SCHEINER BROWN GROUP, INC. | B= | C | 08/19/2004 | CARD SIGNED & VERIFIED W/RICH... FINAL HAS BEEN COMPLETED
| KEN | KEN | | B= | C | 2757760 |
SCHEINER BROWN GROUP, INC. | B= | P | 08/12/2004 | PATTAIL, STOCK , TRAIN, FINISH FRONT EXTERIOR AND CANOPY, REMOVE THUMB LATCHES AT MAIN EXIT, SMOKE SEALS AT REAR CORRIDOR DOORS, GRAB BARS AT HANDICAP DRESSING, SIDE GRAB BARS 12" MAX OUT OF CORNER | RICH | RICH | | B= | P | 2757754 |
SCHEINER BROWN GROUP, INC. | BFR | C | 07/15/2004 | UPPER ROOF FRAME AND OVERFRAMED GABLE, OK, SEE SHEET S1 | RICH | RICH | | BFR | C | 2757747 |
SCHEINER BROWN GROUP, INC. | BFR | P | 06/29/2004 | STORE FRONT SOFFITS AND COLUMNS, GRID CEILING AND DROPS, RECALL ROOF EXTENSION AND INSULATION, ELECTRICL BOX AT RATED WALL, >16 SQ IN. | RICH | RICH | | BFR | P | 2757739 |
SCHEINER BROWN GROUP, INC. | BFR | P | 06/18/2004 | REAR WALLS AT STORAGE, RESTROOMS, CORRIDOR , DISPLAY SOFFITS, OTHER ROUGHS | RICH | RICH | | BFR | P | 2757733 |
SCHEINER BROWN GROUP, INC. | BSP | P | 06/10/2004 | FROST WALL AT ENTRY OK | RICH | RICH | | BSP | P | 2757725 |
FOSTER ELECTRIC CORPORATION | E= | C | 08/12/2004 | | JERRY | JERRY | | E= | C | 2757633 |
FOSTER ELECTRIC CORPORATION | ES | C | 07/08/2004 | 4-WIRE FROM EXISTING WIREWAY,3 PHASE,277/480,100 AMP SERVICE FOR NEW RETAIL,FOSTER ELECTRIC | JERRY | JERRY | | ES | C | 2757624 |
FOSTER ELECTRIC CORPORATION | ER | P | 07/07/2004 | REAR OFFICE WALLS | JERRY | JERRY | | ER | P | 2757616 |
FOSTER ELECTRIC CORPORATION | ER | P | 06/29/2004 | WALLS AND HARD LID | JERRY | JERRY | | ER | P | 2757608 |
FOSTER ELECTRIC CORPORATION | ER | P | 06/28/2004 | WALLS AND MIDDLE HARD LID CEILING | JERRY | JERRY | | ER | P | 2757601 |
FOSTER ELECTRIC CORPORATION | ER | P | 06/18/2004 | WALLS IN REAR ROOMS | JERRY | JERRY | | ER | P | 2757594 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 08/05/2004 | CORRECTIONS MADE. | LYNNS | LYNNS | | H= | C | 2757663 |
WESTERN SUN BUILDERS | H= | C | 08/05/2004 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 2757687 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/04/2004 | NEED 1/4" SCREEN IN COMBUSTION AIR AND BATH EXHAUST CAPS. NEED TO RAISE PLUMBING VENT 3' ABOVE COMB. AIR INTAKE. | LYNNS | LYNNS | | H= | P | 2757657 |
WESTERN SUN BUILDERS | HC | C | 07/27/2004 | | LYNNS | LYNNS | | HC | C | 2757671 |
WESTERN SUN BUILDERS | HI | C | 07/27/2004 | 10# TEST AND DESIGN OK. | LYNNS | LYNNS | | HI | C | 2757679 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/28/2004 | ROUGH DUCT IN FRONT AREA OF STORE OK. CANNOT HAVE PLASTIC IN RETURN AIR SPACE ABOVE CEILING. | LYNNS | LYNNS | | HD | P | 2757648 |
RIAL HEATING AND AIR CONDITIONING, INC. | HRP | C | 06/17/2004 | 4- 230# TESTS ON REF LINES TO AHU'S. | LYNNS | LYNNS | | HRP | C | 2757640 |
WESTERN SUN BUILDERS | P= | C | 08/04/2004 | | LEE | LEE | | P= | C | 2757718 |
WESTERN SUN BUILDERS | P= | P | 08/02/2004 | WATER TEMP AT LAVS EXCEED 110 DEGREES, NEED 1" AIR GAP ON T&P AT W/H PAN, CAULK MOP SINK RIM | LEE | LEE | | P= | P | 2757711 |
WESTERN SUN BUILDERS | PTO | C | 06/21/2004 | STILL NEED W/H & PAN DRAIN, CHECK AT FINAL | LEE | LEE | | PTO | C | 2757704 |
WESTERN SUN BUILDERS | PB | C | 06/07/2004 | EOL C/O BEHIND TOILETS | LEE | LEE | | PB | C | 2757696 |