THE COPESTONE COMPANY | B= | C | 03/05/1998 | | JOE | JOE | | B= | C | 1367115 |
THE COPESTONE COMPANY | B= | P | 03/04/1998 | smoke seals at radiology conference room door,PARTIAL FINAL OK | RICH | RICH | | B= | P | 1367136 |
THE COPESTONE COMPANY | BFR | C | 02/26/1998 | COMPLTD | RICH | RICH | | BFR | C | 1367099 |
THE COPESTONE COMPANY | BSP | P | 02/26/1998 | ABOVE LID PENETRATIONS AT RATED WALLS OK | RICH | RICH | | BSP | P | 1367107 |
THE COPESTONE COMPANY | BFR | P | 02/02/1998 | walls ok,2nd floor shaft ok,recall above ceiling penetrations check | RICH | RICH | | BFR | P | 1367091 |
THE COPESTONE COMPANY | BFR | P | 01/29/1998 | phase 2 ,framing,ok,recal l ihr back rock seal electric panels,2nd floor shaft wall | RICH | RICH | | BFR | P | 1367084 |
THE COPESTONE COMPANY | B= | P | 12/12/1997 | phase 1 only | JOE | JOE | | B= | P | 1367129 |
THE COPESTONE COMPANY | BFR | P | 11/14/1997 | lower level,phase 1,walls ok,seal all pentrations at 1hr walls | RICH | RICH | | BFR | P | 1367123 |
GREEN ELECTRIC INC | E= | C | 02/24/1998 | | RON | RON | | E= | C | 1367143 |
GREEN ELECTRIC INC | ER | P | 01/28/1998 | walls, phase 2. | RON | RON | | ER | P | 1367176 |
GREEN ELECTRIC INC | E= | P | 12/11/1997 | not complete. | RON | RON | | E= | P | 1367168 |
GREEN ELECTRIC INC | ER | P | 12/05/1997 | CEILING. | RON | RON | | ER | P | 1367159 |
GREEN ELECTRIC INC | ER | P | 11/13/1997 | walls. | RON | RON | | ER | P | 1367151 |
ROBBINS HEATING & AIR CONDITIONING, INC. | H= | C | 02/25/1998 | | JOHNW | JOHNW | | H= | C | 1367046 |
ROBBINS HEATING & AIR CONDITIONING, INC. | HD | C | 02/25/1998 | | JOHNW | JOHNW | | HD | C | 1367054 |
ROBBINS HEATING & AIR CONDITIONING, INC. | H= | R | 02/23/1998 | fire and fire/smoke dampers can't be firecaulked also need trim angle | JOHNW | JOHNW | | H= | R | 1367038 |
ROBBINS HEATING & AIR CONDITIONING, INC. | HD | P | 01/27/1998 | ABOVE CEILING ROUGH OK | JOHNW | JOHNW | | HD | P | 1367077 |
ROBBINS HEATING & AIR CONDITIONING, INC. | H= | P | 12/03/1997 | phase 1 complete | JOHNW | JOHNW | | H= | P | 1367068 |
ROBBINS HEATING & AIR CONDITIONING, INC. | HD | P | 11/25/1997 | phase 1 above ceiling rough ok except for firedamper installation also conferance room rough in | JOHNW | JOHNW | | HD | P | 1367061 |
DILLOW PLUMBING & HEATING INC | P= | C | 02/26/1998 | | DAVEL | DAVEL | | P= | C | 1367002 |
DILLOW PLUMBING & HEATING INC | PTO | C | 01/21/1998 | | JIMV | JIMV | | PTO | C | 1367032 |
DILLOW PLUMBING & HEATING INC | PB | C | 01/08/1998 | both phases complete | JIMV | JIMV | | PB | C | 1366995 |
DILLOW PLUMBING & HEATING INC | PB | P | 01/05/1998 | need restroom | JIMV | JIMV | | PB | P | 1366990 |
DILLOW PLUMBING & HEATING INC | P= | P | 12/09/1997 | DILLOW CALLED, THIS IS BEING DONE IN 2 PHASES | JIMV | JIMV | | P= | P | 1367025 |
DILLOW PLUMBING & HEATING INC | PTO | P | 11/12/1997 | | DAVEL | DAVEL | | PTO | P | 1367018 |
DILLOW PLUMBING & HEATING INC | P16 | C | 11/07/1997 | OK TO USE AIR ADDMITTANCE VALVE IF A MATCH FOR THE REQUIRED FIXTURE UNITS. | BOBM | BOBM | | P16 | C | 1367012 |
DILLOW PLUMBING & HEATING INC | PB | P | 11/05/1997 | DILLOW CALLED, THIS IS BEING DONE IN 2 PHASES--KL | JIMV | JIMV | | PB | P | 1367006 |