PINKARD CONSTRUCTION COMPANY | B= | C | 12/04/2003 | | RICK | RICK | | B= | C | 2589005 |
PINKARD CONSTRUCTION COMPANY | BSP | P | 12/02/2003 | FIRECAULKING | RICK | RICK | | BSP | P | 2588996 |
PINKARD CONSTRUCTION COMPANY | BSP | P | 12/01/2003 | FIRECAULKING COMPLETE | RICK | RICK | | BSP | P | 2588988 |
PINKARD CONSTRUCTION COMPANY | BSP | R | 11/26/2003 | CORRIDER ONLY / EAST CORRIDOR MISSING SOME FIRECAULK IN HOLES ABOVE CEILING GRIDS | JOND | JOND | | BSP | R | 2588980 |
PINKARD CONSTRUCTION COMPANY | BFR | P | 11/04/2003 | AREA #3 FRAME OK | CLOVIS | CLOVIS | | BFR | P | 2588972 |
PINKARD CONSTRUCTION COMPANY | BFR | P | 10/28/2003 | AREA 1 FRAME COMPLETE; AREA 2 FRAME COMPLETE EXCLUDING PLUMBING AREA WHICH IS PENDING PLUMBING INSPECTION | CLOVIS | CLOVIS | | BFR | P | 2588966 |
FOSTER ELECTRIC CORPORATION | E= | C | 12/02/2003 | | GARYL | GARYL | | E= | C | 2589037 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/26/2003 | CEILINGS OK TO CLOSE ON PHASE 1,2, & 3 | GARYL | GARYL | | ER | P | 2589028 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/03/2003 | WALLS OK TO COVER ON 3RD PHASE | GARYL | GARYL | | ER | P | 2589020 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/27/2003 | WALLS ONLY FOR PHASES 1 AND 2 | GARYL | GARYL | | ER | P | 2589013 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 12/03/2003 | FINAL COMPLETE. | LYNNS | LYNNS | | H= | C | 2589066 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 12/02/2003 | FINAL ON THE CONDENSATE DRAINS ONLY. | LYNNS | LYNNS | | H= | C | 2588945 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 11/19/2003 | NEED TO INSTALL SECONDARY PANS UNDER HEAT PUMPS 7 THROUGH 12 BEFORE FINAL. | LYNNS | LYNNS | | HD | C | 2589060 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 11/12/2003 | OK TO WRAP. NEEDS HEAT PUMP OVER BATH ROOM, TO HAVE RETURN AIR DUCT COMPLETED. ALSO RESOLVE ISSUE WITH RETURN AIR IN EAST STORAGE ROOM MUST COMMUNICATE WITH RETURN AIR PLENUM. | JON | JON | | HD | P | 2589051 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | R | 11/10/2003 | NO AP[PROVED SET OF PLANS FOUND. ENSURE ALL DUCT JOINTS SEALED. NEED FIRE SOMKE DAMPER INSTRUCTIONS, AND BE ABLE TO SEE FRAMING. | JON | JON | | HD | R | 2589043 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 11/06/2003 | 12- HEAT PUMPS WITH SUPPLY, RETURN AND CONDENSATE OK. | LYNNS | LYNNS | | HWP | C | 2588937 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 12/01/2003 | | JACK | JACK | | P= | C | 2588959 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 11/03/2003 | | JACK | JACK | | PTO | C | 2588953 |