANK | FRANK | | BFD | C | 1370457 |
BLACK FOREST CONSTRUCTION | BFN | P | 10/03/1997 | ok wall per design/ok open hole/needs stamped soils letter asap/also need compaction letter and pad inspection when ready/drain around living area | FRANK | FRANK | | BFN | P | 1370451 |
CIMARRON ELECTRIC CORP | E= | C | 04/01/1998 | CAN'T GET TO CARD. TOO MUDDY! | GLENN | GLENN | | E= | C | 1370545 |
CIMARRON ELECTRIC CORP | ER | C | 01/14/1998 | CANT GET TO PERMIT. | GLENN | GLENN | | ER | C | 1370522 |
CIMARRON ELECTRIC CORP | ES | C | 01/14/1998 | 3W/UG CIMARRON ELECT. | GLENN | GLENN | | ES | C | 1370529 |
CIMARRON ELECTRIC CORP | EUG | C | 01/14/1998 | | GLENN | GLENN | | EUG | C | 1370537 |
KAHUNA HTG. & AIR CONDITIONING | H= | C | 04/03/1998 | | TIM | TIM | | H= | C | 1370585 |
KAHUNA HTG. & AIR CONDITIONING | HC | C | 01/29/1998 | o.k. for meter | TIM | TIM | | HC | C | 1370577 |
KAHUNA HTG. & AIR CONDITIONING | HV | C | 01/20/1998 | | TIM | TIM | | HV | C | 1370569 |
KAHUNA HTG. & AIR CONDITIONING | HV | T | 01/15/1998 | PAID (REC#: 288903)not corrected | TIM | TIM | | HV | T | 1370562 |
KAHUNA HTG. & AIR CONDITIONING | HV | R | 01/09/1998 | IN-AD CLEARENCE AT TOP MAIN FLOOR | TIM | TIM | | HV | R | 1370554 |
A.P. TRENCHING | HI | C | 12/19/1997 | 10 LBS | TIM | TIM | | HI | C | 1370601 |
A.P. TRENCHING | HO | C | 12/18/1997 | 10 lbs | TIM | TIM | | HO | C | 1370593 |
JOLLY PLUMBING & HEATING INC. | P= | C | 04/06/1998 | completed 4-3 | TIM | TIM | | P= | C | 1370506 |
JOLLY PLUMBING & HEATING INC. | P= | C | 04/03/1998 | | TIM | TIM | | P= | C | 1370499 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 12/24/1997 | | TIM | TIM | | PTO | C | 1370492 |
JOLLY PLUMBING & HEATING INC. | PB | C | 10/09/1997 | | TIM | TIM | | PB | C | 1370514 |