SAHARA INC | B= | C | 05/24/2004 | | JOHNP | JOHNP | | B= | C | 2549147 |
SAHARA INC | B= | P | 05/14/2004 | TURN LATCH OR SIGN AT DOOR; STAIR RISE & RAIL AT REAR STAIRS | JOHNP | JOHNP | | B= | P | 2549143 |
SAHARA INC | BBB | C | 02/11/2004 | | JOHNP | JOHNP | | BBB | C | 2549129 |
SAHARA INC | BFR | C | 02/11/2004 | | JOHNP | JOHNP | | BFR | C | 2549133 |
SAHARA INC | BSP | P | 02/11/2004 | PIER LOG PICKED UP | JOHNP | JOHNP | | BSP | P | 2549139 |
SAHARA INC | BFR | P | 01/20/2004 | SEE APPROVED PLANS | JOHNP | JOHNP | | BFR | P | 2549125 |
SAHARA INC | BSP | P | 12/23/2003 | CANOPY FRAME OK | JOHNP | JOHNP | | BSP | P | 2549120 |
SAHARA INC | BSP | R | 12/22/2003 | COULDN'T FIND SUPERINTENDANT - DIDN'T KNOW WHAT PART WAS TO BE INSPECTED | JOHNP | JOHNP | | BSP | R | 2549117 |
SAHARA INC | BFR | P | 12/16/2003 | WALLS OK AFTER PLUMBING & ELECTRICAL INSPECTIONS | JOHNP | JOHNP | | BFR | P | 2549112 |
SAHARA INC | BFR | P | 11/21/2003 | ROOF STRUCTURE - LINES F TO G; 1 TO 3.7, NEED WELD INSPECTORS REPORT | JOHNP | JOHNP | | BFR | P | 2549109 |
SAHARA INC | BBB | P | 11/21/2003 | A.7 TO B, 2 TO 2.3 @ 108'; 3.7, C TO C.5 @ 114'4" OK | JOHNP | JOHNP | | BBB | P | 2549104 |
SAHARA INC | BBB | P | 11/19/2003 | LINE A, 3.7 - 4.0; 114" TO 118" ELEVATION | JOHNP | JOHNP | | BBB | P | 2549101 |
SAHARA INC | BBB | P | 11/18/2003 | TOP OF WALLS WEST, FRONT WALL INTERMEDIATES | RICH | RICH | | BBB | P | 2549095 |
SAHARA INC | BBB | P | 11/14/2003 | LINE 4, C-D; 108 - 112 ELEVATION | JOHNP | JOHNP | | BBB | P | 2549093 |
SAHARA INC | BBB | L | 11/13/2003 | TRAILER LOCKED | JOHNP | JOHNP | | BBB | L | 2549087 |
SAHARA INC | BBB | P | 11/12/2003 | LINE 4 - A-C & FIRST COARSE ON NORTH ADDITION | JOHNP | JOHNP | | BBB | P | 2549085 |
SAHARA INC | BBB | P | 11/10/2003 | PARTIAL-SEE PAGE A-103, G LINE 1-3 AND 1 LINE F-G ELEVATION 124/ CTL THOMPSON WILL PROVIDE REPORT | BLAKE | BLAKE | | BBB | P | 2549079 |
SAHARA INC | BBB | P | 11/07/2003 | TOP, SOUTH EAST WALL | JOHNP | JOHNP | | BBB | P | 2549071 |
SAHARA INC | BFR | P | 11/07/2003 | LOCKERS, REST ROOMS & LOBBY AREA | JOHNP | JOHNP | | BFR | P | 2549073 |
SAHARA INC | BBB | P | 10/15/2003 | AT GRADE ON LINES 1 & 3 PENDING TERACON REPORT | JOHNP | JOHNP | | BBB | P | 2549065 |
SAHARA INC | BFN | C | 10/14/2003 | | JOHNP | JOHNP | | BFN | C | 2549049 |
SAHARA INC | BFT | C | 10/14/2003 | | JOHNP | JOHNP | | BFT | C | 2549054 |
SAHARA INC | BSP | T | 10/14/2003 | PAID (REC#537360)ADDITIONAL PLAN REVIEW TIME: $40.000 From: RONW Jose Sanchez = batroom remodels = okay | RONW | RONW | | BSP | T | 2549057 |
SAHARA INC | BSP | T | 10/14/2003 | PAID (REC#537360)ADDITIONAL PLAN REVIEW TIME: $80.000 From: RUSSELL Revised mechanical S.A. & E.A. and rearranged floor plan in toilet rooms | RUSSELL | RUSSELL | | BSP | T | 2549063 |
SAHARA INC | BFN | P | 10/07/2003 | WALLS , SEE SHEET SO1.1, DRILL LOG AND ENGINEERS LETTERS FOR REPAIRS AT CASSIONS ON FILE | RICH | RICH | | BFN | P | 2549046 |
SAHARA INC | BFN | T | 10/06/2003 | PAID (REC#535818)REPAIRS NOT DONE AT CUT CASSION BAR,, PROVIDE STAMPED DETAILS OR LETTER ON SITE, REAR WALL NOT PER DETAILS, MIN BAR CLEARANCE TO VOID NOT CORRECT | RICH | RICH | | BFN | T | 2549041 |
SAHARA INC | BFN | T | 10/03/2003 | PAID (REC#535663)STAMPED DETAILS NOT ON SITE FOR CASSION STEEL REPAIRS , DO NOT POUR | RICH | RICH | | BFN | T | 2549038 |
SAHARA INC | BFN | R | 10/02/2003 | WALL AT SOUTH ETENSION, CUT CASSION DOWELS, SEE S201, M/S301 DETAIL, 3-#5S MIN EXTENDED IN GRADE BEAM | RICH | RICH | | BFN | R | 2549034 |
SAHARA INC | BFN | P | 09/18/2003 | AS MARKED ON APPROVED PLANS | JOHNP | JOHNP | | BFN | P | 2549031 |
SAHARA INC | BFN | P | 08/26/2003 | REST OF DRILLED PIERS, TERACON ON SITE | JOHNP | JOHNP | | BFN | P | 2549025 |
SAHARA INC | BFT | P | 08/25/2003 | NEED DRILLED PIER LOG FROM TERACON | JOHNP | JOHNP | | BFT | P | 2549022 |
SPECTRUM, INC. | E= | C | 02/11/2004 | | RON | RON | | E= | C | 2549017 |
SPECTRUM, INC. | ER | P | 02/06/2004 | CEILINGS ACCOUNTING OFFICE, AND SERVICE DEPT. OFFICE. | DAVID | DAVID | | ER | P | 2549011 |
SPECTRUM, INC. | ER | P | 01/20/2004 | WALLS ACCOUNTING OFFICE. | RON | RON | | ER | P | 2549007 |
SPECTRUM, INC. | ER | P | 01/16/2004 | CEILINGS AREA "A" OK TO DROP. | DAVID | DAVID | | ER | P | 2549002 |
SPECTRUM, INC. | ER | P | 01/12/2004 | WALLS ACCOUNTING AREA, CEILINGS RESTROOMS. | RON | RON | | ER | P | 2548998 |
SPECTRUM, INC. | ER | P | 12/24/2003 | WALLS, SOFFITS. | RON | RON | | ER | P | 2548993 |
SPECTRUM, INC. | ER | P | 12/16/2003 | WALLS, SERVICE BAY EAST. | RON | RON | | ER | P | 2548990 |
SPECTRUM, INC. | ER | P | 12/03/2003 | WALLS EAST PARTS AREA. | DAVID | DAVID | | ER | P | 2548988 |
SPECTRUM, INC. | ER | P | 11/05/2003 | WALLS | RON | RON | | ER | P | 2548983 |
SPECTRUM, INC. | ES | C | 10/27/2003 | 4W/200 AMP. 277/480. IN HOUSE. | RON | RON | | ES | C | 2548981 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 03/03/2004 | | JOHNW | JOHNW | | H= | C | 2548976 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 02/27/2004 | | JOHNW | JOHNW | | HD | C | 2548974 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/06/2004 | AREA A AND C ALSO WASH BAY / NEED TO PROTECT PVC IN PLENUM RETURN | JOHNW | JOHNW | | H= | P | 2548969 |
CONTRACT MECHANICAL SVC INC | H= | C | 01/29/2004 | GAS CONTRACTOR ONLY | JOHNW | JOHNW | | H= | C | 2548911 |
CONTRACT MECHANICAL SVC INC | HI | P | 01/08/2004 | MED PRESSURE GAS PIPING OK / NEED TO COMPLETE TIE-IN WITH REGULATORS AND FINISH LABELS | JOHNW | JOHNW | | HI | P | 2548908 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/30/2003 | DUCT IN PARTS AREA COMPLETE | JOHNW | JOHNW | | HD | P | 2548962 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | P | 12/30/2003 | RADIANT HEATERS VENTS OK | JOHNW | JOHNW | | HV | P | 2548966 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 11/24/2003 | EAST ENT UNDERGROUND DUCT OK | JOHNW | JOHNW | | HD | P | 2548959 |
CONTRACT MECHANICAL SVC INC | HC | C | 09/25/2003 | | JOHNW | JOHNW | | HC | C | 2548903 |
CONTRACT MECHANICAL SVC INC | HI | P | 09/19/2003 | ROUGH IN OK | JOHNW | JOHNW | | HI | P | 2548900 |
CONTRACT MECHANICAL SVC INC | P= | C | 02/26/2004 | | LEE | LEE | | P= | C | 2548952 |
CONTRACT MECHANICAL SVC INC | PRD | C | 02/26/2004 | RECEIVED LETTER FROM ENGINEER TO ALLOW EXISTING DOWN SPOUT FROM UPPER ROOF TO BE REPIPED TO OTHER SECTION OF THE LOWER ROOF. | LEE | LEE | | PRD | C | 2548955 |
CONTRACT MECHANICAL SVC INC | PRD | P | 02/06/2004 | FRONT MIDDLE SECTION NOT SIZED PER PLANS | LEE | LEE | | PRD | P | 2548947 |
CONTRACT MECHANICAL SVC INC | P= | P | 02/06/2004 | SEE PRD | LEE | LEE | | P= | P | 2548945 |
CONTRACT MECHANICAL SVC INC | P= | R | 01/29/2004 | EXPOSE C/O AT LOUNGE SINK, NEED ALL ROOF DRAINS UNCOVERED, COMPLETED, AND ON TEST, SUPPORT AT CHANGES OF DIRECTION, EVERY 4' AND VERTICAL RISERS | LEE | LEE | | P= | R | 2548938 |
CONTRACT MECHANICAL SVC INC | PTO | C | 01/29/2004 | | LEE | LEE | | PTO | C | 2548940 |
CONTRACT MECHANICAL SVC INC | PB | C | 11/12/2003 | SAND AND OIL DRAINS OK | LEE | LEE | | PB | C | 2548933 |
CONTRACT MECHANICAL SVC INC | PTO | P | 11/03/2003 | RESTROOMS, LOUNGE AND BREAKROOM SINK OK | LEE | LEE | | PTO | P | 2548930 |
CONTRACT MECHANICAL SVC INC | PB | P | 10/15/2003 | LOCKER ROOM AND RESTROOMS OK, PLANS REVISED TO SHOW CHANGES IN RESTROOMS | LEE | LEE | | PB | P | 2548925 |
CONTRACT MECHANICAL SVC INC | PB | P | 09/15/2003 | RESTROOMS AND BREAKROOM SINK OK. NOTE: ALL W/C HORIZ DRY VENTS TO HAVE ACCESSABLE C/OUTS AT FINAL | LEE | LEE | | PB | P | 2548921 |
CONTRACT MECHANICAL SVC INC | PB | T | 09/12/2003 | PAID (REC#532032) NO PLANS, NO PERMIT, JOB TRAILER ALL LOCKED UP AT 3:50 | LEE | LEE | | PB | T | 2548916 |