ALLIANCE GEN. CONTRACTORS, LLC | B= | C | 06/22/2004 | | DANF | DANF | | B= | C | 2669593 |
ALLIANCE GEN. CONTRACTORS, LLC | B= | R | 06/16/2004 | 1) FRAME FINAL, LETTER FOR FRONT WALL INSPECTION AND SIDE WALL 2) REMOVE SLIDE BOLTS FROM REAR EXIT DOOR 3) PLAN CHECK TO OK DELETING WEST EXIT DOOR 4) EXIT SIGNAGE REAR HALL 5) 42" REAR GUARDRAIL AND FILL OPENING TO LESS THEN 4" 6) ENTRY STEP RISE EXCEEDS 3/8" DIFFERENCE AND HANDRAIL OF BOTH SIDES 7) COMPLETE RAMP HANDRAILS AND GUARDRAIL, TEMP IS IN PLACE | DANF | DANF | | B= | R | 2669584 |
ALLIANCE GEN. CONTRACTORS, LLC | BSP | P | 06/03/2004 | OK TO POUR RAMP WALL PENDING ENGINEER LETTER TO OK HORZ STEEL 16" OC; AND NEED LETTER FOR STRUCTURAL WALL FRAMING SOUTH WALL AT ENTRY | DANF | DANF | | BSP | P | 2669577 |
ALLIANCE GEN. CONTRACTORS, LLC | BFT | P | 05/26/2004 | RAMP FOOTER | DANF | DANF | | BFT | P | 2669569 |
ALLIANCE GEN. CONTRACTORS, LLC | BSP | T | 05/10/2004 | PAID (REC#570648)ADDITIONAL PLAN REVIEW TIME: $50.000 From: RUSSELL Revised plumbing | RUSSELL | RUSSELL | | BSP | T | 2669560 |
ALLIANCE GEN. CONTRACTORS, LLC | BLA | P | 05/04/2004 | OK EXCEPT EAST TOWER | DANF | DANF | | BLA | P | 2669552 |
ALLIANCE GEN. CONTRACTORS, LLC | BLA | R | 04/30/2004 | NOT READY YET; RECALL | DANF | DANF | | BLA | R | 2669545 |
ALLIANCE GEN. CONTRACTORS, LLC | BFR | P | 04/23/2004 | EXTERIOR FURRING OF SIDE WALLS AND FRONT WALL; ALSO TUBE STEEL REINFORCEMENT OF SIDE WALLS OK; NOTED ON APPROVED PLANS | DANF | DANF | | BFR | P | 2669537 |
ALLIANCE GEN. CONTRACTORS, LLC | BFR | P | 04/20/2004 | INPROGRESS; ROOF SOFFET; NEED BOTTOM TRACK SCREWED 6" OC INTO DECK; COMPLETE FRAMING | DANF | DANF | | BFR | P | 2669520 |
ALLIANCE GEN. CONTRACTORS, LLC | BSP | P | 04/20/2004 | OKED TO STOCK FURNATURE IN SHELVING AT REAR OF WAREHOUSE WERE NO CONSTRUCTION; LETTER ON FILE FROM FIREDEPT TO OK STORAGE | DANF | DANF | | BSP | P | 2669528 |
ALLIANCE GEN. CONTRACTORS, LLC | BFR | R | 03/29/2004 | | DANF | DANF | | BFR | R | 2669512 |
ALLIANCE GEN. CONTRACTORS, LLC | BFT | P | 03/22/2004 | 2 EACH WEST 48" PIERS OK; NEED COMPACTION | DANF | DANF | | BFT | P | 2669504 |
ALLIANCE GEN. CONTRACTORS, LLC | BFT | P | 03/09/2004 | 6 EACH 48" DIA PIERS OK; REVISED DETAIL WITH VOID ON FILE; STILL NEED 2 EACH WEST PIERS INSPECTED | DANF | DANF | | BFT | P | 2669495 |
ALLIANCE GEN. CONTRACTORS, LLC | BFR | P | 02/19/2004 | BATHROOM WALLS; WHAREHOUSE OFFICES | DANF | DANF | | BFR | P | 2669488 |
ALLIANCE GEN. CONTRACTORS, LLC | BFR | P | 02/10/2004 | SEE APROVED PLANS SHEET A2 | DANF | DANF | | BFR | P | 2669480 |
MANITOU ELECTRIC, LLC | E= | C | 06/09/2004 | DID NOT SEE PERMIT | MIKEC | MIKEC | | E= | C | 2669472 |
MANITOU ELECTRIC, LLC | ER | P | 04/30/2004 | WALLS AND LIGHTS ENTRY-WALLS S.E. CORNER | RED | RED | | ER | P | 2669465 |
MANITOU ELECTRIC, LLC | ER | P | 04/22/2004 | EXTERIOR WALLS MAIN AREA, OUTSIDE LIGHTS, OFFICE CEILINGS | MIKEC | MIKEC | | ER | P | 2669458 |
MANITOU ELECTRIC, LLC | ER | P | 03/26/2004 | WALLS. NOTE; LB BELOW PANEL JO5 TO REMAIN ACCESSABLE | MIKEC | MIKEC | | ER | P | 2669451 |
MANITOU ELECTRIC, LLC | E= | R | 02/11/2004 | NOT READY FOR FINAL | MIKEC | MIKEC | | E= | R | 2669443 |
MANITOU ELECTRIC, LLC | ER | P | 02/05/2004 | SLAB AND WALLS | MIKEC | MIKEC | | ER | P | 2669435 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/08/2004 | HVAC FINAL. | LYNNS | LYNNS | | H= | C | 2669427 |
CONTRACT MECHANICAL SVC INC | H= | C | 06/08/2004 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 2669336 |
CONTRACT MECHANICAL SVC INC | HC | C | 04/22/2004 | LOAD CHANGE. 3- NEW RTU'S = 1020 CUBIC FEET. SOME DEMO ON EXISTING UNIT HEATER'S. | JON | JON | | HC | C | 2669321 |
CONTRACT MECHANICAL SVC INC | HI | C | 04/22/2004 | DESIGN TO PLAN FOR THREE NEW RTU'S. 10 LB TEST AT THREE GAUGES. | JON | JON | | HI | C | 2669327 |
CONTRACT MECHANICAL SVC INC | H= | P | 04/22/2004 | NEEDS FINAL TIE IN AT RTU'S X3. ALSO NEEDS OLD EXISTING LINES AT UNIT HEATER'S CAPPED OFF. | JON | JON | | H= | P | 2669314 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/22/2004 | DUCT WRAP COMPLETE IN FRONT ENTRY. | JON | JON | | HD | P | 2669420 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/19/2004 | OK FOR WRAP AT FRONT ENTRANCE HEAT RUNS. | JON | JON | | HD | P | 2669407 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/12/2004 | REVIEWING PLANS FOR FIRE DAMPER LOCATIONS. NEED SMOKE/FIREDAMPER INSTRUCTIONS. | JON | JON | | HD | P | 2669398 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/30/2004 | RTU'S 1, 2 AND 3 ROUGH DUCT, OK TO INSULATE. NEED TO SEE SUPPLY RUNS TO ENTRYWAY, RETURN TO NORTH OFFICES AND EXHAUST TO BATHS. | LYNNS | LYNNS | | HD | P | 2669391 |
CONTRACT MECHANICAL SVC INC | P= | C | 06/04/2004 | | LEE | LEE | | P= | C | 2669383 |
CONTRACT MECHANICAL SVC INC | PTO+ | C | 05/27/2004 | WILL NEED TO SLEEVE WALL WHERE COPPER PENETRATES ABOVE NEW SINK BY FINAL | LEE | LEE | | PTO+ | C | 2669374 |
CONTRACT MECHANICAL SVC INC | PB+ | C | 05/11/2004 | PENDING PLANS REFLECT (PLANS NOT ON SITE) | LEE | LEE | | PB+ | C | 2669366 |
CONTRACT MECHANICAL SVC INC | PTO | C | 02/18/2004 | | LEE | LEE | | PTO | C | 2669358 |
CONTRACT MECHANICAL SVC INC | PB | C | 02/06/2004 | | LEE | LEE | | PB | C | 2669350 |
CONTRACT MECHANICAL SVC INC | PB | T | 02/04/2004 | PAID (REC#554122) PLUMBING TEST FABRICATED NEAR WEST RESTROOM GROUP, BLOW UP STUCK INSIDE 2" PIPE THEN FILLED UP WITH WATER FOR TEST | LEE | LEE | | PB | T | 2669343 |