HUGHES-SMITH, INC | B= | C | 02/22/1999 | FIRE FINAL OK PER RON BOSTON | ANDY | ANDY | | B= | C | 1399095 |
HUGHES-SMITH, INC | B= | P | 02/03/1999 | Fire final | MIKE | MIKE | | B= | P | 1399040 |
HUGHES-SMITH, INC | BSP | P | 01/21/1999 | Tile roof OK | MIKE | MIKE | | BSP | P | 1399029 |
HUGHES-SMITH, INC | B= | P | 01/19/1999 | 5th flr - Adjust door hardware #502/526,Elec & fire final,Roof inspection | MIKE | MIKE | | B= | P | 1399021 |
HUGHES-SMITH, INC | B= | P | 01/15/1999 | 2nd flr OK,1st flr - Occ sign rm #129 | MIKE | MIKE | | B= | P | 1399013 |
HUGHES-SMITH, INC | B= | P | 01/14/1999 | 3rd flr - Adjust door hardware #302/325/314,Seal firewall rm #3004th flr - Adjust door hardware #402/403/433 | MIKE | MIKE | | B= | P | 1399006 |
HUGHES-SMITH, INC | B= | P | 01/13/1999 | 2nd flr - Adjust dr hardware 213,Seal firewall penetrations 206 & 215 | MIKE | MIKE | | B= | P | 1398998 |
HUGHES-SMITH, INC | B= | P | 01/12/1999 | 1st flr - Adjust door hardware 103/112/123/125/128/133,Occ sign rm #129,Seal firewall penetrations rm # 126 & 109 | MIKE | MIKE | | B= | P | 1398989 |
HUGHES-SMITH, INC | BFR | C | 12/24/1998 | | MIKE | MIKE | | BFR | C | 1398981 |
HUGHES-SMITH, INC | BFR | P | 12/23/1998 | Elec rough inspection | MIKE | MIKE | | BFR | P | 1398965 |
HUGHES-SMITH, INC | BSP | P | 12/23/1998 | Reviewed final items in bridge | MIKE | MIKE | | BSP | P | 1398973 |
HUGHES-SMITH, INC | BSP | P | 12/09/1998 | Rec'd structural steel inspection report from CTL THompson(19181) | MIKE | MIKE | | BSP | P | 1398958 |
HUGHES-SMITH, INC | BFR | P | 12/09/1998 | 5th flr above ceiling in elevator lobby | MIKE | MIKE | | BFR | P | 1398951 |
HUGHES-SMITH, INC | BFR | P | 12/08/1998 | Tunnel frmg OK,Rec'd frmg corrections for tunnel frmg from Morgan & Assoc. | MIKE | MIKE | | BFR | P | 1398935 |
HUGHES-SMITH, INC | BSP | P | 12/08/1998 | Need structural steel frmg inspection letter stamped | MIKE | MIKE | | BSP | P | 1398943 |
HUGHES-SMITH, INC | BFR | P | 12/03/1998 | 4th Flr frmg OK,5th Flr frmg OK,Bridge frmg - Need eng letter for beam connection to triple post,Need structural steel inspection letter for hole bldg | MIKE | MIKE | | BFR | P | 1398926 |
HUGHES-SMITH, INC | BFR | R | 12/01/1998 | 4th flr elec rm @ elev lobby - Shtrocked w/o reinspection | MIKE | MIKE | | BFR | R | 1398919 |
HUGHES-SMITH, INC | BFR | P | 11/30/1998 | Exterior rms OK,Need to inspect interior rms & elevator lobby | MIKE | MIKE | | BFR | P | 1398911 |
HUGHES-SMITH, INC | BSP | P | 11/23/1998 | 4th frmg OK | MIKE | MIKE | | BSP | P | 1398903 |
HUGHES-SMITH, INC | BSP | P | 11/19/1998 | Reviewed Problems @ trash chute & elev equip room | MIKE | MIKE | | BSP | P | 1398895 |
HUGHES-SMITH, INC | BSP | P | 11/17/1998 | 5th flr - 1st layer shtrock on all shaft walls OK | MIKE | MIKE | | BSP | P | 1398887 |
HUGHES-SMITH, INC | BFR | P | 11/16/1998 | 4TH FLR FRMG - NORTH UNITS OK EXCEPT TELEPHONE EQUIP RM | MIKE | MIKE | | BFR | P | 1399089 |
HUGHES-SMITH, INC | BSP | R | 11/13/1998 | Shafts 5th flr not ready | MIKE | MIKE | | BSP | R | 1398879 |
HUGHES-SMITH, INC | BLA | C | 11/13/1998 | | MIKE | MIKE | | BLA | C | 1398869 |
HUGHES-SMITH, INC | BSP | P | 11/05/1998 | Entrance lobby fire caulk OK | MIKE | MIKE | | BSP | P | 1398863 |
HUGHES-SMITH, INC | BFR | P | 11/05/1998 | 3rd flr frmg - Reviewed floor fire caulk details. Caulk req'd on top of flr only | MIKE | MIKE | | BFR | P | 1398854 |
HUGHES-SMITH, INC | BFR | P | 11/04/1998 | 3rd flr frmg OK - Caulk all pipe penetrations through 4th floor | MIKE | MIKE | | BFR | P | 1398839 |
HUGHES-SMITH, INC | BSP | P | 11/04/1998 | 1st flr entrance lobby - Install duct & damper over north door,Fire caulk chiller piping over south door | MIKE | MIKE | | BSP | P | 1398847 |
HUGHES-SMITH, INC | BSP | P | 11/02/1998 | 1st layer 5th flr shaft walls - (9) interior shafts(Five more to inspect) | MIKE | MIKE | | BSP | P | 1398831 |
HUGHES-SMITH, INC | BLA | P | 11/02/1998 | East elevation OK | MIKE | MIKE | | BLA | P | 1398823 |
HUGHES-SMITH, INC | BSP | P | 10/30/1998 | | MIKE | MIKE | | BSP | P | 1398815 |
HUGHES-SMITH, INC | BLA | P | 10/29/1998 | South elevation OK | MIKE | MIKE | | BLA | P | 1398806 |
HUGHES-SMITH, INC | BFR | P | 10/29/1998 | 3rd flr - North six rooms OK | MIKE | MIKE | | BFR | P | 1398799 |
HUGHES-SMITH, INC | BSP | P | 10/28/1998 | 4TH FLR SHAFTS - 1ST LAYER CORE BOARD | MIKE | MIKE | | BSP | P | 1399082 |
HUGHES-SMITH, INC | BSP | R | 10/26/1998 | 4th flr shaft walls - Not ready | MIKE | MIKE | | BSP | R | 1398791 |
HUGHES-SMITH, INC | BSP | P | 10/23/1998 | 3rd flr shafts - Inner layer OK | MIKE | MIKE | | BSP | P | 1398785 |
HUGHES-SMITH, INC | BFR | P | 10/15/1998 | 2nd flr frmg | MIKE | MIKE | | BFR | P | 1398777 |
HUGHES-SMITH, INC | BFR | P | 10/14/1998 | Above ceiling 1st flr public bathrms,3rd flr shaft walls interior layer | MIKE | MIKE | | BFR | P | 1398769 |
HUGHES-SMITH, INC | BFR | P | 10/13/1998 | Corridor #7 OK | MIKE | MIKE | | BFR | P | 1398754 |
HUGHES-SMITH, INC | BLA | P | 10/13/1998 | West elevation | MIKE | MIKE | | BLA | P | 1398763 |
HUGHES-SMITH, INC | BFR | P | 10/12/1998 | 2nd flr north (6) rms - sheetroc above ceiling exterior walls | MIKE | MIKE | | BFR | P | 1398747 |
HUGHES-SMITH, INC | BFR | P | 10/08/1998 | Fire safeing @ exterior wall on 2nd flr OK | MIKE | MIKE | | BFR | P | 1398741 |
HUGHES-SMITH, INC | BBB | C | 10/08/1998 | Rec'd bond beam inspection report from CTL/Thompson(19181) | MIKE | MIKE | | BBB | C | 1398726 |
HUGHES-SMITH, INC | BFN | C | 10/08/1998 | Rec'd Fdtn inspection report from CTL/Thompson(19181) | MIKE | MIKE | | BFN | C | 1398734 |
HUGHES-SMITH, INC | BFN | R | 10/07/1998 | | MIKE | MIKE | | BFN | R | 1398711 |
HUGHES-SMITH, INC | BBB | L | 10/07/1998 | | MIKE | MIKE | | BBB | L | 1398704 |
HUGHES-SMITH, INC | BFR | R | 10/07/1998 | No plans | MIKE | MIKE | | BFR | R | 1398720 |
HUGHES-SMITH, INC | BFR | P | 10/06/1998 | Reviewed 2nd flr frmg - Need to complete fire rating of all floor penetrations & recall | MIKE | MIKE | | BFR | P | 1398698 |
HUGHES-SMITH, INC | BFN | P | 10/02/1998 | Fdtn walls @ stair #5 for bridge complete | MIKE | MIKE | | BFN | P | 1398691 |
HUGHES-SMITH, INC | BFR | P | 09/23/1998 | Exterior walls 1st to 3rd - OK to insulate,Need CTL report for weld inspection & inspect firesafing @ each floor, 1st flr frmg - OK to rock,Need to inspect shafts/corridors/flr penetrations | MIKE | MIKE | | BFR | P | 1398683 |
HUGHES-SMITH, INC | BFR | R | 09/22/1998 | Not ready | MIKE | MIKE | | BFR | R | 1398675 |
HUGHES-SMITH, INC | BFN | P | 09/01/1998 | NORTH/SOUTH BRIDGE WALL OK; SUPER TO CLEAN SOME MUD OFF STEEL BEFORE 8:00 AM POUR | DANF | DANF | | BFN | P | 1398668 |
HUGHES-SMITH, INC | BBB | P | 08/21/1998 | Stair #10 parapet elevation | MIKE | MIKE | | BBB | P | 1398661 |
HUGHES-SMITH, INC | BBB | P | 08/17/1998 | GARDEN LEVEL COMPLETE | KEVINM | KEVINM | | BBB | P | 1399045 |
HUGHES-SMITH, INC | BFT | C | 08/17/1998 | HAVE CASSION LOGS | KEVINM | KEVINM | | BFT | C | 1399074 |
HUGHES-SMITH, INC | BFN | R | 08/12/1998 | NEED ENTINEER'S LETTER FOR GRADE BEAM; POURED BEFORE INSPECTOR COULD INSPECT | DANF | DANF | | BFN | R | 1398655 |
HUGHES-SMITH, INC | BBB | P | 05/26/1998 | ELEVATOR TOWER 00 AT 22' 8" OK | DANF | DANF | | BBB | P | 1398648 |
HUGHES-SMITH, INC | BBB | P | 05/18/1998 | AT 22'8" AND 38'4"; SUPER VERIFIED 22'8" NEAL CARTER | DANF | DANF | | BBB | P | 1398633 |
HUGHES-SMITH, INC | BFN | P | 05/18/1998 | SEE APPROVED PLANS PAGE S1.1; G.8 TO 4 AND RETURN OF 10'; | DANF | DANF | | BFN | P | 1398641 |
HUGHES-SMITH, INC | BBB | R | 05/14/1998 | SUPER NOT AT SITE AT 4:20 | DANF | DANF | | BBB | R | 1398625 |
HUGHES-SMITH, INC | BBB | P | 05/11/1998 | STAIRWELL # 10 AT 12' LEVEL OK | TOM | TOM | | BBB | P | 1398618 |
HUGHES-SMITH, INC | BFN | P | 04/29/1998 | WALL OK AT GRID LINE 6 AND GG-AA AND TRASH AREA; SEE SHEET S1.1 OF APPROVED PLANS | DANF | DANF | | BFN | P | 1398609 |
HUGHES-SMITH, INC | BFN | P | 04/26/1998 | NEED ENGINEERS REPORT FORM CTL THOMSON TO VERIFY STEEL AS PER DESIGN AND SPECIFIC LOCATION OF POUR | DANF | DANF | | BFN | P | 1398601 |
HUGHES-SMITH, INC | BFN | R | 04/23/1998 | SITE LOCKED AT 4:30 | DANF | DANF | | BFN | R | 1398593 |
HUGHES-SMITH, INC | BFN | P | 02/23/1998 | Grade beams on AA & BB line between 6 & 13 line,Need caisson log | MIKE | MIKE | | BFN | P | 1398586 |
HUGHES-SMITH, INC | BFN | P | 01/23/1998 | Retaining wall @ utility yard entrance | MIKE | MIKE | | BFN | P | 1398570 |
HUGHES-SMITH, INC | BFT | R | 01/23/1998 | Contractor cancelled | MIKE | MIKE | | BFT | R | 1398578 |
HUGHES-SMITH, INC | BFD | R | 01/16/1998 | Backfilled without inspection | MIKE | MIKE | | BFD | R | 1398554 |
HUGHES-SMITH, INC | BFN | P | 01/16/1998 | Retaining wall northwest corner | MIKE | MIKE | | BFN | P | 1398562 |
FERGUSON ELECTRIC CORPORATION | E= | C | 01/29/1999 | | MIKEC | MIKEC | | E= | C | 1399238 |
FERGUSON ELECTRIC CORPORATION | E= | P | 01/13/1999 | 5th floor final | MIKEC | MIKEC | | E= | P | 1399230 |
FERGUSON ELECTRIC CORPORATION | ER | P | 01/12/1999 | 5th floor ceiling | MIKEC | MIKEC | | ER | P | 1399224 |
FERGUSON ELECTRIC CORPORATION | E= | P | 01/07/1999 | final 4th floor. need panel schedules | MIKEC | MIKEC | | E= | P | 1399215 |
FERGUSON ELECTRIC CORPORATION | E= | P | 12/29/1998 | ceilings 3 & 4th floor | MIKEC | MIKEC | | E= | P | 1399207 |
FERGUSON ELECTRIC CORPORATION | ER | P | 12/24/1998 | MAY BE UNDER DIFFERENT PERMIT #. | MIKEC | MIKEC | | ER | P | 1399262 |
FERGUSON ELECTRIC CORPORATION | ER | P | 12/03/1998 | breezeway and crawler | MIKEC | MIKEC | | ER | P | 1399199 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/13/1998 | 4th floor north side | MIKEC | MIKEC | | ER | P | 1399192 |
FERGUSON ELECTRIC CORPORATION | ER | P | 11/03/1998 | SEVERAL CEILING LOCATIONS AROUND | TERRY | TERRY | | ER | P | 1399254 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/27/1998 | 3rd floor north side walls | MIKEC | MIKEC | | ER | P | 1399185 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/20/1998 | 1st. floor ceiling partial | MIKEC | MIKEC | | ER | P | 1399177 |
FERGUSON ELECTRIC CORPORATION | ER | P | 10/14/1998 | 2ND FLOOR -MOST INSPECTIONS ARE BEING DONE ON OTHER PERMIT D-12894 | RED | RED | | ER | P | 1399247 |
ACADEMY INSULATION CO | H= | C | 03/22/2005 | BNASED ON INSPECTION ON 1/14/99 | BOB | BOB | | H= | C | 1400578 |
J D STEWARD AIR CONDITIONING | H= | C | 01/14/1999 | | JOHNW | JOHNW | | H= | C | 1399162 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 01/08/1999 | gas contractor only | JOHNW | JOHNW | | H= | C | 1400532 |
J D STEWARD AIR CONDITIONING | H16 | C | 12/22/1998 | | JIMV | JIMV | | H16 | C | 1399155 |
J D STEWARD AIR CONDITIONING | HV | C | 12/21/1998 | | JIMV | JIMV | | HV | C | 1399148 |
J D STEWARD AIR CONDITIONING | HD | C | 12/21/1998 | | JIMV | JIMV | | HD | C | 1399140 |
ACADEMY INSULATION CO | HV | C | 12/21/1998 | | JIMV | JIMV | | HV | C | 1400573 |
J D STEWARD AIR CONDITIONING | HD | P | 12/18/1998 | 5TH FLOOR COMPLETED BY JW ON 10/10 - # 12894 | JIMV | JIMV | | HD | P | 1399169 |
J D STEWARD AIR CONDITIONING | HV | P | 12/09/1998 | furnace vent in bridge area ok | JOHNW | JOHNW | | HV | P | 1399131 |
J D STEWARD AIR CONDITIONING | HD | P | 12/09/1998 | duct in bridge area ok | JOHNW | JOHNW | | HD | P | 1399125 |
HOMEOWNER | H16 | C | 11/12/1998 | ELEVATED GAS PRESSURE 1.0 PSIG | KEN | KEN | | H16 | C | 1398546 |
J D STEWARD AIR CONDITIONING | HD | P | 11/02/1998 | 4th floor trunks, laterals, shafts, fire dampers OK | JIMV | JIMV | | HD | P | 1399117 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 10/29/1998 | | DAVEL | DAVEL | | HI | C | 1400508 |
ACADEMY INSULATION CO | HV | P | 10/16/1998 | fireplaces 2 thru 5 th floors | DAVEL | DAVEL | | HV | P | 1400564 |
J D STEWARD AIR CONDITIONING | HD | P | 10/13/1998 | 3rd floor trunks, laterals, shafts, fire dampers OK | JIMV | JIMV | | HD | P | 1399109 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 10/07/1998 | need fireplaces | JIMV | JIMV | | HI | P | 1399293 |
J D STEWARD AIR CONDITIONING | HD | P | 09/25/1998 | 1st & 2nd floor trunks, laterals, shafts, fire dampers OK | JIMV | JIMV | | HD | P | 1399102 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 01/15/1999 | | DAVEL | DAVEL | | P= | C | 1400541 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 01/08/1999 | 1st thru 4th floors. | MARTY | MARTY | | P= | P | 1400524 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 11/30/1998 | | DAVEL | DAVEL | | PTO | C | 1400517 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/12/1998 | 4TH FLOOR WATER PIPE | DAVEL | DAVEL | | PTO | P | 1400556 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/15/1998 | 4th and 5th floor except water pipe | DAVEL | DAVEL | | PTO | P | 1400499 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/07/1998 | 3 floors complete | JIMV | JIMV | | PTO | P | 1399302 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 09/25/1998 | 2nd floor h2o OK | JIMV | JIMV | | PTO | P | 1399286 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 09/16/1998 | DWV - floors 1,2,3 - ok / H2O - floor 1 - ok | JIMV | JIMV | | PTO | P | 1399278 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 09/02/1998 | ASSITED LIVING FLOOR S 1 THRU 4 OK | JIMV | JIMV | | PRD | P | 1400549 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 06/30/1998 | | DAVEL | DAVEL | | PB | C | 1399270 |