HOAR CONSTRUCTION, LLC | B= | C | 08/12/2003 | COMPLETE, FRAME INSPECTION OK, BFR COMPLETE | RICH | RICH | | B= | C | 2363666 | HOAR CONSTRUCTION, LLC | BFR | P | 06/02/2003 | EXTERIOR FRAME ANE ROOF OK, CONSULT CONTACTOR ON EXSPOSED PLASTIC AT TENANT MECH PLENIUMS | RICH | RICH | | BFR | P | 2363665 | HOAR CONSTRUCTION, LLC | BFT | C | 03/06/2003 | PADS AT SCREEN WALL SOUTH OF BUILDING A3 | RICH | RICH | | BFT | C | 2363664 | HOAR CONSTRUCTION, LLC | BSP | P | 03/05/2003 | PERIMETER WALLS AND UPPER ROOF ,OK | RICH | RICH | | BSP | P | 2363663 | HOAR CONSTRUCTION, LLC | BFR | P | 02/12/2003 | A1 BUILDING FRAME OK | RICH | RICH | | BFR | P | 2363662 | HOAR CONSTRUCTION, LLC | BFR | P | 01/29/2003 | PERIMETER WALLS ,NON BEARING AT SHELL | RICH | RICH | | BFR | P | 2363661 | HOAR CONSTRUCTION, LLC | BFR | P | 01/09/2003 | RECALL PLATE FASTENEING, UPPER WEST DORMER FRAME | RICH | RICH | | BFR | P | 2363659 | HOAR CONSTRUCTION, LLC | BFT | P | 12/27/2002 | INTERIOR PADS AT A2 BUILDING | RICH | RICH | | BFT | P | 2363657 | HOAR CONSTRUCTION, LLC | BFN | P | 12/23/2002 | INTERIOR PADS AND WALLS AT A2 BUILDING | RICH | RICH | | BFN | P | 2363655 | HOAR CONSTRUCTION, LLC | BFN | P | 12/19/2002 | WALL BLDG A2, SEE PLANS | RICH | RICH | | BFN | P | 2363654 | HOAR CONSTRUCTION, LLC | BFN | P | 12/18/2002 | WEST WALLY | RICH | RICH | | BFN | P | 2363652 | HOAR CONSTRUCTION, LLC | BFN | P | 12/17/2002 | EAST WALL , BUILDING A2 | RICH | RICH | | BFN | P | 2363650 | HOAR CONSTRUCTION, LLC | BFT | P | 12/16/2002 | PADS AT A2, SEE PLANS, A1 WALL COMPLETE | RICH | RICH | | BFT | P | 2363648 | HOAR CONSTRUCTION, LLC | BFN | P | 12/13/2002 | AI SOUTHWALL , PADS AT A2, SEE PLANS | RICH | RICH | | BFN | P | 2363646 | HOAR CONSTRUCTION, LLC | BFN | P | 12/12/2002 | BLDG A1 WALL EAST | RICH | RICH | | BFN | P | 2363644 | HOAR CONSTRUCTION, LLC | BFN | P | 12/10/2002 | GRADE BEAM WALLS AT BUILDING A1, SEE SHT S1.1A1 | RICH | RICH | | BFN | P | 2363642 | HOAR CONSTRUCTION, LLC | BFN | P | 12/06/2002 | WEST WALL BLDG A1 | RICH | RICH | | BFN | P | 2363640 | HOAR CONSTRUCTION, LLC | BFT | P | 12/05/2002 | PADS AT A1 BUILDING SEE SHT S1,1A1 | RICH | RICH | | BFT | P | 2363638 | HOAR CONSTRUCTION, LLC | BFN | P | 12/04/2002 | BUILDOING A1, PERIMETER PADS, SE SHEET S1.1A1, GRADE BEAM WALL AT BLDG A3, SEE S1.1A3 | RICH | RICH | | BFN | P | 2363636 | HOAR CONSTRUCTION, LLC | BFN | P | 12/02/2002 | INTERIOR PADS , GRADE BEAM WALL, SEE S1.1A3 | RICH | RICH | | BFN | P | 2363634 | HOAR CONSTRUCTION, LLC | BFN | P | 11/27/2002 | SEE APPROVED PLANS SHEET SA. 1A3; 4 PADS | DANF | DANF | | BFN | P | 2363632 | HOAR CONSTRUCTION, LLC | BFN | P | 11/22/2002 | Wall on 5 line M-G and 1 line M-C | RICK | RICK | | BFN | P | 2363628 | HOAR CONSTRUCTION, LLC | BFT | P | 11/22/2002 | Pads on 1 and 5 line, remainder of interior pads | RICK | RICK | | BFT | P | 2363630 | HOAR CONSTRUCTION, LLC | BFN | R | 11/21/2002 | no one one site and no one to be on site until after noon | JIMP | JIMP | | BFN | R | 2363626 | HOAR CONSTRUCTION, LLC | BFN | P | 11/19/2002 | SEE SHT S1.1A3, GRADE BEAM TO M LINE | RICH | RICH | | BFN | P | 2363625 | HOAR CONSTRUCTION, LLC | BFT | P | 11/15/2002 | 12 PADS TO Q LINE WEST, SEE S1.1A3 | RICH | RICH | | BFT | P | 2363623 | HOAR CONSTRUCTION, LLC | BFN | R | 11/14/2002 | CANCEL | RICH | RICH | | BFN | R | 2363621 | HOAR CONSTRUCTION, LLC | BFT | P | 11/13/2002 | SEE S1.1A3, PADS WEST , NORTH AND SOUTH | RICH | RICH | | BFT | P | 2363619 | HOAR CONSTRUCTION, LLC | BFN | R | 11/06/2002 | SHOPS AT BRIARGATE, CONSULT START OF PROJECT, NO PADS READY | RICH | RICH | | BFN | R | 2363617 | WHITNEY ELECTRIC CO | E= | C | 08/06/2003 | | JERRY | JERRY | | E= | C | 2363587 | WHITNEY ELECTRIC CO | E= | P | 08/01/2003 | FIX TEMPORARY,PERMIT FOR FOUNTAINS,PERMIT FOR PARKING LOT AND LANDSCAPE LIGHTING,CHECK HIGH GFCI'S | JERRY | JERRY | | E= | P | 2363585 | WHITNEY ELECTRIC CO | ES | C | 05/12/2003 | 4-WIRE UNDERGROUND,3 PHASE,C T METER,277/480,600 AMP,HOUSE PANEL FOR NEW STRIP MALL,WHITNEY ELECTRIC | JERRY | JERRY | | ES | C | 2363581 | WHITNEY ELECTRIC CO | EUG | P | 05/12/2003 | BOND REBAR IN 2 FOUNTAINS | JERRY | JERRY | | EUG | P | 2363583 | WHITNEY ELECTRIC CO | ES | P | 05/07/2003 | WIREWAY ABOVE DISCONNECT | JERRY | JERRY | | ES | P | 2363579 | WHITNEY ELECTRIC CO | ER | P | 04/30/2003 | GROUND RODS,AREA TO BE PAVED | JERRY | JERRY | | ER | P | 2363577 | WHITNEY ELECTRIC CO | ER | P | 04/02/2003 | REAR WALLS | JERRY | JERRY | | ER | P | 2363573 | WHITNEY ELECTRIC CO | EUG | P | 04/02/2003 | ELECTRIC ROOM | JERRY | JERRY | | EUG | P | 2363575 | WHITNEY ELECTRIC CO | EUG | P | 02/05/2003 | POLE LIGHT UNDERGROUND COMPLETE | JERRY | JERRY | | EUG | P | 2363571 | WHITNEY ELECTRIC CO | EUG | P | 01/30/2003 | FOR SERVICE BEHIND A-2 | JERRY | JERRY | | EUG | P | 2363567 | WHITNEY ELECTRIC CO | EUG | P | 01/30/2003 | POLE LIGHTS BETWEEN A-1 AND THE EDGE OF A-3 | JERRY | JERRY | | EUG | P | 2363569 | WHITNEY ELECTRIC CO | EUG | P | 01/28/2003 | FEEDS TO UNITS BEHIND BUILDING | JERRY | JERRY | | EUG | P | 2363565 | WHITNEY ELECTRIC CO | EUG | P | 01/22/2003 | PVC BEHIND BUILDING FOR SUB PANELS TO EACH UNIT O K | JERRY | JERRY | | EUG | P | 2363563 | WHITNEY ELECTRIC CO | EUG | P | 01/21/2003 | 3/4 to the east behind the building | JERRY | JERRY | | EUG | P | 2363561 | TRAUTMAN & SHREVE, INC. | P= | C | 07/08/2003 | PENDING ELECTRIC HEAT INSTALLED IN WATER ENTRY ROOMS | LEE | LEE | | P= | C | 2363615 | TRAUTMAN & SHREVE, INC. | PB+ | C | 05/16/2003 | | JACK | JACK | | PB+ | C | 2363613 | TRAUTMAN & SHREVE, INC. | PTO | P | 04/03/2003 | NEED FLOOR DRAIN VTR, NEED TO SLEEVE WATER MAINS AT BLOCK WALL PENETRATIONS (A-2) | LEE | LEE | | PTO | P | 2363611 | TRAUTMAN & SHREVE, INC. | PB | C | 04/03/2003 | JACK COMPLETED BASE ON 4-1 | LEE | LEE | | PB | C | 2363609 | TRAUTMAN & SHREVE, INC. | PB | P | 04/01/2003 | A-1 AND A-2 WATER COMPLETE, A-3 FLOOR DRAIN COMPLETE | JACK | JACK | | PB | P | 2363607 | TRAUTMAN & SHREVE, INC. | PB | P | 02/19/2003 | A1 AND A2 COMPLETE, STILL NEED F/D FOR A3 | LEE | LEE | | PB | P | 2363605 | TRAUTMAN & SHREVE, INC. | PB | P | 02/11/2003 | PI BETWEEN A-1 AND A-2 NOT DONE, A-2 COMPLETE | JACK | JACK | | PB | P | 2363603 | TRAUTMAN & SHREVE, INC. | PB | R | 02/06/2003 | CHANGED FROM FEE, CONTRACTOR FROM OUT OF TOWN, DID NOT KNOW 8:00 CALL IN FOR INSPECTION WOULD BE SAME DAYAGAIN TRAILER LOCKED UP (11:30), NO ATTEMPT TO TEST, PIPING NOT COMPLETE | LEE | LEE | | PB | R | 2363601 | TRAUTMAN & SHREVE, INC. | PB | T | 01/23/2003 | PAID (REC#497576) TRAILER LOCKED UP DUE TO MEETING, NO ONE WOULD UNLOCK TO ACCESS PLANS AND PERMIT, ADDITIONAL TRUNK AND RISERS OK IN A3 BUT NEED TO REVISE SHELL DRAWINGS TO SHOW CHANGES | LEE | LEE | | PB | T | 2363599 | TRAUTMAN & SHREVE, INC. | PB | P | 01/15/2003 | A-1 DWV ok, H20 overhead from A-2 | LEE | LEE | | PB | P | 2363593 | TRAUTMAN & SHREVE, INC. | PB | P | 01/08/2003 | A-3 building--- mains & risers ok, need floor drain and H20 | LEE | LEE | | PB | P | 2363591 | TRAUTMAN & SHREVE, INC. | PB | R | 01/07/2003 | Building A-3 lost test, Note: A-1 & A-2 on same permit but not ready at this time | LEE | LEE | | PB | R | 2363589 |
|
|