ZAKCO COMMERCIAL CONSULTANTS | B= | C | 01/26/2005 | FIRE FINAL SIGNED OFF | SEANA | SEANA | | B= | C | 2878465 |
ZAKCO COMMERCIAL CONSULTANTS | B= | P | 01/21/2005 | NEED OUTHER FINALS / AND GLAS IN OFFICE DOOR /// REST OK | JIMA | JIMA | | B= | P | 2878457 |
ZAKCO COMMERCIAL CONSULTANTS | B= | R | 01/19/2005 | ADDRESS/TEMPERED GLASS AT OFFICE DOOR //OTHER FINAL,S NEEDED/FINISH EXTERIOR | FRANK | FRANK | | B= | R | 2878448 |
ZAKCO COMMERCIAL CONSULTANTS | BLA | C | 01/11/2005 | | FRANK | FRANK | | BLA | C | 2878441 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | C | 01/11/2005 | NEED TO ADD MORE CLIP,S AT INTERIOR COLUMN AREA FOR TOWER SIGN//NEED TO PATCH ROOF PLY IN DINING AREA ,,CEILING TILE,S TO BE REMOVED AT THESE AREA,S BY FINAL | FRANK | FRANK | | BFR | C | 2878433 |
ZAKCO COMMERCIAL CONSULTANTS | BSP | T | 01/10/2005 | PAID (REC#614715)ADDITIONAL PLAN REVIEW TIME: $50.000 FROM: ROGER REVISED STRUCTUAL | ROGER | ROGER | | BSP | T | 2878425 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | R | 01/07/2005 | RECALL BFR FOR 1-10-05 & WILL INSPECT MAIN STRUCTURE ROOF SYSTEM, & ROOF-TOP STRUCTURE W/ ITS TIE-IN W/ MAIN (COMPLETE DECK OPENING HEADERS, STRAPING ML'S, SOLID BLOCKING @ STL COLUMNS)./// CAN PROCEED W/ STUCCO BROWN COAT @ N,E,W,S EXT WALLS BUT NOT BEYOND SUPPORTING COLUMNS OF ROOF-TOP STRUCTURE/// CANNOT PROCEED W/ OTHER INSPECTIONS UNTIL FRAME IS CLEARED (REFER TO OTHER BFR COMMENTS) | SEANA | SEANA | | BFR | R | 2878416 |
ZAKCO COMMERCIAL CONSULTANTS | BLA | R | 01/05/2005 | MOISTURE BARRIER MUST BE OVER DRIP EDGE. | TIMS | TIMS | | BLA | R | 2878409 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | R | 01/05/2005 | INSPECTION CANCELLED IN FIELD STILL NEED ALL ENGINEERING LETTERS NO DOCUMENTATION ON SIGHT. | TIMS | TIMS | | BFR | R | 2878401 |
LENZ ELECTRIC, INC. | BSP | T | 01/04/2005 | PAID (REC#614714)ADDITIONAL PLAN REVIEW TIME: $50.000 From: MIKEC ADDITIONAL PLAN REVIEW | MIKEC | MIKEC | | BSP | T | 2878496 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | R | 01/03/2005 | NO INSPECTION--NOT READY | BLAINE | BLAINE | | BFR | R | 2878392 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | T | 12/29/2004 | PAID (REC#613288)SIGN TOWER STILL NOT READY/CANT SEE CONNECTION,S AT MICRO,S ROOF AND FLOOR/NEED APPROVED TRUSS DETAIL,S/VERIFY MICRO SIZES/CANT SEE FLOOR JOIST,S/ALL BOLT,S ARE LOOSE AND TO LONG/BLOCK PLYWOOD JOINT,S PER PLAN SPEC,S | FRANK | FRANK | | BFR | T | 2878385 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | R | 12/27/2004 | TOWER NOT READY AND CANNOT SEE CEILING | FRANK | FRANK | | BFR | R | 2878378 |
ZAKCO COMMERCIAL CONSULTANTS | BLA | R | 12/27/2004 | NOT READY | FRANK | FRANK | | BLA | R | 2878370 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | L | 12/18/2004 | NEED ENG. ON; 4' OF SHEAR PANEL ON PLANS -VS- 3'-2" OF ASBUILT SHEAR--4 TOP PLATES FOR 30LB LL-VS-3 TOP PLATES ASBUILT --2-2X6 KINGS & 2-2X6 JACKS BETWEEN HEADERS @ WEST WALL NORTH OF ENTRY-VS-1JACK 1KING ASBUILT, HEAD OFF ALL MECH OPENINGS @ ROOF DECK, NAIL OFF ALL CLIPS HANGERS HARDWARE @ CEILING, NEED DETAILS OF "SPECIAL JOISTS" IN CEILING FOR ROOF-TOP STRUCTURE (2 SETS OF 3ML), STILL NEED TO INSPECT ALL PARTITIONS -SOFFITS -ROOFTOP STRUCTURE & ITS TIE IN TO MAIN STRUCTURE | SEANA | SEANA | | BFR | L | 2878361 |
ZAKCO COMMERCIAL CONSULTANTS | BIN | P | 12/18/2004 | WALLS @ MAIN STRUCTURE R-19 OK, PROVIDE CALC SHEET & STICKERS (U-FACTOR) ON ALL GLAZING, STILL NEED TO INSPECT CEILING ETC. | SEANA | SEANA | | BIN | P | 2878353 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | R | 12/16/2004 | NEED TO PROVIDE SPECS ON "SPEACIAL JOIST" @ ROOF CONSTRUCTION (3-ML UNDER ROOF TOP STRUCTURE), ONLY DID FRAME INSP. ON EXTERIOR WALL MAIN STRUCTURE, NEED TO INSPECT ROOF TOP STRUCTURE & TIE IN W/ MAIN STRUCTURE--INTERIOR PARTITIONS--SOFFITS--ETC. | SEANA | SEANA | | BFR | R | 2878345 |
ZAKCO COMMERCIAL CONSULTANTS | BFR | R | 12/15/2004 | NEED ENG. ON; 4' OF SHEAR WALL ON PLANS -VS- 3'-2" OF ASBUILT SHEAR--4 TOP PLATES FOR 30 LB LL -VS- 3 ASBUILT--2-2X6 FULL HEIGHT KINGS & 2 2X6 JACKS BETWEEN HEADERS WEST WALL NORTH OF ENTRY, NEED 3-2X6 & HD20 HOLD DOWNS EACH END OF SHEAR PANELS NORTH WALL, MECH. ANCHOR ALL TOP PLATES WHERE INTERRUPDED BY HEADERS & WALLS, HEAD OFF ALL MECH OPENINGS @ ROOF DECK, ANCHOR BOTTOM PLATE @ STEEL WALL FRAMING, NAIL OFF ALL HANGERS CLIPS FASTNERS, FIRESTOP NORTH & SOUTH WALLS, CONT.... | SEANA | SEANA | | BFR | R | 2878337 |
ZAKCO COMMERCIAL CONSULTANTS | BFI | P | 11/18/2004 | OK UNDER SLAB INSULATION AT 18" AND INTERIOR PAD OK / | FRANK | FRANK | | BFI | P | 2878330 |
ZAKCO COMMERCIAL CONSULTANTS | BFI | P | 11/03/2004 | OK FROST INSULATION AT 36" NEED 1' FOR SLAB AREA/STILL NEED ENERGY CLAC,S/STILL NEED STAMPED FOUNDATION DETAIL,S BY ENGINEER NOT ARCHITECT | FRANK | FRANK | | BFI | P | 2878322 |
ZAKCO COMMERCIAL CONSULTANTS | BFN | C | 10/29/2004 | | BLAINE | BLAINE | | BFN | C | 2878290 |
ZAKCO COMMERCIAL CONSULTANTS | BFT | C | 10/29/2004 | | BLAINE | BLAINE | | BFT | C | 2878282 |
ZAKCO COMMERCIAL CONSULTANTS | BFN | L | 10/28/2004 | 6:37 | BLAINE | BLAINE | | BFN | L | 2878314 |
ZAKCO COMMERCIAL CONSULTANTS | BFN | R | 10/27/2004 | NOT READY | FRANK | FRANK | | BFN | R | 2878306 |
ZAKCO COMMERCIAL CONSULTANTS | BFT | P | 10/25/2004 | SEE APPROVED PLAN,S FOR AREA,S/NEED ENERGY HEAT CALC,S/NEED ENGINEER STAMP ON FOUNDATION DESIGN DETAIL,S | FRANK | FRANK | | BFT | P | 2878298 |
LENZ ELECTRIC, INC. | E= | C | 01/21/2005 | | DAVID | DAVID | | E= | C | 2878542 |
LENZ ELECTRIC, INC. | E= | P | 01/14/2005 | INTERIOR ONLY. | DAVID | DAVID | | E= | P | 2878489 |
LENZ ELECTRIC, INC. | ER | P | 01/11/2005 | CEILINGS ONLY! | DAVID | DAVID | | ER | P | 2878533 |
LENZ ELECTRIC, INC. | E= | R | 01/11/2005 | NOT READY. | DAVID | DAVID | | E= | R | 2878525 |
LENZ ELECTRIC, INC. | ES | C | 12/27/2004 | NEW SERVICE, 800 AMP 4/W U/G BY LENZ ELECTRIC, M.D.P. ONLY SUBS PANELS TO BE INSPECTED AT LATER DATE | GARY | GARY | | ES | C | 2878517 |
LENZ ELECTRIC, INC. | ER | P | 12/21/2004 | NORTH WALL BETWEEN TWO DRIVEUPS. ALSO SOFFET. | DAVID | DAVID | | ER | P | 2878510 |
LENZ ELECTRIC, INC. | ER | P | 12/14/2004 | WALLS ONLY. | DAVID | DAVID | | ER | P | 2878481 |
LENZ ELECTRIC, INC. | EUG | C | 11/24/2004 | | JOSEPH | JOSEPH | | EUG | C | 2878472 |
LENZ ELECTRIC, INC. | EUG | P | 11/18/2004 | SECONDARY'S FROM X-FMR TO BUILDING. OK! | DAVID | DAVID | | EUG | P | 2878504 |
STERLING MECHANICAL, INC. | H= | C | 01/26/2005 | BALANCE REPORT RECEIVED. | LYNNS | LYNNS | | H= | C | 2878274 |
CLIMATE TECHNOLOGY | H= | C | 01/21/2005 | | JACK | JACK | | H= | C | 2878207 |
CLIMATE TECHNOLOGY | HRP | C | 01/21/2005 | | JACK | JACK | | HRP | C | 2878199 |
STERLING MECHANICAL, INC. | H= | P | 01/06/2005 | PENDING RECEIPT OF BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 2878266 |
STERLING MECHANICAL, INC. | HV | C | 01/06/2005 | WATER HEATER VENT. | LYNNS | LYNNS | | HV | C | 2878257 |
TAYLOR SEPTIC AND PLUMBING | H= | C | 01/06/2005 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 2878558 |
STERLING MECHANICAL, INC. | HD | C | 01/05/2005 | GREASE DUCT WRAP AND ROUGH DUCT COMPLETE. | LYNNS | LYNNS | | HD | C | 2878249 |
STERLING MECHANICAL, INC. | HD | P | 01/03/2005 | GREASE DUCT OK TO WRAP. | LYNNS | LYNNS | | HD | P | 2878240 |
STERLING MECHANICAL, INC. | HD | P | 12/22/2004 | INSULATION COMPLETE. NEED TO SEE GREASE DUCTS. | LYNNS | LYNNS | | HD | P | 2878231 |
STERLING MECHANICAL, INC. | HC | C | 12/22/2004 | OK FOR METER. | LYNNS | LYNNS | | HC | C | 2878223 |
TAYLOR SEPTIC AND PLUMBING | HI | C | 12/17/2004 | 10# TEST AND DESIGN OK. | LYNNS | LYNNS | | HI | C | 2878549 |
STERLING MECHANICAL, INC. | HD | P | 12/06/2004 | NEED TO USE 181 TAPE, SEAL ALL S AND DRIVE JOINTS. | LYNNS | LYNNS | | HD | P | 2878215 |
TAYLOR SEPTIC AND PLUMBING | P= | C | 01/11/2005 | | JEFF | JEFF | | P= | C | 2878605 |
TAYLOR SEPTIC AND PLUMBING | P= | P | 01/07/2005 | PARTITIONS WOMENS REAT ROOM, 3 COMPARTMENT SINK DRAIN TO CODE, CROSS CONNECTION AT ICE MAKER, CROSS CONNECTION AT COKE MACHINE | JEFF | JEFF | | P= | P | 2878597 |
TAYLOR SEPTIC AND PLUMBING | PTO | C | 12/17/2004 | | JEFF | JEFF | | PTO | C | 2878589 |
TAYLOR SEPTIC AND PLUMBING | PTO | R | 12/16/2004 | DWV LOST TEST, TOILET CLEARANCES, ANCHOR FLANGES | JEFF | JEFF | | PTO | R | 2878581 |
TAYLOR SEPTIC AND PLUMBING | PTO | P | 12/15/2004 | TESTS, NEED SANTEE AT URINAL, TOILET CLEARANCES, NAIL PROTECTION | JEFF | JEFF | | PTO | P | 2878574 |
TAYLOR SEPTIC AND PLUMBING | PB | C | 11/16/2004 | | JEFF | JEFF | | PB | C | 2878565 |