DPR CONSTRUCTION, INC. | B= | C | 10/31/2001 | | BEN | BEN | | B= | C | 1900439 |
DPR CONSTRUCTION, INC. | BFR | C | 10/31/2001 | | BEN | BEN | | BFR | C | 1900447 |
DPR CONSTRUCTION, INC. | B= | P | 10/26/2001 | OK EXCEPT FOR PENETRATION BELOW FLOOR IN ROOM GG2253 INSIDE DOOR GG22654 NOT SEALED. | BEN | BEN | | B= | P | 1900431 |
DPR CONSTRUCTION, INC. | BSP | P | 09/14/2001 | FIRESTOPPING ABOVE CEILING OK. GAVE PERMITTION TO INSTALL CEILING IN ALL AREAS. | BEN | BEN | | BSP | P | 1900423 |
DPR CONSTRUCTION, INC. | BSP | P | 07/31/2001 | 1ST FLOOR - FIRE STOPPING IN DUMBWAITER ROOM OK | BEN | BEN | | BSP | P | 1900415 |
DPR CONSTRUCTION, INC. | BFR | R | 07/26/2001 | 1ST FLOOR - FIRE STOPPING IN DUMBWAITER ROOM - 4 OPENINGS NOT FIRE STOPPED. | BEN | BEN | | BFR | R | 1900407 |
DPR CONSTRUCTION, INC. | BFR | R | 06/12/2001 | 1ST FLOOR - FIRE STOPPING ABOVE CEILING AT HALLWAY 282. NOT READY, MANY OPENINGS NOT FILLED. | BEN | BEN | | BFR | R | 1900399 |
DPR CONSTRUCTION, INC. | BFR | P | 05/30/2001 | DUMBWAITER ON BASEMENT AND 1ST FLOORS | BEN | BEN | | BFR | P | 1900391 |
DPR CONSTRUCTION, INC. | BSP | R | 01/02/2001 | FLOOR INFILL ON NORTH SIDE. WORK OK BUT CALLED IN USING THE WRONG PERMIT NUMBER. WILL CALL IN CORRECTLY. | BEN | BEN | | BSP | R | 1900386 |
DPR CONSTRUCTION, INC. | BFR | P | 09/21/2000 | BASEMENT LEVEL - ELECTRICAL ROOM ON THE WEST SIDE | BEN | BEN | | BFR | P | 1900379 |
DPR CONSTRUCTION, INC. | BFR | P | 09/18/2000 | WALL FRAMING ON BASEMENT LEVEL FOR ROOMS 121, 131, 133, 135, 141, 151 AND 155 | BEN | BEN | | BFR | P | 1900372 |
DPR CONSTRUCTION, INC. | BFR | P | 09/13/2000 | FRAME INSPECTION WALLS IN WET LAB AREA (LOWERED FLOOR AREA) AND PERIMETER WALLS OF LAB AREA AND ELECTRICAL ROOM ON THE SOUTH SIDE | BEN | BEN | | BFR | P | 1900364 |
LUDVIK ELECTRIC CO. | E= | C | 12/20/2001 | PUNCH LIST ITEMS COMPLETE. | GEORGE | GEORGE | | E= | C | 1900356 |
LUDVIK ELECTRIC CO. | ER | P | 12/19/2001 | VERIFY PUNCH LIST CORRECTIONS. | GEORGE | GEORGE | | ER | P | 1900348 |
LUDVIK ELECTRIC CO. | ER | P | 12/04/2001 | BASEMENT; TRANSFORMER RELOCATION AND REVISION TO PRIM / SEC IN BASEMENT. | GEORGE | GEORGE | | ER | P | 1900340 |
LUDVIK ELECTRIC CO. | ER | P | 11/27/2001 | B'SMT. ELECTRIC ROOM. REPLACE EXISTING TRANSFORMER. PUNCH LIST.. | GEORGE | GEORGE | | ER | P | 1900332 |
LUDVIK ELECTRIC CO. | ER | P | 11/15/2001 | GG 2; SORT,BSM'T, AND 1ST FLOOR PUNCH LIST. | GEORGE | GEORGE | | ER | P | 1900324 |
LUDVIK ELECTRIC CO. | ER | P | 11/07/2001 | GG 2, BSM'T PUNCH LIST ITEMS. | GEORGE | GEORGE | | ER | P | 1900317 |
LUDVIK ELECTRIC CO. | ER | P | 10/19/2001 | MEETING AT BLDG DEPT WITH DPR TO DISCUSS FINALS ON OUTSTANDING PERMITS AND ADD FEES FOR SOME EXISTING PERMITS. CHANGING SCOPE OF WORK DESCRIPTION ON SOME PERMITS. INSPECTION CONCERNS AND RESPONSES TO OUTSTANDING ISSUES. | GEORGE | GEORGE | | ER | P | 1900310 |
LUDVIK ELECTRIC CO. | ER | P | 10/18/2001 | MEETING WITH CONTRACTOR AND TERRY RE: ADDITIONAL SCOPE OF WORK AND FEES. CONTINUED WALK THROUGH OF GG2 WITH LUDVK ( SAM ) AND JOHN KENNEDY ( INTEL ). NUMBER OF ITEMS TO BE CORRECTED. | GEORGE | GEORGE | | ER | P | 1900302 |
LUDVIK ELECTRIC CO. | ER | P | 10/17/2001 | PRE TCO WALK THROUGH WITH SAM (LUDVIK) AND TERRY (INTEL) IN BASEMENT AND ON 1ST FLOOR. PUNCH LIST DEVELOPED. | GEORGE | GEORGE | | ER | P | 1900294 |
LUDVIK ELECTRIC CO. | ER | P | 06/27/2001 | GG 2, SORT; ROUGH CEILING IN LOCKER ROOM AND EAST SNORKEL. | GEORGE | GEORGE | | ER | P | 1900287 |
LUDVIK ELECTRIC CO. | ER | P | 06/14/2001 | GG2 - SORT;NGZ-2R070-1MO6, NGZ-2R022-1MO3, NGZ-2R025-1M04, NGZ-2R024-1M07, NGZ-2R028-1H09,NGZ-2R071-1M08, NGZ-2R023-1M05, NGZ-2R026-1M06, NGZ-2R073-1M05,NGZ-2R069-1M04,NGZ-2R062, NGZ-2R015-1M02,NGZ-2R072-1M03,EGZ-4D002-0F09,EGZ-4D003-0E09, EGZ-4D001-0E09. & EG2-4T002. | GEORGE | GEORGE | | ER | P | 1900270 |
LUDVIK ELECTRIC CO. | ER | P | 06/14/2001 | GG2, SORT; REMAINDER OF CEILING ( K6 TO EAST END ) INSPECTION. | GEORGE | GEORGE | | ER | P | 1900279 |
LUDVIK ELECTRIC CO. | ER | P | 06/13/2001 | GG 2, J1 - K6 CEILING INSPECTION IN SORT. | GEORGE | GEORGE | | ER | P | 1900262 |
LUDVIK ELECTRIC CO. | ER | P | 06/12/2001 | GG-2, SORT; MAU-Z-OLO3, CHW-PUMP-P4-OK03, CHW-PUMP-P3-OL03, CHW-PUMP-PZ-OK03, CHW-PUMP-P1-OK03, NGZ-CRP-1-OM0Z. | GEORGE | GEORGE | | ER | P | 1900255 |
LUDVIK ELECTRIC CO. | ER | P | 06/07/2001 | GG2, AREA 3 & 4, RAISED FLOOR GROUNDING IN WET LAB..ALL PUMPS, FANS, AND ASSOC EQUIPMENT IN BASEMENT ( SORT ). | GEORGE | GEORGE | | ER | P | 1900237 |
LUDVIK ELECTRIC CO. | ER | P | 06/07/2001 | SORT-NGZ-2D020-0K09,NGZ-2D019-OK09,NGZ-2D018-OK09,NGZ-2R029-1H05,NGZ-2R075-1S08,NGZ-2R076-1H03,4D006-OK09,RAH-3-1J04,RAH-2-1J04,RAH-1-1J03,RAH-4-1J06,NGZ-2D021-OK09,RAH-5-1J08,RAH-6-1J09,RAH-7-1M08,RAH-8-1M07,RAH-9-1M06,RAH-10-1M06,RAH-11-1M05,RAH-12-1M02,RAH-13-1M02,RAH-14-1K02. | GEORGE | GEORGE | | ER | P | 1900247 |
LUDVIK ELECTRIC CO. | ER | P | 05/30/2001 | NG2-US014A-OF02, NGF-2R212-1103, NGF-4D222-1Q07, EGF-4L203-1P07, NGF-4D224-1Q07, NGF-2R214-1C03, FLOOR BOXES, SORT GROUNDING, DIST PANELS | PETEB | PETEB | | ER | P | 1900228 |
LUDVIK ELECTRIC CO. | ER | P | 05/29/2001 | 2ND FLOOR TRANSFORMER | PETEB | PETEB | | ER | P | 1900213 |
LUDVIK ELECTRIC CO. | ER | P | 05/29/2001 | NG2-US014B-OF02, NG2-2T028-OK09, NG2-2T029-OK09, NG2-2T030-OK09, NG2-2T031-OK09, | PETEB | PETEB | | ER | P | 1900221 |
LUDVIK ELECTRIC CO. | ER | P | 05/25/2001 | NG2-2D008-0K01, NG2-2D007-OK01, NG2-2D009-OK01, NG2-2D018-OK01, 4D007-OK01, NG2-2T007-OK01, NG2-2T009-OK01, NG2-2T10-OK01, PANELS & T.F. IN SORT, NG2-2T008-OK01, | PETEB | PETEB | | ER | P | 1900205 |
LUDVIK ELECTRIC CO. | ER | P | 05/07/2001 | HALLWAYS, GG2281, GG2282, GG2284, CEILING INSPECTIONS, UNDER FLOOR GRID L-4, HALLWAY GG2285, GG2288, DIST PANEL, ROUGH CEILING IN SORT, ROUGH HALLWAY GG25+218, ROUGH FOR FLOOR BOXES, RAISED FLOOR GROUNDING, SORT GROUNDING, ROUGH FOR PUMPS & EQUIPMENTROUGH FOR PANELS AND TRANSFORMERS, | PETEB | PETEB | | ER | P | 1900197 |
LUDVIK ELECTRIC CO. | ER | P | 03/21/2001 | GG 2; SORT - WALLS ( ROUGH ). | PETEB | PETEB | | ER | P | 1900190 |
LUDVIK ELECTRIC CO. | ER | P | 03/20/2001 | GG - 2; SORT - WALLS ( ROUGH ). | PETEB | PETEB | | ER | P | 1900184 |
LUDVIK ELECTRIC CO. | ER | P | 03/16/2001 | GG 2; GFA-LAB, GG - 2250, 1ST FLOOR.GFA LAB. | PETEB | PETEB | | ER | P | 1900177 |
LUDVIK ELECTRIC CO. | ER | P | 03/14/2001 | GG - 2; SORT CEILING, SORT FLOOR. | PETEB | PETEB | | ER | P | 1900169 |
LUDVIK ELECTRIC CO. | ER | P | 03/13/2001 | GG - 2; SORT FLOOR. | PETEB | PETEB | | ER | P | 1900161 |
LUDVIK ELECTRIC CO. | ER | P | 03/09/2001 | GG - 2; SORT WALLS. | PETEB | PETEB | | ER | P | 1900153 |
LUDVIK ELECTRIC CO. | ER | P | 03/08/2001 | GG 2, AREA 3 AND 4; HALLWAY GG2285 - GG2288. | PETEB | PETEB | | ER | P | 1900146 |
LUDVIK ELECTRIC CO. | ER | P | 03/06/2001 | GG2,DRY LABS - BASEMENT AND WORK STATION QUADS - PANEL 14, PANEL 89. CAL LAB, GG2251 - 1ST FLOOR 1B/08. VFT LAB GG2256 1ST FLOOR 1C/05.VFT LAB GG 2256 1ST FLOOR 1C/05 - PANEL 12 | PETEB | PETEB | | ER | P | 1900139 |
LUDVIK ELECTRIC CO. | ER | P | 03/02/2001 | GG - 2; SORT CEILING. | PETEB | PETEB | | ER | P | 1900131 |
LUDVIK ELECTRIC CO. | ER | P | 02/27/2001 | GG-2, 1ST FLOOR SOUTH; HALLWAYS GG2281, GG2282, & GG2284 CEILINGS. | PETEB | PETEB | | ER | P | 1900122 |
LUDVIK ELECTRIC CO. | ER | P | 02/05/2001 | SORT AREA - WALL. | PETEB | PETEB | | ER | P | 1900115 |
LUDVIK ELECTRIC CO. | ER | P | 02/03/2001 | SORT AREA - WALL. | PETEB | PETEB | | ER | P | 1900107 |
LUDVIK ELECTRIC CO. | ER | P | 02/02/2001 | SORT AREA - WALL. | PETEB | PETEB | | ER | P | 1900099 |
LUDVIK ELECTRIC CO. | ER | P | 01/31/2001 | CAL LAB, GG-2251, PNL - 55; CKTS 1, 3, & 5 | PETEB | PETEB | | ER | P | 1900082 |
LUDVIK ELECTRIC CO. | ER | P | 01/31/2001 | SORT AREA - WALL. | PETEB | PETEB | | ER | P | 1900090 |
LUDVIK ELECTRIC CO. | ER | P | 01/30/2001 | GG-2,GG2251 CAL LAB RECEPTS,7, 8, 9, PANEL - 57, CKT 19, 21 & 23. | PETEB | PETEB | | ER | P | 1900074 |
LUDVIK ELECTRIC CO. | ER | P | 01/29/2001 | SORT AREA - WALL. | PETEB | PETEB | | ER | P | 1900066 |
LUDVIK ELECTRIC CO. | ER | P | 01/26/2001 | GG-2251, PNL - 11, CKT'S 19, 21, 23, 25, 27, AND 29. | PETEB | PETEB | | ER | P | 1900058 |
LUDVIK ELECTRIC CO. | ER | P | 01/19/2001 | CHASE BETWEEN GFAA LAB & WET ETCH LAB, GG-2250 GFAA LAB, GG-2250, GTA-01 CHILLER, GFA-01, CAL LAB CUBICAL | PETEB | PETEB | | ER | P | 1900050 |
LUDVIK ELECTRIC CO. | ER | P | 12/04/2000 | CWS01, CWS02 | PETEB | PETEB | | ER | P | 1900043 |
LUDVIK ELECTRIC CO. | ER | P | 11/08/2000 | HALLWAY GG285 FOR LIGHTS AND RECEPTACLES | PETEB | PETEB | | ER | P | 1900026 |
LUDVIK ELECTRIC CO. | ER | P | 11/08/2000 | PANEL AND TRANSFORMER 1-D, 9-D | PETEB | PETEB | | ER | P | 1900034 |
LUDVIK ELECTRIC CO. | ER | P | 10/30/2000 | CEILING ROUGH 1ST FLOOR LABS C5-C7 B5-B7 | PETEB | PETEB | | ER | P | 1900019 |
LUDVIK ELECTRIC CO. | ER | P | 10/24/2000 | PANEL NG-2 2R014-0001, C-5-01 D-I | PETEB | PETEB | | ER | P | 1900011 |
LUDVIK ELECTRIC CO. | E= | P | 10/24/2000 | C3-C6 AND HALLWAY, E3-E6 | PETEB | PETEB | | E= | P | 1900003 |
LUDVIK ELECTRIC CO. | ER | P | 10/01/2000 | WALLS D4-D6, E4-E6 BASMENT LAB | PETEB | PETEB | | ER | P | 1899987 |
LUDVIK ELECTRIC CO. | ER | P | 10/01/2000 | XFORMER PANEL ROOM BASMENTH4-H3 ROOM CG2 11B | PETEB | PETEB | | ER | P | 1899995 |
LUDVIK ELECTRIC CO. | E= | P | 09/29/2000 | 15B LINE 8 TO 08.8 H - J, GEAR ROOM ROOM 2114 | PETEB | PETEB | | E= | P | 1899979 |
LUDVIK ELECTRIC CO. | ER | P | 09/26/2000 | WALL ROUGH LAB BASEMENT D3-E5 GG2161 | PETEB | PETEB | | ER | P | 1899963 |
LUDVIK ELECTRIC CO. | ER | P | 09/26/2000 | WET ETCH LAB | PETEB | PETEB | | ER | P | 1899971 |
LUDVIK ELECTRIC CO. | ER | P | 09/25/2000 | WALLS E6 TO E8, C6 TO C8 | PETEB | PETEB | | ER | P | 1899956 |
LUDVIK ELECTRIC CO. | ER | P | 09/19/2000 | CEILING WET ETCH A1 - B8, B - B8 | PETEB | PETEB | | ER | P | 1899948 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | 1ST FLOOR C5-E 4-9, PANELS CC5 SECRETARY AND COMPUTER ROOMS | PETEB | PETEB | | ER | P | 1899890 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | A1-A5 C1-C5 1ST FLOOR LAB | PETEB | PETEB | | ER | P | 1899897 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | A9--A5 A5-C5 1ST FLOOR LAB | PETEB | PETEB | | ER | P | 1899904 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | WALL ROUGH A9 - A5 A5 - C5 1ST FLOOR, | PETEB | PETEB | | ER | P | 1899912 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | WALL ROUGH C2-C3 1ST FLOOR LAB E2-E3, GG2245 GG2246 | PETEB | PETEB | | ER | P | 1899919 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | WALL ROUGH QST FLOOR LAB, C2-C3 E2-E3 GG2445, GG2446 | PETEB | PETEB | | ER | P | 1899927 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | WALL ROUGH, A1-A5 C1-C5 1ST FLOOR LAB | PETEB | PETEB | | ER | P | 1899934 |
LUDVIK ELECTRIC CO. | ER | P | 09/12/2000 | WALLS A1-A5, C1-C5 | PETEB | PETEB | | ER | P | 1899942 |
LUDVIK ELECTRIC CO. | ER | P | 09/06/2000 | CEILING 1ST FLOOR CORRIDOR GG2282, GG2281, GG2283, GG2284 | PETEB | PETEB | | ER | P | 1899875 |
LUDVIK ELECTRIC CO. | ER | P | 09/06/2000 | GG2277, GG2270, GG278, GG279, GG250, GG2257, GG2251, GG2256, GG2255. GG2254, GG2258, B2-C2, B88, C88 | PETEB | PETEB | | ER | P | 1899883 |
LUDVIK ELECTRIC CO. | ER | P | 09/05/2000 | BASEMENT LAB, C2-C6 E2-E6 | PETEB | PETEB | | ER | P | 1899832 |
LUDVIK ELECTRIC CO. | ER | P | 09/05/2000 | CEILING C2-C6 E2-E6 | PETEB | PETEB | | ER | P | 1899840 |
LUDVIK ELECTRIC CO. | ER | P | 09/05/2000 | CEILING INSPECTION C2-C6 E2-E6 | PETEB | PETEB | | ER | P | 1899848 |
LUDVIK ELECTRIC CO. | ER | P | 09/05/2000 | ROUGH NG2-2D016, NG2-2T026, NG2-2R051 | PETEB | PETEB | | ER | P | 1899856 |
LUDVIK ELECTRIC CO. | ER | P | 09/05/2000 | ROUGH TRNASFORMER PANEL NG2-2R052, NG2-2D006, NG2-2T006 | PETEB | PETEB | | ER | P | 1899862 |
LUDVIK ELECTRIC CO. | ER | P | 09/05/2000 | U514A, U514B | PETEB | PETEB | | ER | P | 1899868 |
LUDVIK ELECTRIC CO. | ER | P | 09/01/2000 | D3-E5 FIB GG2162, LAB BASEMENT | PETEB | PETEB | | ER | P | 1899816 |
LUDVIK ELECTRIC CO. | ER | P | 09/01/2000 | LAB BASEMENT D3-E5 GG2162 | PETEB | PETEB | | ER | P | 1899825 |
LUDVIK ELECTRIC CO. | ER | P | 08/24/2000 | C TO C-5 -D LINE 3-6 | PETEB | PETEB | | ER | P | 1899809 |
LUDVIK ELECTRIC CO. | ER | P | 08/23/2000 | K LINE 9-5 OUTSIDE T2 TRANSFORMER | PETEB | PETEB | | ER | P | 1899802 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | 75 KVA TRANSFORMER E-H LINE #2 BASEMENT | PETEB | PETEB | | ER | P | 1899733 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | 75KVA TRANSFORMERS E-H LINE #2 | PETEB | PETEB | | ER | P | 1899741 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | CEILING ROUGH C C5-D LINE 3-6 | PETEB | PETEB | | ER | P | 1899749 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | CELING ROUGH D-3 - E5 GG2162 | PETEB | PETEB | | ER | P | 1899757 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | D-3 TO E-5 CEILING ROUGH, LAB BASEMENT | PETEB | PETEB | | ER | P | 1899765 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | D3-E5 GG2 HOL ROOM, CEILING ROUGH | PETEB | PETEB | | ER | P | 1899776 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | PANELS 1ST FLOOR C5-E 4-9 | PETEB | PETEB | | ER | P | 1899786 |
LUDVIK ELECTRIC CO. | ER | P | 08/14/2000 | ROUGH CEILING LAB BASEMENT D3-E5 SIMS | PETEB | PETEB | | ER | P | 1899794 |
LUDVIK ELECTRIC CO. | ER | P | 08/11/2000 | WALLS C2-E2, ROOM CG2151, CG2160 | PETEB | PETEB | | ER | P | 1899725 |
LUDVIK ELECTRIC CO. | ER | P | 08/09/2000 | WALL C3-C6, D3-D6 | PETEB | PETEB | | ER | P | 1899717 |
LUDVIK ELECTRIC CO. | ER | P | 08/03/2000 | CCR SECURITY ROOM, COMPUTER ROOM C5-E 4-9 | PETEB | PETEB | | ER | P | 1899709 |
LUDVIK ELECTRIC CO. | ER | P | 08/02/2000 | E-H BASEMENT TRANSFORMER ROOM AREA | PETEB | PETEB | | ER | P | 1899702 |
LUDVIK ELECTRIC CO. | ER | P | 08/01/2000 | WALL ROUGH D-3 - E-5 | PETEB | PETEB | | ER | P | 1899696 |
SOUTHLAND INDUSTRIES | H= | C | 12/05/2001 | RED'D BALANCE & SOS REPORTS OK OF CO PER BOB CROFT | JAN | JAN | | H= | C | 1900528 |
SOUTHLAND INDUSTRIES | HD | C | 10/11/2001 | | JOHNW | JOHNW | | HD | C | 1900512 |
SOUTHLAND INDUSTRIES | H= | P | 10/11/2001 | balance report required | JOHNW | JOHNW | | H= | P | 1900504 |
SOUTHLAND INDUSTRIES | HD | P | 01/01/2001 | 2 AIR HANDLERS IN BASEMENT / | JOHNW | JOHNW | | HD | P | 1900520 |
SOUTHLAND INDUSTRIES | HD | P | 10/27/2000 | 1st floor exhaust duct stainless and spiral to scrubber ok for firemaster [received cut sheet from insulater showing 1 layer firemaster for a 2 hr rating ] | JOHNW | JOHNW | | HD | P | 1900491 |
SOUTHLAND INDUSTRIES | HD | T | 09/26/2000 | PAID (REC#385802)Sheet rocked walls before we could inspect king studs at F/S damper penetrations. | LYNNS | LYNNS | | HD | T | 1900484 |
SOUTHLAND INDUSTRIES | HD | P | 09/15/2000 | probe lab . Q&R lab . F&A lab fab 5 lab | JOHNW | JOHNW | | HD | P | 1900463 |
SOUTHLAND INDUSTRIES | HD | P | 09/13/2000 | Wet etch and Cal Lab areas, supply and exhaust duct on 1st floor. | LYNNS | LYNNS | | HD | P | 1900455 |
SOUTHLAND INDUSTRIES | P= | C | 07/03/2001 | | JIMV | JIMV | | P= | C | 1900497 |
SOUTHLAND INDUSTRIES | PB | P | 09/19/2000 | floor sink for MUA unit, ok | JIMV | JIMV | | PB | P | 1900477 |
SOUTHLAND INDUSTRIES | PB | R | 09/18/2000 | need 2" vent | JIMV | JIMV | | PB | R | 1900470 |