THE NEENAN COMPANY LLLP | B= | C | 03/11/1999 | COMPLT | RICH | RICH | | B= | C | 1463140 |
THE NEENAN COMPANY LLLP | B= | P | 02/09/1999 | ELECTRIC ROOM WALL PENETRATIONS,FILL LOW VOLTAGE CONDUIT AT RATED WALLS,DOOR SEALS AR REAR DISPATCH,NEW ROOM AREA 2ND FLOOR ,CHECK ABOVE CEILING AT MAIN RATED WALL | RICH | RICH | | B= | P | 1463133 |
THE NEENAN COMPANY LLLP | B= | P | 11/13/1998 | PARTIAL BUILDING FINAL,E=,H=,NOT COMPLT | RICH | RICH | | B= | P | 1463126 |
THE NEENAN COMPANY LLLP | B= | R | 11/12/1998 | E=,FILL ELECT ROOM RACE WAYS WITH RATED MATERIAL,CLOSZURES,GLASS AT DOORS,ADRESS#S,RECALL | RICH | RICH | | B= | R | 1463119 |
THE NEENAN COMPANY LLLP | BFR | C | 10/16/1998 | CHECK ELECTRICAL CONDUIT | RICH | RICH | | BFR | C | 1463112 |
THE NEENAN COMPANY LLLP | BFR | P | 10/08/1998 | PENETRATIONS AT RATED WALLS | RICH | RICH | | BFR | P | 1463104 |
THE NEENAN COMPANY LLLP | BFR | P | 10/05/1998 | FRAMER NO TON SITE RECALL | RICH | RICH | | BFR | P | 1463097 |
THE NEENAN COMPANY LLLP | BFR | P | 09/28/1998 | 2ND FLOOR,DROP CEILING TILE,AT NON RATED AREA OK | RICH | RICH | | BFR | P | 1463089 |
THE NEENAN COMPANY LLLP | BFR | P | 09/11/1998 | RESTROOM HARD LIDS BLDG C | RICH | RICH | | BFR | P | 1463081 |
THE NEENAN COMPANY LLLP | BFR | P | 08/13/1998 | 1ST FLOOR WALLS,RECALL PENETRATIONS SEAL,RATED WALLS AT STAIRWY INCPLT | RICH | RICH | | BFR | P | 1463073 |
THE NEENAN COMPANY LLLP | BFR | P | 08/06/1998 | 1. NEED ELECTRIC, PLUMBING, AND VENT INSP. 2. ROOMS OK PENDING OTHER INSP. 1ST FLOOR,551, 552, 559, 557, 555, 553, 551, 550, 568, 569, 570, 564, 520, 564, 542, 541, 545, 546, 547 A&B, 540 A&B SECOND FLOOR, 647, 648, 649, 650, 628, 629, 630, 631, 644, 643, 641, | PHIL | PHIL | | BFR | P | 1463065 |
THE NEENAN COMPANY LLLP | BSP | P | 08/03/1998 | FIREWALL ABOVE CEILING | JIMP | JIMP | | BSP | P | 1463147 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 02/03/1999 | INSP DONE EARLIER. ADMIN. ONLY. | GLENN | GLENN | | E= | C | 1463057 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/06/1998 | WALLS, AREA 9. | GLENN | GLENN | | ER | P | 1463049 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/30/1998 | BATHROOMS, KITCHEN, AND VENDING AREA. | GLENN | GLENN | | ER | P | 1463039 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ES | P | 06/01/1998 | ENERGIZE TRANSFORMER WHEN CALLED. | GLENN | GLENN | | ES | P | 1463031 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ES | C | 04/03/1998 | ENERGIZE TRANSFORMER WHEN CALLED. | GLENN | GLENN | | ES | C | 1463015 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ES | C | 04/03/1998 | FEEDERS FOR TEMP. PANEL IN BLDG. " C " | GLENN | GLENN | | ES | C | 1463024 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | EUG | P | 02/25/1998 | FROM TRANSFORMER. | GLENN | GLENN | | EUG | P | 1463006 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 01/19/1999 | test and bal report received 1/19/99 | JOHNW | JOHNW | | H= | C | 1462894 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 11/13/1998 | EVERYTHING OK EXCEPT FOR BALANCE REPORT | JOHNW | JOHNW | | H= | P | 1462886 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 10/28/1998 | Corridor link from bldg B - C /OK | JIMV | JIMV | | H= | P | 1462870 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 10/16/1998 | | JOHNW | JOHNW | | HD | C | 1462863 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 10/05/1998 | area 8 duct complete/grease duct for hood ok | JOHNW | JOHNW | | HD | P | 1462855 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/21/1998 | area 9 ok / need to find out about elevator shaft and releif duct | JOHNW | JOHNW | | H= | P | 1462833 |
HEATING & PLUMBING ENGINEERS, INC | HV | C | 09/21/1998 | | JOHNW | JOHNW | | HV | C | 1462841 |
HEATING & PLUMBING ENGINEERS, INC | HC | C | 08/25/1998 | | JOHNW | JOHNW | | HC | C | 1462827 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 08/20/1998 | 10# screwed pipe to the RTU'S | JOHNW | JOHNW | | HI | P | 1462812 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 08/12/1998 | welded line to kitchen equipment 60# | JOHNW | JOHNW | | HI | P | 1462801 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 07/09/1998 | area 8 ok to insulate ductwork / office area above ceiling rough ok fire & firesmoke dampers 75% comp/grease duct wrap in on 1st and 2nd fl | JOHNW | JOHNW | | HD | P | 1462778 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 06/22/1998 | grease duct welded 1st floor ok except for tie-in on hood inc access doors/ also above ceiling rough in office area and area 7 ok to wrap | JOHNW | JOHNW | | HD | P | 1462753 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 06/03/1998 | 1st and 2nd levels area 9 above ceiling rough ok/also grease duct on 2nd level ok | JOHNW | JOHNW | | HD | P | 1462746 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 05/08/1998 | WELDED ONLY [K.K. ANDR.R. ARE BOTH WELDERS STAMPS] | JOHNW | JOHNW | | HI | P | 1462737 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 11/06/1998 | | JOELN | JOELN | | P= | C | 1462878 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 09/29/1998 | BUILDING C- TOP OUT COMPLETE | JOELN | JOELN | | PTO | C | 1462847 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/20/1998 | Building C- Area 8 | JOELN | JOELN | | PTO | P | 1462820 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/28/1998 | Building C- Area 9 complete | JOELN | JOELN | | PTO | P | 1462794 |
HEATING & PLUMBING ENGINEERS, INC | PRD | C | 07/28/1998 | | JOELN | JOELN | | PRD | C | 1462786 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 06/26/1998 | Building C-areas 7&8 add hangers to support swing piping out to drains | JOELN | JOELN | | PRD | P | 1462762 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/26/1998 | Building C-waterpipe on second floor stubbed down to first floor | JOELN | JOELN | | PTO | P | 1462770 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 05/28/1998 | BUILDING C- ALL ABOVE GROUND ROOF DRAINS ON EAST SIDE OF BUILDING | JOELN | JOELN | | PRD | P | 1462998 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/20/1998 | Building C- plumbing base for bathroom 567 and boilerroom | JOELN | JOELN | | PB | P | 1462729 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/17/1998 | Building C- underground roofdrains-columnlines CB and 31- this completes the underground part of the roofdrains | JOELN | JOELN | | PRD | P | 1462721 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/15/1998 | NEW DRINKING FTN AT STAIRWAY AT NORTH END OF BLDG AT COL LINES 33 AND CN | PAT | PAT | | PB | P | 1462983 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/15/1998 | UNDERGROUND STORM LINES ON WEST SIDE OF BLDG/ ON COLUMNS CB THRU CL | PAT | PAT | | PB | P | 1462990 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/14/1998 | Building C- underground roof drain- one stub at column line 34 and one at 35 on north side of building | JOELN | JOELN | | PRD | P | 1462974 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/10/1998 | Building C- underground roofdrain at column line 37 | JOELN | JOELN | | PRD | P | 1462714 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/10/1998 | Building C- plumbing base for room 528 | JOELN | JOELN | | PB | P | 1462706 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 03/23/1998 | Building C- underground roof drain piping- column lines 34,35,36,37,39 | JOELN | JOELN | | PRD | P | 1462698 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 03/20/1998 | Building C- plumbing base-Baths 541 & 545, Locker rooms 542 & 546 | JOELN | JOELN | | PB | P | 1462689 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/23/1998 | Building C-plumbing base- waste line extention- 60' of 4" horizontal to bath 501 | JOELN | JOELN | | PB | P | 1462958 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 02/23/1998 | Building C-roof drain base-4-6"stubs from column lines CG-CK | JOELN | JOELN | | PRD | P | 1462966 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/17/1998 | 2 floor sinks in room #513 | KYE | KYE | | PB | P | 1462681 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/13/1998 | Building C-Kitchen grease waste to outside of building, serving rooms 552,553,554,555,556 | JOELN | JOELN | | PB | P | 1462949 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/12/1998 | Building C-sanitary waste for 4 hand sinks Rms 552,555,557,558 | JOELN | JOELN | | PB | P | 1462942 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/09/1998 | Building C-floor drain in water entry room 523, bath room 567, and stub for upstairs room 621 | JOELN | JOELN | | PB | P | 1462934 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/06/1998 | Building C-baths 509,510,511 on column lines 27.5-28 and CF-CH | JOELN | JOELN | | PB | P | 1462926 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 12/30/1997 | 6" & 4" trunk line from line 36 to 37, 4" waste to grease trap outside of building | JOELN | JOELN | | PB | P | 1462918 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 12/24/1997 | 6" trunk line from line 29.5 to 36.5 | JOELN | JOELN | | PB | P | 1462910 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 12/23/1997 | Building C-6" trunk line only with 4" risers from line CA to CL between lines 29 & 30 | JOELN | JOELN | | PB | P | 1462902 |