NATIONAL DEVELOPMENT SERVICES | B= | C | 03/08/2001 | Frame complete - letter for roof purlin lap screws from colorado engineer #30079 with inspector. | LEEG | LEEG | | B= | C | 1904731 |
NATIONAL DEVELOPMENT SERVICES | B= | R | 03/07/2001 | Purlin lap screws at roof steps not per revised detail. | LEEG | LEEG | | B= | R | 1904723 |
NATIONAL DEVELOPMENT SERVICES | B= | P | 03/02/2001 | Apartment okay. Storage building frame inspection / Frame requires letter from engineer to approve purlin splice attachment change from 6 screws as specified to that installed. | LEEG | LEEG | | B= | P | 1904715 |
NATIONAL DEVELOPMENT SERVICES | BSP | P | 02/15/2001 | Fire caulk all penetrations in apartment garage fire walls / Complete trim on door between garage and apartment. | LEEG | LEEG | | BSP | P | 1904707 |
NATIONAL DEVELOPMENT SERVICES | BFR | P | 01/23/2001 | Six screws at purlin laps. | LEEG | LEEG | | BFR | P | 1904699 |
NATIONAL DEVELOPMENT SERVICES | BLA | C | 01/05/2001 | | LEEG | LEEG | | BLA | C | 1904692 |
NATIONAL DEVELOPMENT SERVICES | BLA | P | 01/04/2001 | Complete J-mouldings, Complete weep screed, Repair lath where not lapped, Attach lath 6" o.c. north wall above apartment window. | LEEG | LEEG | | BLA | P | 1904684 |
NATIONAL DEVELOPMENT SERVICES | BSP | P | 12/19/2000 | Building D Two hour firewall between apartment garage and storage okay. | LEEG | LEEG | | BSP | P | 1904677 |
NATIONAL DEVELOPMENT SERVICES | BFR | P | 12/15/2000 | Apartment frame corrections previouse fire wall items and revised engineering floor truss FO3 for correct plate size. | LEEG | LEEG | | BFR | P | 1904670 |
NATIONAL DEVELOPMENT SERVICES | BFR | R | 12/14/2000 | Strap plumbing penetrations in bearing walls, Engineering for floor truss plates, Stud under girder truss, Fire wall repair and penetrations from earlier inspections. | LEEG | LEEG | | BFR | R | 1904662 |
NATIONAL DEVELOPMENT SERVICES | BFR | R | 12/13/2000 | Truss plates wrong FL02, Strap plate breaks less than 4 feet, Firestop ceiling drop, Truss repair FL03, Nail girder truss plies per engineering, Clip all trusses, Double clip H02, TBE4 on T01G, Stud under truss end master bedrm door, FHA strap plumbing holes top plates, Anchor porch rafters top and bottom, Garage rafter extension legs to top wall, Support landing. Previous fire wall items. | LEEG | LEEG | | BFR | R | 1904654 |
NATIONAL DEVELOPMENT SERVICES | BFR | P | 12/07/2000 | Exterior faces of one hour walls okay. | LEEG | LEEG | | BFR | P | 1904646 |
NATIONAL DEVELOPMENT SERVICES | BSP | P | 12/01/2000 | Storage room side two (2) hour wall only okay. Inside One (1) hour walls of storage Okay. | LEEG | LEEG | | BSP | P | 1904640 |
NATIONAL DEVELOPMENT SERVICES | BSP | P | 11/30/2000 | Patch double layer rock north wall between truss chords top and bottom. | LEEG | LEEG | | BSP | P | 1904632 |
NATIONAL DEVELOPMENT SERVICES | BSP | P | 11/22/2000 | North inside wall east half okay one hour wall, 2 Hour wall inside garage okay first layer to garage ceiling. | LEEG | LEEG | | BSP | P | 1904624 |
NATIONAL DEVELOPMENT SERVICES | BFR | P | 11/21/2000 | Partial - Fire wall framing okay to rock then re-inspect. | LEEG | LEEG | | BFR | P | 1904618 |
NATIONAL DEVELOPMENT SERVICES | BBB | C | 11/15/2000 | | LEEG | LEEG | | BBB | C | 1904610 |
NATIONAL DEVELOPMENT SERVICES | BBB | P | 11/02/2000 | | LEEG | LEEG | | BBB | P | 1904594 |
NATIONAL DEVELOPMENT SERVICES | BSP | P | 11/02/2000 | Porch piers okay to pour. | LEEG | LEEG | | BSP | P | 1904602 |
NATIONAL DEVELOPMENT SERVICES | BBB | P | 10/30/2000 | Concrete block nine courses high with rebar tied- okay to place concrete grout. | LEEG | LEEG | | BBB | P | 1904587 |
NATIONAL DEVELOPMENT SERVICES | BFT | P | 10/19/2000 | Apartment section only. | LEEG | LEEG | | BFT | P | 1904579 |
NATIONAL DEVELOPMENT SERVICES | BFT | P | 10/18/2000 | | LEEG | LEEG | | BFT | P | 1904572 |
NATIONAL DEVELOPMENT SERVICES | BSP | T | 10/18/2000 | PAID (REC#385705)ADDITIONAL PLAN REVIEW TIME: $30.000 From: RUSSELL | RUSSELL | RUSSELL | | BSP | T | 1904738 |
NATIONAL DEVELOPMENT SERVICES | BFT | P | 10/17/2000 | See approved plans for area inspected this date. | LEEG | LEEG | | BFT | P | 1904563 |
NATIONAL DEVELOPMENT SERVICES | BFT | T | 10/16/2000 | PAID (REC#385322)Not ready. | LEEG | LEEG | | BFT | T | 1904555 |
NATIONAL DEVELOPMENT SERVICES | BFT | P | 10/13/2000 | Center section with ramps only, see approved plans for extent of inspection (sheet S-1). | LEEG | LEEG | | BFT | P | 1904547 |
ICG ELECTRIC, INC | E= | C | 02/15/2001 | | MIKEC | MIKEC | | E= | C | 1904479 |
ICG ELECTRIC, INC | ES | C | 02/07/2001 | 3/w ug 600 amp c-t metered. icg elec | MIKEC | MIKEC | | ES | C | 1904462 |
ICG ELECTRIC, INC | ES | R | 02/05/2001 | no sheetmetal screws, parallel neutrals | MIKEC | MIKEC | | ES | R | 1904454 |
ICG ELECTRIC, INC | ER | C | 01/26/2001 | | MIKEC | MIKEC | | ER | C | 1904447 |
ICG ELECTRIC, INC | EUG | P | 12/18/2000 | trench | MIKEC | MIKEC | | EUG | P | 1904439 |
ICG ELECTRIC, INC | ER | P | 12/06/2000 | apt and garage | MIKEC | MIKEC | | ER | P | 1904431 |
ICG ELECTRIC, INC | EUG | P | 10/11/2000 | | MIKEC | MIKEC | | EUG | P | 1904423 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 03/01/2001 | Condensers set. Final complete. | LYNNS | LYNNS | | H= | C | 1904530 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 02/20/2001 | Complete. | LYNNS | LYNNS | | HD | C | 1904525 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/20/2001 | Need condensers set after pads are poured. | LYNNS | LYNNS | | H= | P | 1904518 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | R | 02/13/2001 | Need retaining angle on top of F/S damper as well as sides. | LYNNS | LYNNS | | HD | R | 1904510 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | R | 02/09/2001 | Need to replace 1" hangers with 1 1/2" wide on flexs, hang 12" flex up off ceiling grid, screw retaining angles to F/S damper not wall, seal vapor barriers on flexs. | LYNNS | LYNNS | | HD | R | 1904502 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | C | 02/01/2001 | Exhaust fan in storage area OK. | LYNNS | LYNNS | | HV | C | 1904495 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/12/2000 | OK to cover duct . Need to seal all vapor barriers on flexs and replace hangers on flex with 1 1/2" hangers. | LYNNS | LYNNS | | HD | P | 1904487 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | R | 11/30/2000 | NOT READY, ONLY ONE DUCT RUN INSTALLED AND NOT COMPLETE. | LYNNS | LYNNS | | HD | R | 1904538 |
ELITE PLUMBING & HEATING, INC. | P= | C | 02/26/2001 | RPBFP in meter pit, Note: no backflow preventer on the irrigation system at this time | LEE | LEE | | P= | C | 1904791 |
ELITE PLUMBING & HEATING, INC. | P= | L | 02/23/2001 | Permit locked up, 5:30 | LEE | LEE | | P= | L | 1904784 |
ELITE PLUMBING & HEATING, INC. | P= | P | 02/21/2001 | Need RP device, install PRV before meter, install vac-breaker on spk hose thread in mech. room, use approved floor drain strainer | LEE | LEE | | P= | P | 1904777 |
ELITE PLUMBING & HEATING, INC. | PTO | C | 12/06/2000 | | LEE | LEE | | PTO | C | 1904769 |
ELITE PLUMBING & HEATING, INC. | PTO | R | 12/05/2000 | Floor drain not piped to code, (floor to floor wet vent), secure copper thru-out, low test on dwv and H20, H/C w/c is 21" off wall | LEE | LEE | | PTO | R | 1904761 |
ELITE PLUMBING & HEATING, INC. | PB | C | 10/06/2000 | | JIMV | JIMV | | PB | C | 1904753 |
ELITE PLUMBING & HEATING, INC. | PB | R | 10/05/2000 | Need directions, could not find, drove around for 45 min, contractors # 495-1881 has been disconnected | LEE | LEE | | PB | R | 1904745 |