PIKES PEAK CONSTRUCTION COMPANY, INC. | B= | C | 07/23/1998 | | MIKE | MIKE | | B= | C | 1449707 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFR | C | 07/23/1998 | | MIKE | MIKE | | BFR | C | 1449712 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | B= | P | 07/20/1998 | PARTIAL FINAL,PROVIDE 29" MIN CLEARANCE AT RESTROOM SINK APRON,27" MIN CLEAR AT 8" SETBACK TO SINK BOTTOM,BOTH ROOMS | RICH | RICH | | B= | P | 1449701 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFR | P | 06/23/1998 | CANOPY POSTS GROUTED,NEED ELEC INSPECTION
| MIKE | MIKE | | BFR | P | 1449719 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFN | C | 06/18/1998 | | MIKE | MIKE | | BFN | C | 1449686 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFR | P | 06/18/1998 | Need elec & heat inspections,Grout canopy column bases | MIKE | MIKE | | BFR | P | 1449694 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BSP | P | 06/15/1998 | Canopy beam bolts corrected | MIKE | MIKE | | BSP | P | 1449679 |
TRADEWINDS HEATING & AIR-COND. | BSP | P | 06/12/1998 | | MIKE | MIKE | | BSP | P | 1449773 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFR | R | 06/11/1998 | Elec & heat inspection,Apprvd revised roof frm plan,Pt loading slab with new roof beam post,Roof beam brg on hollow masonry wall,2x4 brg wall >10' height,Canopy beam bolts @ SE column,Dry pack canopy column bases | MIKE | MIKE | | BFR | R | 1449671 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFN | P | 05/11/1998 | 4 canopy pads ok/.letter on file revised pads and compaction letter also/ | FRANK | FRANK | | BFN | P | 1449663 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFN | P | 05/06/1998 | WEST FND.OK/HAVE FND.LETTER FOR DOWELS ETC. | DAVE JONES | DAVE JONES | | BFN | P | 1449655 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFN | R | 05/04/1998 | Incomplete fdtn design | MIKE | MIKE | | BFN | R | 1449647 |
PIKES PEAK CONSTRUCTION COMPANY, INC. | BFT | P | 04/30/1998 | small pad inside existing structure | CLOVIS | CLOVIS | | BFT | P | 1449639 |
HERB WILSON ELECTRIC, LLC. | E= | C | 07/16/1998 | | MIKEC | MIKEC | | E= | C | 1449796 |
HERB WILSON ELECTRIC, LLC. | ER | P | 06/29/1998 | CEILING. | GLENN | GLENN | | ER | P | 1449786 |
HERB WILSON ELECTRIC, LLC. | ES | C | 06/29/1998 | 3W/OH, CT SERVICE, HERB WILSON ELECT. | GLENN | GLENN | | ES | C | 1449792 |
HERB WILSON ELECTRIC, LLC. | ER | P | 06/11/1998 | | TERRY | TERRY | | ER | P | 1449803 |
JOLLY PLUMBING & HEATING INC. | H= | C | 10/13/1999 | TO CLOSE PERMIT. | KYE | KYE | | H= | C | 1449742 |
TRADEWINDS HEATING & AIR-COND. | H= | C | 07/15/1998 | | JOHNW | JOHNW | | H= | C | 1449766 |
SOUTHWEST PLUMBING & HTG, INC | H= | C | 07/13/1998 | INSIDE GAS TEST COMPLETE 10# TEST 2 OUTLETS | JOHNW | JOHNW | | H= | C | 1449824 |
SOUTHWEST PLUMBING & HTG, INC | HI | P | 06/19/1998 | 10# TEST [2 OUTLETS]-CHANGED TO PARTIAL, HAD ANOTHER LINE
| JOHNW | JOHNW | | HI | P | 1449817 |
TRADEWINDS HEATING & AIR-COND. | HD | P | 06/15/1998 | pending revision of approved plans | JOHNW | JOHNW | | HD | P | 1449762 |
TRADEWINDS HEATING & AIR-COND. | HD | P | 06/12/1998 | PENDING REVISION OF APPROVED PLANS | JOHNW | JOHNW | | HD | P | 1449780 |
TRADEWINDS HEATING & AIR-COND. | HV | C | 06/12/1998 | | JOHNW | JOHNW | | HV | C | 1449755 |
JOLLY PLUMBING & HEATING INC. | P= | C | 07/20/1998 | | KYE | KYE | | P= | C | 1449737 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/17/1998 | Need 9-d back flow preventer for ice machine, need fire stop at ceiling above water heater | KYE | KYE | | P= | P | 1449730 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 06/11/1998 | | DAVEL | DAVEL | | PTO | C | 1449749 |
JOLLY PLUMBING & HEATING INC. | PB | C | 06/01/1998 | | DAVEL | DAVEL | | PB | C | 1449724 |