DPR CONSTRUCTION, INC. | B= | C | 08/10/2001 | | BEN | BEN | | B= | C | 1953500 |
DPR CONSTRUCTION, INC. | BFR | P | 07/26/2001 | 2ND FLOOR - ROOM 2301 - SHAFT FRAMING OK | BEN | BEN | | BFR | P | 1953493 |
DPR CONSTRUCTION, INC. | BFR | P | 07/20/2001 | FIRESTOPPING ABOVE CEILING IN EAST CORRIDOR TO SORT AREA | BEN | BEN | | BFR | P | 1953486 |
DPR CONSTRUCTION, INC. | BSP | R | 07/09/2001 | EAST CORRIDOR TO SORT AREA - FOUND 7 OPENINGS NOT FIRE STOPPED. | BEN | BEN | | BSP | R | 1953471 |
DPR CONSTRUCTION, INC. | BFR | P | 06/06/2001 | 2ND WALL @ EES SHOP (RM 207) AND EXTERIOR FRAMING @ FLASH ENG (RM 215) | BEN | BEN | | BFR | P | 1953463 |
DPR CONSTRUCTION, INC. | BFR | P | 05/30/2001 | 1ST - EES SHOP AND EAST WALL OF CORRIDOR 217 BSMT - ROOMS 103, 104 AND 106 | BEN | BEN | | BFR | P | 1953386 |
DPR CONSTRUCTION, INC. | BFR | P | 03/19/2001 | SNORKEL ROOMS EAST AND WEST EXTERIOR AND NORTH FURRED WALLS OK; BASEMENT ROOM GG2ST104 BETWEEN J.5 AND H.5 OK | DANF | DANF | | BFR | P | 1953125 |
DPR CONSTRUCTION, INC. | BFR | P | 03/08/2001 | 1ST FLOOR - COLUMNS AND EAST & WEST ENTRY AREAS, WEST WALL OF 212. BSMT - WALLS @ ROOMS 101,102,&107 AND WALL AT DOOR 103B | BEN | BEN | | BFR | P | 1953375 |
DPR CONSTRUCTION, INC. | BFR | P | 02/07/2001 | GG2-SORT AREA -- WALL FRAMING, SEE PLAN AT MY DESK FOR LOCATIONS | BEN | BEN | | BFR | P | 1953131 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 10/05/2001 | | JOHNW | JOHNW | | H= | C | 1953114 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/02/2001 | discussed balance | JOHNW | JOHNW | | H= | P | 1953021 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 07/19/2001 | need test and balance report | JOHNW | JOHNW | | H= | P | 1952979 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 07/19/2001 | | JOHNW | JOHNW | | HD | C | 1952986 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 06/22/2001 | duct in sort area complete ok for ceiling | JOHNW | JOHNW | | HD | P | 1952972 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 06/13/2001 | firesmoke dampers on east shaft frame ok / center area duct complete | JOHNW | JOHNW | | HD | P | 1952965 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 06/07/2001 | firesmoke dampers in shaft on west end ok and ok for ceiling on west end ok | JOHNW | JOHNW | | HD | P | 1952960 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/20/2001 | above ceiling rough complete except for the snorkel areas east and west ends | JOHNW | JOHNW | | HD | P | 1952953 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/08/2001 | lines K thru H and 6 thru 9 above ceiling rough ok on main level | JOHNW | JOHNW | | HD | P | 1952939 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/31/2001 | GG2 basement K line 1 thru 5 and mech room rough in also area at the AHU ok for duct wrap | JOHNW | JOHNW | | HD | P | 1952924 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 08/02/2001 | | JIMV | JIMV | | P= | C | 1953007 |
HEATING & PLUMBING ENGINEERS, INC | PB | C | 08/02/2001 | | JIMV | JIMV | | PB | C | 1953010 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 08/02/2001 | | JIMV | JIMV | | PTO | C | 1953015 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 07/31/2001 | need approved plans | JIMV | JIMV | | P= | P | 1952999 |
HEATING & PLUMBING ENGINEERS, INC | P= | R | 07/30/2001 | need phone # & point of contact | JIMV | JIMV | | P= | R | 1952993 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 02/23/2001 | STILL NEED APPROVED PLAN SHOWING RELOCATION OF THE 6" SANITARY UNDER ROOM # 118 (ELECTRICAL ROOM) TESTS OK | LEE | LEE | | PB | P | 1953120 |
HEATING & PLUMBING ENGINEERS, INC | PB | T | 02/21/2001 | PAID (REC#400047) Not ready, plans not available, no approved drawings on site that show scope of work being done, need approval for 1/8" per foot slope on new 6" sanitary that parallels existing 4" sanitary, NOTE: test ok if drawings are approved for 1/8" per foot slope, 2nd trip out for this one inspection | LEE | LEE | | PB | T | 1952946 |
HEATING & PLUMBING ENGINEERS, INC | PB | R | 02/02/2001 | Job temp. shut down per HPE office (Matt), never recieved cancellation ?? | LEE | LEE | | PB | R | 1952931 |