SKYLINE CONSTRUCTION SERVICES | B= | C | 12/04/2002 | complete | RICH | RICH | | B= | C | 2389635 |
SKYLINE CONSTRUCTION SERVICES | B= | R | 11/27/2002 | Plumbing and mechanical finals. Penetrations in walls. Not ready for final inspection. | CURTIS | CURTIS | | B= | R | 2389633 |
SKYLINE CONSTRUCTION SERVICES | BFR | C | 11/13/2002 | ok | RICH | RICH | | BFR | C | 2389631 |
SKYLINE CONSTRUCTION SERVICES | BFR | P | 11/12/2002 | INTERIOR WALLS OK, MECH INSPECT | RICH | RICH | | BFR | P | 2389629 |
BOULTON ELECTRICAL SERVICES | E= | C | 11/27/2002 | | JERRY | JERRY | | E= | C | 2389641 |
BOULTON ELECTRICAL SERVICES | E= | P | 11/26/2002 | for final support track lighting,working space fot water heater disconnect | JERRY | JERRY | | E= | P | 2389639 |
BOULTON ELECTRICAL SERVICES | ER | P | 11/08/2002 | walls | JERRY | JERRY | | ER | P | 2389637 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 12/03/2002 | | JOHNW | JOHNW | | H= | C | 2389627 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 11/26/2002 | | JOHNW | JOHNW | | HD | C | 2389625 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 11/26/2002 | need to verify smoke evec.system innerlock | JOHNW | JOHNW | | H= | P | 2389623 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 11/15/2002 | still ok for rough in / need all the duct in before a duct complete | JOHNW | JOHNW | | HD | P | 2389621 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 11/14/2002 | above ceiling rough ok / not ready for duct final need to complete flex duct | JOHNW | JOHNW | | HD | P | 2389619 |
AMBERY MECHANICAL CO., INC. | P= | C | 11/27/2002 | RPBP installed | LEE | LEE | | P= | C | 2389617 |
AMBERY MECHANICAL CO., INC. | P= | P | 11/26/2002 | Need to pipe R.P. drain to floor drain, sink not set, need to seal around floor drain | LEE | LEE | | P= | P | 2389615 |
AMBERY MECHANICAL CO., INC. | PTO | C | 11/08/2002 | waterlines for pedicure chairs will be marked non-potable with backflow devices at waterheater per kye | JACK | JACK | | PTO | C | 2389613 |