DPR CONSTRUCTION, INC. | B= | C | 08/08/2001 | | BEN | BEN | | B= | C | 1822508 |
DPR CONSTRUCTION, INC. | BFN | C | 02/19/2001 | SEE IMAGES FOR ENG REPORT | DAVEL | DAVEL | | BFN | C | 1822492 |
DPR CONSTRUCTION, INC. | BFT | C | 02/19/2001 | SEE IMAGES FOR ENG REPORT
| DAVEL | DAVEL | | BFT | C | 1822500 |
DPR CONSTRUCTION, INC. | B16 | P | 06/07/2000 | SEE IMAGES FOR SPECIAL INSP REPORTS | DAVEL | DAVEL | | B16 | P | 1822485 |
COLLIER ELECTRICAL SERVICES | E16 | C | 11/27/2001 | JOB COMPLETED BY GREEN ELECTRIC | DAVEL | DAVEL | | E16 | C | 1822558 |
BUFFALO GAP INSTRUMENTATION | E= | C | 08/21/2001 | FINAL OK. GREEN ELECTRIC COMPLETING PUNCH LIST ITEMS. | GEORGE | GEORGE | | E= | C | 1822600 |
BUFFALO GAP INSTRUMENTATION | ER | P | 08/01/2001 | AM INSPECTION VISIT W/PAUL(DPR),SCOTT(DPR),AND KEN (INTEL).NUMBER OF ITEMS REQUIRING CORRECTIVE ACTION. FENCE GROUNDING NOT ACCEPTABLE, LARGE NUMBER OF SEAL TITE CONNECTORS NOT PROPERLY TIGHTENED, SUPPORT A NUMBER OF CONDUITS. MOST GROUNDING BUSHINGS ON CONDUIT ENDS NOT TERMINATED PROPERLY. SOME CONDULETS REQUIRE PLUGS IN UNUSED OPENINGS. SOME CONDUIT NEEDS TO BE TERMINATED. PAUL INDICATED THAT DPR WILL PROBABLY USE ON SITE CONTRACTOR TO MAKE CORRECTIONS. DPR WILL ADVISE. | GEORGE | GEORGE | | ER | P | 1822592 |
BUFFALO GAP INSTRUMENTATION | ER | P | 11/17/2000 | INCOMING 12.48 STEP DOWN TO 4160/480/120V | PETEB | PETEB | | ER | P | 1822584 |
BUFFALO GAP INSTRUMENTATION | ER | P | 11/09/2000 | INCOMING 12.48KV STEP DOWN TRANSFORMER TO 480V | PETEB | PETEB | | ER | P | 1822576 |
BUFFALO GAP INSTRUMENTATION | ER | P | 11/03/2000 | INCOMING 12.48KV STEP DOWN TO 280V TRANSFORMER | PETEB | PETEB | | ER | P | 1822569 |
COLLIER ELECTRICAL SERVICES | E= | P | 10/12/2000 | WILL NEED TO SEE SEAL OFF'S POURED, FINAL OK EXCEPT THEY HAVE TO POUR THE SEAL OFFS AND REDO THE 2" SEAL OFF AT THE RECEPTACLE IN THE FRON OF THE H2 TANK | TERRY | TERRY | | E= | P | 1822550 |
COLLIER ELECTRICAL SERVICES | E= | P | 10/03/2000 | WILL HAVE TO SEE THE SEAL OFFS POURED, CRYO YARD FOR WORK DONE BY THIS CONTRACTOR, OTHER WORK DONE BY AN ADDITIONAL CONTRACTOR AND WILL BE INSPECTED UNDER HIS ID NUMBER | PETEB | PETEB | | E= | P | 1822528 |
COLLIER ELECTRICAL SERVICES | ER | P | 10/03/2000 | INCOMING 480V POWER SUPPLY | PETEB | PETEB | | ER | P | 1822535 |
COLLIER ELECTRICAL SERVICES | ER | P | 10/03/2000 | PANEL 480V PN-1, NITROGEN PURIFIER | PETEB | PETEB | | ER | P | 1822543 |
COLLIER ELECTRICAL SERVICES | ER | P | 10/02/2000 | CRYO YARD DISTRIBUTION | PETEB | PETEB | | ER | P | 1822520 |
COLLIER ELECTRICAL SERVICES | ER | P | 09/21/2000 | 480V POWER DISTRIBUTION FOR PURIFIER BLDG | PETEB | PETEB | | ER | P | 1822514 |