HUGHES-SMITH, INC | B= | C | 10/09/2000 | OK TO CLOSE PERMIT PER TERRY B (KL) | TERRYB | TERRYB | | B= | C | 1706754 | HUGHES-SMITH, INC | B= | P | 08/07/2000 | need clear electric final | TERRYB | TERRYB | | B= | P | 1706747 | HUGHES-SMITH, INC | B= | P | 07/26/2000 | smoke seal stairway doors, finish glazing, one grab bar missing in bathroom, clear fire final | TERRYB | TERRYB | | B= | P | 1706739 | HUGHES-SMITH, INC | BSP | P | 07/17/2000 | elevater shaft | TERRYB | TERRYB | | BSP | P | 1706731 | HUGHES-SMITH, INC | BFR | C | 07/12/2000 | | TERRYB | TERRYB | | BFR | C | 1706722 | HUGHES-SMITH, INC | BFR | P | 06/21/2000 | STEEL FRAME TRUSS 4th FLOOR EAST | RICK | RICK | | BFR | P | 1706714 | HUGHES-SMITH, INC | BFR | P | 06/04/2000 | steel truss framing over west stair tower, shaft in basement | TERRYB | TERRYB | | BFR | P | 1706708 | HUGHES-SMITH, INC | BFR | P | 05/23/2000 | bathroom framing third and fourth floors | TERRYB | TERRYB | | BFR | P | 1706699 | HUGHES-SMITH, INC | BFR | P | 05/09/2000 | bathrooms first second and third floors | TERRYB | TERRYB | | BFR | P | 1706692 | HUGHES-SMITH, INC | BSP | P | 05/08/2000 | shaft first floor | TERRYB | TERRYB | | BSP | P | 1706683 | HUGHES-SMITH, INC | BSP | P | 05/03/2000 | shaft fourth floor, and partial on third floor | TERRYB | TERRYB | | BSP | P | 1706675 | HUGHES-SMITH, INC | BSP | P | 04/27/2000 | shaft inspection second and third floors | TERRYB | TERRYB | | BSP | P | 1706667 | HUGHES-SMITH, INC | BFT | C | 02/22/2000 | | TERRYB | TERRYB | | BFT | C | 1706658 | HUGHES-SMITH, INC | BFN | C | 02/22/2000 | | TERRYB | TERRYB | | BFN | C | 1706646 | HUGHES-SMITH, INC | BBB | P | 01/11/2000 | first floor super will have structural engineer inspect bond beams daily and supply us with copies of his reports | TERRYB | TERRYB | | BBB | P | 1706638 | HUGHES-SMITH, INC | BFN | P | 01/04/2000 | see plans | TERRYB | TERRYB | | BFN | P | 1706630 | HUGHES-SMITH, INC | BFN | P | 12/22/1999 | see plans | TERRYB | TERRYB | | BFN | P | 1706620 | HUGHES-SMITH, INC | BFT | P | 12/17/1999 | see plans | TERRYB | TERRYB | | BFT | P | 1706608 | HUGHES-SMITH, INC | BFT | P | 12/08/1999 | FOOTER AND PADS SOUTH END SEE PADS | RICK | RICK | | BFT | P | 1706600 | HUGHES-SMITH, INC | BBB | P | 12/07/1999 | 1st BBB storage room | JOE | JOE | | BBB | P | 1706592 | HUGHES-SMITH, INC | BFD | P | 11/18/1999 | sump pit | TERRYB | TERRYB | | BFD | P | 1706584 | HUGHES-SMITH, INC | BFN | P | 11/10/1999 | see plans | TERRYB | TERRYB | | BFN | P | 1706576 | HUGHES-SMITH, INC | BFN | P | 11/01/1999 | see plans sheet S1 | TERRYB | TERRYB | | BFN | P | 1706569 | HUGHES-SMITH, INC | BFT | P | 10/15/1999 | see plan sheet S1.1 | TERRYB | TERRYB | | BFT | P | 1706561 | WISE ELECTRIC, INC. | E= | C | 09/12/2000 | | IKE | IKE | | E= | C | 1707077 | WISE ELECTRIC, INC. | ER | C | 09/12/2000 | | IKE | IKE | | ER | C | 1707085 | WISE ELECTRIC, INC. | E= | R | 09/11/2000 | transformer grounding. electric heat disconnects. bond generator neutral. | IKE | IKE | | E= | R | 1707069 | WISE ELECTRIC, INC. | E= | P | 07/26/2000 | 2 nd&3rd floor hallway, west stairwell ok. | IKE | IKE | | E= | P | 1707061 | WISE ELECTRIC, INC. | E= | R | 07/25/2000 | need lights end of hallways. | IKE | IKE | | E= | R | 1707053 | WISE ELECTRIC, INC. | ER | P | 07/21/2000 | 1st floor and basement hallways ok. | IKE | IKE | | ER | P | 1707045 | WISE ELECTRIC, INC. | ER | P | 07/14/2000 | 2nd floor cor. 3rd floor 2/3 of west cor. | IKE | IKE | | ER | P | 1707036 | WISE ELECTRIC, INC. | ER | P | 05/22/2000 | 3 rd and 4 th floor wall | IKE | IKE | | ER | P | 1707029 | WISE ELECTRIC, INC. | ER | P | 05/09/2000 | 2nd floor baths. | IKE | IKE | | ER | P | 1707020 | WISE ELECTRIC, INC. | ES | C | 04/14/2000 | 2000 amp 4/wire u/g c/t metering wise electric new service. | IKE | IKE | | ES | C | 1707012 | WISE ELECTRIC, INC. | ER | P | 03/22/2000 | basement storage, 1st floor bath and common area. | IKE | IKE | | ER | P | 1707005 | WISE ELECTRIC, INC. | EUG | P | 02/28/2000 | electric vault ok. | IKE | IKE | | EUG | P | 1706996 | WISE ELECTRIC, INC. | ER | P | 02/24/2000 | 4 th floor deck ok. | IKE | IKE | | ER | P | 1706988 | WISE ELECTRIC, INC. | ER | P | 02/08/2000 | 3 rd slab. | IKE | IKE | | ER | P | 1706980 | WISE ELECTRIC, INC. | ER | P | 01/24/2000 | 2nd floor slab | MIKEC | MIKEC | | ER | P | 1706972 | WISE ELECTRIC, INC. | EUG | P | 01/05/2000 | 1st floor electric room slab | IKE | IKE | | EUG | P | 1706964 | WISE ELECTRIC, INC. | EUG | P | 11/02/1999 | electric equipment room u/g | IKE | IKE | | EUG | P | 1706956 | WALKER HICKS PIPING, LLC | H= | C | 07/26/2000 | Gas final complete. | LYNNS | LYNNS | | H= | C | 1706926 | WALKER HICKS PIPING, LLC | HC | C | 07/26/2000 | OK to release meter. | LYNNS | LYNNS | | HC | C | 1706933 | HEATING & PLUMBING ENGINEERS, INC | H= | C | 07/21/2000 | Final complete on base and shell. | LYNNS | LYNNS | | H= | C | 1706821 | HEATING & PLUMBING ENGINEERS, INC | HD | P | 07/10/2000 | 4th floor rough-in complete. | LYNNS | LYNNS | | HD | P | 1706812 | HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/04/2000 | 1st floor mechanical shafts (2) retaining angles on F/S dampers OK. | LYNNS | LYNNS | | HD | P | 1706804 | HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/28/2000 | South/West mech. shaft- 2nd through 4th floors, OK to cover. | LYNNS | LYNNS | | HD | P | 1706795 | HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/26/2000 | Riser shaft retaining angles on f/d's OK to cover, 1st- 4th floors. | LYNNS | LYNNS | | HD | P | 1706786 | HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/14/2000 | 4th floor rough-in complete. Riser shafts, leave sheet rock off on 4th and 2nd floors to see angles on fire dampers. | LYNNS | LYNNS | | HD | P | 1706779 | WALKER HICKS PIPING, LLC | HI | C | 03/29/2000 | 60# test required by code but tested at 100# per specs. OK | LYNNS | LYNNS | | HI | C | 1706885 | HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/16/2000 | Basement, 1st, 2nd and 3rd floors partial rough. OK to insulate. | LYNNS | LYNNS | | HD | P | 1706771 | WALKER HICKS PIPING, LLC | P= | C | 07/19/2000 | | JIMV | JIMV | | P= | C | 1706916 | WALKER HICKS PIPING, LLC | PTO | C | 05/23/2000 | | JIMV | JIMV | | PTO | C | 1706909 | WALKER HICKS PIPING, LLC | PTO | P | 05/09/2000 | H2O 1st 2nd floors OK | JIMV | JIMV | | PTO | P | 1706900 | WALKER HICKS PIPING, LLC | PTO | P | 03/30/2000 | waste & vent 3rd & 4th floor thru roof | DOUGR | DOUGR | | PTO | P | 1706892 | WALKER HICKS PIPING, LLC | PRD | C | 03/28/2000 | | JIMV | JIMV | | PRD | C | 1706877 | WALKER HICKS PIPING, LLC | PTO | P | 03/14/2000 | 2nd floor up to vents ok | JIMV | JIMV | | PTO | P | 1706868 | WALKER HICKS PIPING, LLC | PRD | P | 02/29/2000 | UP TO 3RD FLOOR ON S. STACK, 2ND FLOOR ON MID STACK | JIMV | JIMV | | PRD | P | 1706949 | WALKER HICKS PIPING, LLC | PTO | P | 02/25/2000 | 1st floor core restroom & basement sump vents ok | JIMV | JIMV | | PTO | P | 1706861 | WALKER HICKS PIPING, LLC | PB | C | 02/25/2000 | | JIMV | JIMV | | PB | C | 1706853 | WALKER HICKS PIPING, LLC | PRD | P | 01/05/2000 | 6" underground stub to basement | JIMV | JIMV | | PRD | P | 1706845 | WALKER HICKS PIPING, LLC | PB | P | 12/15/1999 | 6" domestic stub | JIMV | JIMV | | PB | P | 1706837 | WALKER HICKS PIPING, LLC | PB | P | 11/23/1999 | | DARYL | DARYL | | PB | P | 1706941 | WALKER HICKS PIPING, LLC | PB | R | 11/18/1999 | No appproved plans. | DARYL | DARYL | | PB | R | 1706829 | HUGHES-SMITH, INC | V= | P | 04/14/2000 | CONSULTATION RE: SPRINKLER LINE IN HOISTWAY--NEED TO RELOCATE | TOM | TOM | | V= | P | 1706762 |
|
|