J. E. DUNN CONSTRUCTION COMPANY | B= | C | 04/23/2007 | | DALE | DALE | | B= | C | 2926694 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 04/18/2007 | NEED ALL OTHER INSPECTIONS SIGNED OFF / SEPERATE PERMIT FOR MRI | DALE | DALE | | B= | P | 2926687 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 04/13/2007 | WALL FRAME AT MRI OK | DALE | DALE | | BSP | P | 2926678 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 04/04/2007 | SEAL ALL PENATRATION AT ELEV. AND STAIRWELL AT PENTHOUSE | DALE | DALE | | BSP | P | 2926670 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | C | 03/12/2007 | REC'D ENG LETTER 1/24 | BLAKE | BLAKE | | BFN | C | 2926665 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | C | 03/12/2007 | ENG LETTER REC'D 1/24 | BLAKE | BLAKE | | BFR | C | 2926656 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 03/02/2007 | NOT CEILING PENETRATIONS / PARTIAL FINAL FOR 4TH FLOOR OK | ANDY | ANDY | | BSP | P | 2926648 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/28/2007 | FIRE CAULK ON VERTICAL WALL OK AT 1340 | DALE | DALE | | BSP | P | 2926639 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 02/27/2007 | WALLS OK AT 1340, 1338, 1338A, 1336, 1334, 1334A, NEED ELECTRIC | DALE | DALE | | BFR | P | 2926632 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 02/27/2007 | 4TH FLOOR OK PENDING FIRE FINAL | DALE | DALE | | B= | P | 2926618 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/27/2007 | WALL PENATRATIONS OK AT 4177 | DALE | DALE | | BSP | P | 2926625 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/26/2007 | VERTICAL WALL FIRE CAULK AT 4908 OK | DALE | DALE | | BSP | P | 2926605 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 02/18/2007 | Temp CO: BSMT-PRELIM WALK THRU FOR CO | DAVEL | DAVEL | | B= | P | 2925398 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 02/14/2007 | 3RD FLOOR OK PENDING FIRE | DALE | DALE | | B= | P | 2926597 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/14/2007 | FIRE CAULK ON 4TH FLOOR AT 4176A, 4925, 4156, 4103 OK | DALE | DALE | | BSP | P | 2926589 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/13/2007 | VERTICAL WALLS ON 4TH FLOOR AT 4161, 4162, 4163, 4164, 4164B, 4165, 4166, 4167, 4168, 4169, 4172, 4173, 4174, 4175, 4148, 4924, 4922, 4923 OK | DALE | DALE | | BSP | P | 2926582 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/06/2007 | FIRE CAULK ON VERTICAL WALL 4TH FLOOR OK AT 4146, 4104, 4125, 4149, 4903, 4128, 4129, 4132, 4133, 4134, 4135, 4136, 4137, 4138, 4139, 4138B, 4143, 4144, 4155, 4907, 4906, 4905, 4142, 4126, 4154, 4102 | DALE | DALE | | BSP | P | 2926573 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/05/2007 | WALK-THRU | DALE | DALE | | BSP | P | 2926565 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/02/2007 | WALK-THRU | DALE | DALE | | BSP | P | 2926558 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 02/01/2007 | 4TH FLOOR VERTICAL WALL, FIRE CAULK OK AT 4102, 4921, 4918, 4902 | DALE | DALE | | BSP | P | 2926551 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/31/2007 | 2ND FLOOR PENDING FIRE / ROOM 2101 ABOVE CEILING OK / SMOKE SEAL AT 2ND FLOOR BY NORTH ELEVATORS OK OND 1ST FLOOR CORRIDOR BY ELEAVATOR LOBBY OK | DALE | DALE | | B= | P | 2926543 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/30/2007 | WALK-THRU | DALE | DALE | | B= | P | 2926531 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/29/2007 | NEED ITEM 3 AND 4 FROM PREVIOUS INSPECTION ON 2ND FLOOR | DALE | DALE | | B= | P | 2926289 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/26/2007 | 2ND FLOOR WALK-THRU FOR CO- 1-NEED DOOR LANDINGS AT SOUTH EXTERIOR BREAK ROOM 2-NEED SMOKE BARRIER BETWEEN PANES OF GLASS AT CORRIDOR 3-FIRE CAULK 4 INCH DIAMETER PENETRATION ABOVE EAST SIDE CEILI9NG 4-NEED SMOKE GASKETS AT ALL ELEVATOR LOBBY DOORS | BLAKE | BLAKE | | B= | P | 2926282 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/25/2007 | FIRE CAULKING OK VERTICAL WALL 3RD FLOOR- 3908, 3917, 3925 | BLAKE | BLAKE | | B= | P | 2926272 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/23/2007 | VERTICAL WALL FIRE CAULKING OK 2ND FLOOR- 2908, 2917, 2925 AND WALK THRU FOR PRELIM 2ND FLOOR CO | BLAKE | BLAKE | | B= | P | 2926264 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/23/2007 | TCO FOR 1ST FLOOR, EXCLUDING RADIOLOGY & ZEN GARDEN | MINDY | MINDY | | B= | P | 2926258 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/19/2007 | VERTICAL WALL FIRE WALL FIRE CAULKING OK 3RD FLOOR- 3156, 3177 | BLAKE | BLAKE | | BSP | P | 2926251 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/18/2007 | PARTIAL- BSMT AND 1ST FLOOR OK PENDING FIRE FINAL INSPECTION | BLAKE | BLAKE | | B= | P | 2926245 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/18/2007 | VERTICAL WALL FIRE CAULKING OK 3RD FLOOR- 3153, 3902, 3149 | BLAKE | BLAKE | | BSP | P | 2926238 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/17/2007 | PRELIM WALK-THRU FOR 1ST FLOOR TCO | BLAKE | BLAKE | | B= | P | 2926232 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/17/2007 | VERTICAL WALL FIRE CAULKING OK 3RD FLOOR- 3148, 3154, 3126 | BLAKE | BLAKE | | BSP | P | 2926226 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/16/2007 | PRELIM WALK-THRU FOR 1ST FLOOR | BLAKE | BLAKE | | B= | P | 2926220 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/16/2007 | VERTICAL WALL FIRE CAULKING OK 2ND FLOOR- 2154 AND 2101 | BLAKE | BLAKE | | BSP | P | 2926212 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/12/2007 | VERTRICAL WALL FIRE CAULKING OK 3RD FLOOR ROOM 3102 | BLAKE | BLAKE | | BSP | P | 2926199 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/12/2007 | PRELIM WALK-THRU ON BSMT TCO | BLAKE | BLAKE | | B= | P | 2926192 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/11/2007 | CONSULTATION RE: PRE-LIM WALK-THRU FOR CO/ ALSO VERTICAL WALL FIRE CAULKING OK FOR 3RD FLOOR- 3146, 3104, 3125, 3103, 3921 | BLAKE | BLAKE | | B= | P | 2926185 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/10/2007 | PRELIM WALK-THRU FOR BSMT TCO | BLAKE | BLAKE | | B= | P | 2926178 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 01/10/2007 | VERTICAL WALL FIRE CAULKING OK: 3RD FLOOR-3903, 3909, 3918 4TH FLOOR-4106, 4107, 4108, 4109, 4112, 4113, 4114, 4115, 4116, 4117A, 4121, 4122, 4123, 4153, 4909, 4915, 4914, 4916, 4117, 4118 | BLAKE | BLAKE | | BSP | P | 2926171 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/08/2007 | | CHRISM | CHRISM | | B= | P | 2926161 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/04/2007 | CONSULTATION RE: BSMT CO | BLAKE | BLAKE | | B= | P | 2926153 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 01/03/2007 | BSMT-PRELIM WALK THRU FOR CO | BLAKE | BLAKE | | B= | P | 2926145 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 12/27/2006 | VERTICAL WALL FIRE-CAULKING OK: 1ST FLOOR-1425, 1434, 1435 3RD FLOOR- 3106, 3107, 3108, 31098, 3112, 3113, 3114, 3115, 3116, 3117B, 3121, 3122, 3123, 3914, 3915, 3117, 3118 | BLAKE | BLAKE | | BSP | P | 2926138 |
J. E. DUNN CONSTRUCTION COMPANY | BLA | P | 12/19/2006 | 1ST FLOOR SE CORNER ENTRY SOFFIT AT "ZEN GARDEN" | BLAKE | BLAKE | | BLA | P | 2926130 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 12/19/2006 | 1ST FLOOR VERTICAL WALL FIRE CAULKING OK 1324, 1346, 1337, 1337A, 1328B, 1333 | BLAKE | BLAKE | | BSP | P | 2926123 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 12/13/2006 | FIRE WALL AT B943 OK | ANDY | ANDY | | BSP | P | 2926115 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 12/11/2006 | ALL PENETRATIONS NOT SEALED | ANDY | ANDY | | BSP | R | 2926106 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 12/06/2006 | VERTICAL WALL FIRE CAULKING OK 3RD FLOOR: 3139B, 3128, 3907, 3139, 3906, 3905, 3175, 3174, 3173, 3172, 3169, 3167, 3168, 3166, 3165, 3164B, 3162, 3161, 3924, 3164, 3163 | BLAKE | BLAKE | | BFR | P | 2926099 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 12/06/2006 | VERTICAL WALL FIRE CAULKING OK BSMT: B914, B910, B946, B310, B313A, B802, B114, B306, B945, B125, B126, B102, B762, B605, B687, B513, B942 ALL BSMT FIRE CAULKING OK EXCEPT FOR MAINTENANCE | BLAKE | BLAKE | | BSP | P | 2926091 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 12/04/2006 | VERTICAL WALL FIRE CAULKING OK 3RD FLOOR: 3129, 3132, 3133, 3134, 3135, 3136, 3137, 3138, 3143, 3144, 3145 | BLAKE | BLAKE | | BSP | P | 2926082 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/30/2006 | WET FLOOR, COULD NOT DO INSPECTION | BLAKE | BLAKE | | BSP | P | 2926075 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/13/2006 | VERTICAL WALL FIRE CAULKING OK: BSMT LEVEL B124, B123, B108 | BLAKE | BLAKE | | BSP | P | 2926067 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/08/2006 | VERTICAL WALL FIRE CAULKING OK: 1ST FLOOR-1321A, 1908 STAIRWELL, 1903 AT ELEVATOR, 1928, 1504A, 1504, 1504B, 1925 STAIRWELL, 1103, 1951, 1955, 1917 2ND FLOOR- 2206 CORRIDOR, 2134, 3133, 2205, 2203, 2202, 2150 5TH FLOOR PENTHOUSE-CURTAIN WALL AT NORTH ELEV LOBBY | BLAKE | BLAKE | | BSP | P | 2926058 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/03/2006 | VERTICAL WALL FIRE CAULKING OK: 2ND FLOOR- 2151, 2153, 2156, 2158, 2157, 2148 4TH FLOOR-STAIRWAY 4917 | BLAKE | BLAKE | | BSP | P | 2926051 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 11/01/2006 | VERTICAL WALL FIRE CAULKING OK: 1ST FLOOR- CORRIDOR 1936, 1970, 1136, 1502A, 1902, 1921 2ND FLOOR- 2902, CORRIDOR 2903, 2921 | BLAKE | BLAKE | | BSP | P | 2926043 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/31/2006 | VERTICAL WALL FIRE CAULKING OK: 1ST FLOOR-1302, 1971, 1972, 1502C, CORRIDOR 1903 EAST, 1419, 1411 2ND FLOOR-2103, 2119, 2113, 2118, 2132, 2129, 2135, 2136, 2137, 2142, 2143, 2144C, 2144A, 2145, CORRIDORS 2905, 2906, 2907 | BLAKE | BLAKE | | BSP | P | 2926035 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/25/2006 | VERTICAL WALL FIRE CAULKING OK 1ST FLOOR: 1322, 1325, 1317, 1313, 1309A, 1312, 1343, 1345, 1304, CORRIDORS 1914A AND 1914, 1342B, 1617, 1429, 1432, 1440 | BLAKE | BLAKE | | BSP | P | 2926026 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/24/2006 | VERTICAL WALL FIRE CAULKING OK: 1ST FLOOR-1342, 1352A, 1352C, 1618, 1421, 1342E, 1352, 1906 2ND FLOOR-2152, 2147, 2149, 2124, 2125A, 2125A, 2125B, 2125C, 2126, 2122, 2122A, 2117A, 2117B, 2115, 2114, 2113, 2112, 2109, 2108, CORRIDORS: 2914, 2915, 2916 | BLAKE | BLAKE | | BSP | P | 2926019 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/19/2006 | VERTICAL WALL FIRE CAULKING OK: 1ST FLOOR-1323, 1321, 1913 CORRIDOR, 1315, 1309, 1316, 1318, 1348, 1410, 1904 CORRIDOR, 1927 CORRIDOR, 1423, 1430, 1937B, 1225 2ND FLOOR- WEST POD CORRIDOR 2141, TRIAGE CORRIDOR 2909 | BLAKE | BLAKE | | BSP | P | 2926012 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/17/2006 | VERTICAL WALL FIRE CAULKING OK 3RD FLOOR- ROOM 3157 | BLAKE | BLAKE | | BSP | P | 2926003 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/16/2006 | VERTICAL WALL FIRE CAULKING OK 1ST FLOOR: 1428, CORRIDOR 1923, 1466A, 1472A, 1404, 1472C, 1919, 1918, 1916, 1926, 1424, 1918A, 1615, 1907, 1342A, 1342C, 1342G, 1342F, 1342D, 1352B, 1347, 1349, 1308, 1306, 1912, 1305, 1303 | BLAKE | BLAKE | | BSP | P | 2925996 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/12/2006 | VERTICAL WALL FIRE CAULKING OK 1ST FLOOR: 1327, 1416, 1610, 1610, 1458, CORRIDOR 1924, 1456 | BLAKE | BLAKE | | BSP | P | 2925987 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/11/2006 | FIRE CAULKING OK: 4TH FLOOR- ELEVATOR LOBBY 4102 EXT CURTAIN WALL FLOOR PENETRATION, EAST AND WEST EXT CURTAIN WALL 3RD FLOOR-3902 ELEVATOR LOBBY EXT CURTAIN WALL, EAST AND WEST CORRIDOR EXT CURTAIN WALL | BLAKE | BLAKE | | BSP | P | 2925979 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/10/2006 | VERTICAL WALL FIRE CAULKING OK AT 4TH FLOOR UNITS 4120, 4147, CORRIDOR 4922, AND 4157 | BLAKE | BLAKE | | BSP | P | 2925972 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/06/2006 | VERTICAL WALL FIRE CAULKING OK: BSMT-B906 CORRIDOR,B132/104 1ST FLOOR- 1118, STAIR 1A AKA 1943, 1130 | BLAKE | BLAKE | | BSP | P | 2925964 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/05/2006 | VERTICAL WALL FIRE CAULKING OK: BSMT- EAST SIDE OK OF 906 CORRIDOR, B302, B904, B748, B749, B754, B804, B803 1ST FLOOR-1 HR LID AT NW CORNER OF CORRIDOR 1937B, ELEV LOBBY 1942, 1962, 1454 | BLAKE | BLAKE | | BSP | P | 2925956 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/03/2006 | 1ST FLOOR- VERTICAL WALL FIRE CAULKING OK: 1601, 1602, 1603, 1605, 1452, 1606, 1608, 1609, 1611, 1612, 1403, 1413 | BLAKE | BLAKE | | BSP | P | 2925946 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 10/03/2006 | 2ND FLOOR- CANCELED IN FIELD | BLAKE | BLAKE | | BSP | R | 2925939 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/26/2006 | VERTICAL WALL FIRE CAULKING OK 3RD FLOOR- 3176A AND 4TH FLOOR- 4176 | BLAKE | BLAKE | | BSP | P | 2925931 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/25/2006 | VERTICAL WALL FIRE CAULKING OK: 3RD-3176 4TH-4145A, 4127, 4152, 4174A, 4102, 4105, 4124 | BLAKE | BLAKE | | BSP | P | 2925924 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/20/2006 | VERTICAL WALL FIRE CAULKING OK: BSMT-B915, B912, B318, B317, B217B, CORRIDOR B913, B326, B686, CORRIDOR 926, | BLAKE | BLAKE | | BSP | P | 2925915 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/15/2006 | VERTICAL WALL FIRE CAULKING OK 4TH FLOOR: ROOMS- 4128A,4129A, 4132A, 4133A, 4134A, 4135A, 4136A, 4137A, 4138A, 4143A, 4144A, 4905, 4902, 4161A, 4162A, 4165A, 4166A, 4167A, 4169A, 4172A, 4173A, 4175A, 4176A | BLAKE | BLAKE | | BSP | P | 2925907 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/11/2006 | VERTICAL WALL FIRE CAULKING OK: 1ST FLOOR- 1929, 1937, 1122, 1931, 1117, 1205, 1207, 1209B,1208, 1206, 1203,1937A 4TH FLOOR- 4914, 4106, 4107, 4108, 4109, 4112, 4113, 4114, 4115, 4116, 4121, 4122, 4123 | BLAKE | BLAKE | | BSP | P | 2925899 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/07/2006 | VERTICAL WALL FIRE CAULKING OK: BSMT-B685, B922, B924, B925 AND ALL CORRIDOR OUTSIDE OR EXCEPT 1 AREA AT EAST CORRIDOR 1ST-1215, 1215A, B, C, AND D, 1214, 1214A THRU H, 1217, 1935 CORRIDOR, 1202, 1212, 1220, 1222, 1225, 1229, 1934, 1216, 1939 2ND-2161 3RD-3152, 3124 | BLAKE | BLAKE | | BSP | P | 2925891 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/05/2006 | VERTICAL WALL FIRE CAULKING OK 2ND FLOOR- ROOM 2159 3RD FLOOR-3145 | BLAKE | BLAKE | | BSP | P | 2925883 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 09/01/2006 | VERTICAL WALL FIRE CAULKING OK AT BSMT: B633, 921, B602, B933 | BLAKE | BLAKE | | BSP | P | 2925877 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/30/2006 | VERTICAL WALL FIRE CAULKING OK: BSMT-B710, B707, B684, B676, B774B, B902, B674, B682, B685B, 3RD FLOOR-3127, 3102, 3105, 3112A, 3113A | BLAKE | BLAKE | | BSP | P | 2925868 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/24/2006 | VERTICAL WALL FIRE CAULKING OK ROOMS: BSMT-B675 2ND FLOOR-2160 3RD FLOOR- 3120, 3147, 3161A, 3162A, 3165A, 3166A, 3167A, 3168A, 3169A, 3172A, 3173A, 3174A, 3175A | BLAKE | BLAKE | | BSP | P | 2925860 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/22/2006 | VRETICAL WALL FIRE CAULKING OK 3RD FLOOR ROOMS:3106A, 3107A, 3108A,3109A, 3114A, 3115A, 3116A, 3121A, 3122A, 3123A, 3905A, 3128A, 3132A, 3133A, 3134A, 3135A, 3136A, 3137A, 3138A, 3143A, 3144A, 3922A, 3129A | BLAKE | BLAKE | | BSP | P | 2925856 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/18/2006 | BSMT- FIRE CAULKING OK VERTICAL WALLS AT ROOMS 673, 662,665 | BLAKE | BLAKE | | BSP | P | 2925848 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/17/2006 | FIRE CAULK OK ABOVE HARD LID AT 3RD FLOOR 3914A | BLAKE | BLAKE | | BSP | P | 2925840 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/16/2006 | FIRE CAULKING OK AT 1ST FLOOR 1933 EAST CORRIDOR CURTAIN WALL/ ALSO AT CENTRAL UTILITY PLANT PENDING MECHANICAL FIRE DAMPER INSPECTION | BLAKE | BLAKE | | BSP | P | 2925832 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/14/2006 | VERTICAL FIRE CAULKING OK: BSMT-OR ROOMS B668, B664, AND CORRIDOR B669 AND SECOND FLOOR-2148A | BLAKE | BLAKE | | BSP | P | 2925824 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 08/14/2006 | PAID (REC#710925)ADDITIONAL PLAN REVIEW TIME: $50.000 From: TIMC Revised architectural sheets. | TIMC | TIMC | | BSP | T | 2925816 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/11/2006 | VERTICAL WALL FIRE CAULKING OK CORRIDOR 2923 AND ROOM 2135 OK | BLAKE | BLAKE | | BSP | P | 2925808 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 08/11/2006 | 4TH FLOOR INSULATION OK | BLAKE | BLAKE | | BIN | P | 2925800 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/10/2006 | VERTICAL WALL FLOOR CAULKING OK: 1ST FLOOR- STAIRWELL 1B 2ND FLOOR-ROOM 2147, HARD LID AT NE "ART NICHE" AND ROOM 2133A | BLAKE | BLAKE | | BSP | P | 2925793 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/02/2006 | FIRE CAULKING OK VERTICAL WALL: BSMT ROOMS 403, 402, 705, 706, 718, 637, 642, 630, 631,721, 712 1ST FLOOR 1340A 2ND FLOOR 2123, 2156C, 2127, 2204, 2155 4TH FLOOR FLOOR PENETRATIONS OK EXCEPT CURTAIN WALL | BLAKE | BLAKE | | BSP | P | 2925785 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 08/01/2006 | NO FOREMAN ON SITE | ANDY | ANDY | | BSP | R | 2925777 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 07/31/2006 | NO FOREMAN ON SITE / WHAT FLOOR | ANDY | ANDY | | BSP | R | 2925769 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/26/2006 | 2ND FLOOR- FIRE CAULKING OF ABOVE CEILING PENETRATIONS OK FOR HARD LID AREAS: NW AND SW CORRIDOR INTERSECTIONS | BLAKE | BLAKE | | BSP | P | 2925760 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/24/2006 | ABOVE CEILING PENETRATIONS OK BSMT ROOMS 634,638, 639, 626, 627, 625,624A, 622, 619,617 AND 624 AND ALSO 1ST FLOOR ROOMS 1407B,1402, AND 1614 | BLAKE | BLAKE | | BSP | P | 2925752 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/18/2006 | VERTICAL WALL FIRE CAULKING OK FOR 2ND FLOOR ROOMS 2138A, 2138, 2139, 2139A, 2143A, 2137A AND 1ST FLOOR ROOMS 1329, 1326, 1319, 1314, 1313A, 1344, 1335 | BLAKE | BLAKE | | BSP | P | 2925746 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/17/2006 | VERTICAL WALL FIRE CAULKING FOR PENETRATIONS OK FOR BSMT ROOMS 202, 215, 214, 212, 313, 314 | BLAKE | BLAKE | | BSP | P | 2925740 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/13/2006 | FIRE CAULKING FOR VERTICAL PENETRATIONS OK ROOMS 2107A AND 2107 PENDING ANY DAMPER INSPECTION | BLAKE | BLAKE | | BSP | P | 2925725 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/12/2006 | 3RD FLOOR EXTERIOR WALL INSULATION OK | BLAKE | BLAKE | | BSP | P | 2925717 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/12/2006 | FIRE CAULKING FOR HARD LIDS OK SOUTH STAIRWELL, ROOMS 2109A, 2114A, 2105 | BLAKE | BLAKE | | BSP | P | 2925711 |
J. E. DUNN CONSTRUCTION COMPANY | BLA | P | 07/10/2006 | LOADING DOCK AREA OK | BLAKE | BLAKE | | BLA | P | 2925704 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 07/10/2006 | VERTICAL FIRECAULK ABOVE CEILING OK ROOMS 1422, 1425, 1326, 1407A, 1407B,1616, 1102, 1503 | BLAKE | BLAKE | | BSP | P | 2925697 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 07/10/2006 | SHAFT WALL-NOT READY | BLAKE | BLAKE | | BSP | R | 2925689 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | R | 07/05/2006 | 3RD FLOOR- NEED THRU-PENETRATION FIRESTOP AT WEST STAIRWELL | BLAKE | BLAKE | | BFR | R | 2925683 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 06/29/2006 | PARTIAL FRAME- SEE PLANS-OK TO ROCK HARD LIDS MAIN LOBBY/ATRIUM, ROOM 1929, RECEPTION AREA, 8 "EGGS', 1301, 1011, CORRIDOR 1933 | BLAKE | BLAKE | | BSP | P | 2925677 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 06/27/2006 | 2ND FLOOR INSULATION OKI | BLAKE | BLAKE | | BIN | P | 2925671 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 06/16/2006 | 1ST FLOOR-EAST FACE OF SOUTH POD OK | BLAKE | BLAKE | | BIN | P | 2925664 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 06/16/2006 | ENTRY ATRIUM AND EAST MAIN LOBBY CEILING OK TO DRYWALL PENDING OTHER TRADES | BLAKE | BLAKE | | BFR | P | 2925657 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 06/15/2006 | 1ST FLOOR- NE OK, STILL NEED EAST FACE OF SOUTH POD/ 2ND FLOOR-ALL OK EXCEPT EAST FACE BETWEEN STAIR 2 AND STAIR 4 | BLAKE | BLAKE | | BIN | P | 2925650 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 06/12/2006 | PARTIAL 2ND FLOOR- SEE PLANS AND JOSH | BLAKE | BLAKE | | BIN | P | 2925389 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | R | 06/11/2006 | BOTTOM TRACK AND STRAPS FOR EXTERIOR WALL OK / NEED TO SEAL FLOOR PENETRATIONS | ANDY | ANDY | | BFR | R | 2925643 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | R | 06/02/2006 | MISSING STRAPS ON EXTERIOR STUDS / MANY 2ND TO 3RD FLOOR PENETRATIONS / CLEAN OUT BOTTOM TRACK TO SEE SHOTS | ANDY | ANDY | | BFR | R | 2925635 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 06/02/2006 | FIRE CAULK FOR B677, B678, B679 OK | ANDY | ANDY | | BSP | P | 2925626 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 06/01/2006 | NOT READY | ANDY | ANDY | | BSP | R | 2925617 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 05/25/2006 | BSMT SOUTH HALF AND PENTHOUSE OK | BLAKE | BLAKE | | BFR | P | 2925610 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 05/25/2006 | ATRIUM AND PENTHOUSE OK | BLAKE | BLAKE | | BIN | P | 2925601 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 05/23/2006 | 1ST FLOOR- SMOKE AND 1-HOUR WALLS OK TO INSTALL CEILING AT ROOMS 1123, 1124, 1227, 1231, 1940,1201, 1938, 1941 2ND FLOOR-IN WALL FLOOR-CEILING PENETRATIONS FIRE CAULKING OK | BLAKE | BLAKE | | BSP | P | 2925593 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 05/02/2006 | FIRE CAULKING-THRU-PENETRATION FIRESTOP OK FOR 1ST LEVEL SOUTH HALF, RECEIVED UL NOTEBOOK FULL OF CUT SHEETS | BLAKE | BLAKE | | BSP | P | 2925585 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 05/01/2006 | 1ST LEVEL SOUTH HALF WALLS OK | BLAKE | BLAKE | | BFR | P | 2925578 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 05/01/2006 | FIRE CAULKING OK BSMT LEVEL ROOMS B329, B312, B112 AND B762A ALSO FIRE CAULKING FOR FLOORS OK 1ST LEVEL NORTH HALF | BLAKE | BLAKE | | BSP | P | 2925568 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | R | 04/27/2006 | FIRE CAULKING- NEMEROUS PENETRATIONS NOT DONE/ NEED UL SHEETS FOR ALL PENETRATIONS | BLAKE | BLAKE | | BSP | R | 2925560 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 04/19/2006 | PARTIAL- 1ST LEVEL-NORTH, NORTHWEST AND SOUTH WEST EXT WALLS OK | BLAKE | BLAKE | | BIN | P | 2925552 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 03/28/2006 | PARTIAL- FIRECAULKING- SEE SHEET LS.BO- ROOM B308 OK FOR FIRE RATING/ ROOMS B315, B708, B675A, B676A, B131, B130, B629, B606 OK FOR "SMOKE WALL" ALL OK TO INSTALL HARD LID PENDING RECEIPT OF UL THROUGH-PENETRATION FIRESTOP CUT SHEETS | BLAKE | BLAKE | | BSP | P | 2925545 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 03/14/2006 | FIRST LEVEL FRAMING AREAS G,K,J - CLOUDED ON RBD SET - OK TO ROCK / CK SEALS IN SMOKE BARRIERS AND FIRE WALLS PRIOR TO CEILINGS / CK HVAC SUPPLY PENETRATION THROUGH FIRE WALLS FOR DAMPERING | MICHAELA | MICHAELA | | BFR | P | 2925537 |
J. E. DUNN CONSTRUCTION COMPANY | BIN | P | 01/26/2006 | BASEMENT PCU, SOUTH FOUNDATION WALL OK | RICH | RICH | | BIN | P | 2925530 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 01/20/2006 | BASEMENT PATIENT CARE UNITS, SOUTH OF EXSPANSION JOINT, AREA A,B,C, WALLS OK, RECALL PENETRATIONS AT RATED WALLS PRIOR TO LID | RICH | RICH | | BFR | P | 2925522 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 12/28/2005 | BASEMENT WALLS, WALK THRU, CONSULT DIFFERENCE FOR RATED WALLS AND SMOKE BARRIER WALLS, RECALL , OTHER ROUGHS REQUIRED | RICH | RICH | | BFR | P | 2925514 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 07/26/2005 | PAID (REC#659176)ADDITIONAL PLAN REVIEW TIME: $50.000 FROM: KYE, REVISED UNDERSLAB TO INCLUDE KITCHEN AREA. | KYE | KYE | | BSP | T | 2925491 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 06/15/2005 | PAID (REC#659175)ADDITIONAL PLAN REVIEW TIME: $50.000 FROM: BOB REVISED UNDERGROUND DWV FOR CENTRAL PLANT | BOB | BOB | | BSP | T | 2925483 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | P | 06/01/2005 | NORTH STRUCTURAL FLOOR OF "CUP" OK, ENGINEERS OBSEVATION LETTERS ON FILE, STARTING 1ST LEVEL STRUCTURAL FLORR NORTH | RICH | RICH | | BFN | P | 2925474 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 05/04/2005 | STRUCTURAL SLAB AT "CUP", SOUTH/ EAST HALF | RICH | RICH | | BSP | P | 2925467 |
J. E. DUNN CONSTRUCTION COMPANY | BFD | P | 04/28/2005 | 4 INTERIOR LATERALS, REAR HIGH WALL DRAIN BOARD SOUTH EAST, STARTED HIGH POINT REAR N/W | RICH | RICH | | BFD | P | 2925459 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 04/26/2005 | PAID (REC#634618)ADDITIONAL PLAN REVIEW TIME: $50.000 From: SEAN Added perimeter drain plan | SEAN | SEAN | | BSP | T | 2925451 |
J. E. DUNN CONSTRUCTION COMPANY | BFD | P | 04/22/2005 | NORTH PATIENT TOWER REAR HIGH WALL, WORKING LOW TO HIGH POINT, WITH RIGID AND DRAIN BOARD, OK , S/E SIDE RECALL AGAIN AT N/E SIDE HIGH TO LOW | RICH | RICH | | BFD | P | 2925442 |
J. E. DUNN CONSTRUCTION COMPANY | BFI | P | 04/20/2005 | NORTH PATIENT TOWER AREA SOUHT WALK PERIMETER, RIGID WITH DRAIN BOARD, RECALL REAR HIGH WALL DRAIN BOARD AND INTERIOR UNDER SLAB DRAIN, PROVIDE RBD FIELD PICK BIN AT SUPERVISEROR OFFICE , FOR FIELD INSPECTION HISTORY FILING | RICH | RICH | | BFI | P | 2925434 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 01/27/2005 | SOUTHWEST WALL OF UTILITY BLDG OK | BLAKE | BLAKE | | BFT | P | 2925426 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | R | 01/24/2005 | CANCELED PER CURTIS | RICH | RICH | | BFT | R | 2925420 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 01/20/2005 | FOOTER AT SOUTH RETAINING AND DECK SUPPORT , SEE SHEET S1.03, CTL PRE INSPECTION APPROVED , PER ROLF PHILIPSEN | RICH | RICH | | BFT | P | 2925412 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | P | 01/18/2005 | ROLF APPROVED CTL THOMPSON PENDING LETTER | BEV | BEV | | BFN | P | 2925405 |
KENNY ELECTRIC SERVICE, INC. | E= | C | 04/23/2007 | ALL THIS PERMIT, ADDITIONAL PERMITS G14227 AND G23066 PULLED TO COMPLETE PROJECT | GARY | GARY | | E= | C | 2925381 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 04/17/2007 | 2 OPEN PERMITS OPEN --CANNOT CLOSE PERMIT---CALL JERRY MILLER WITH PERMIT NUMBERS | THOMAS | THOMAS | | ER | P | 2925375 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 04/04/2007 | WAITING FOR NEW PERMITS TO BE ABLE TO CLOSE THIS ONE, CANOPY AND MRI AREA | GARY | GARY | | E= | P | 2925367 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 03/21/2007 | SEE PRINTS THIS DATE | GARY | GARY | | E= | P | 2925360 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 03/15/2007 | NORTH EAST CANOPY | THOMAS | THOMAS | | ER | P | 2925353 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 03/06/2007 | CT ROOM SOFFITTS, NORH ENTERANCE COVER LIGHTING CONDUIT ON TOP | GARY | GARY | | ER | P | 2925345 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 03/01/2007 | FOURTH FOOR NORTH POD, FIRST FLOOR CT ROOM WALLS, BASEMENT NORTH MECH ROOM | GARY | GARY | | E= | P | 2925339 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 02/21/2007 | THIRD FLOOR, FOURTH FLOOR LESS NORTH POD | GARY | GARY | | E= | P | 2925333 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 02/16/2007 | TO MUCH STUFF MISSING, RECALL WHEN ALL PARTS COME IN | GARY | GARY | | E= | R | 2925324 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 02/14/2007 | KITCHEN, FOURTH FLOOR CEILINGS | GARY | GARY | | ER | P | 2925317 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 02/13/2007 | CHECK 3/W, NEED PANEL SCHEDULES AND PANEL LABELS | GARY | GARY | | E= | P | 2925309 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 02/07/2007 | SECOND FLOOR FINAL, FOURTH FLOOR ABOVE CEILING, SEE PRINTS THIS DATE | GARY | GARY | | E= | P | 2925301 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 01/30/2007 | NO ONE AT TRAILER, PLEASE RESCHEDULE | GARY | GARY | | E= | R | 2925293 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 01/29/2007 | NOT READY | GARY | GARY | | E= | R | 2925285 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 01/18/2007 | FORTH FLOOR CEILINGS, SEE PRINTS THIS DATE | GARY | GARY | | E= | P | 2925276 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/18/2007 | CEILINGS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925268 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 01/18/2007 | FIRST FLOOR LESS RADIOLOGY AREA | GARY | GARY | | E= | P | 2925261 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/17/2007 | SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925252 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 01/16/2007 | NO ONE AROUND, PLEASE RESCHEDULE | GARY | GARY | | E= | R | 2925245 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/12/2007 | PANELS AND CEILINGS THIRD FLOOR, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925238 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/10/2007 | THIRD AND FOURTH FLOOR CEILINGS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925230 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 01/09/2007 | SOUTH HALF OF FIRST FLOOR | GARY | GARY | | E= | P | 2925221 |
KENNY ELECTRIC SERVICE, INC. | ER | R | 01/09/2007 | NOT READY | GARY | GARY | | ER | R | 2925213 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 12/22/2006 | CEILINGS SOUTH POD CORRIDOR AND 12 PATIENT ROOMS EXCEPT FOR NURSES STATION CEILING-NOT READY NOTE! LUPE # 303-944- 1564 | GARYL | GARYL | | ER | P | 2925205 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 12/19/2006 | WALLS FIRST FLOOR | GARY | GARY | | ER | P | 2925198 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 12/13/2006 | FIRST FLOOR NORTH, KITCHEN CEILINGS BASEMENT | GARY | GARY | | ER | P | 2925189 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 12/12/2006 | | GARY | GARY | | E= | R | 2925180 |
KENNY ELECTRIC SERVICE, INC. | ER | R | 12/12/2006 | 2X4 FIXTURES MEED SCREWED TO GRID | GARY | GARY | | ER | R | 2925173 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 12/07/2006 | OFFICES, E4.1BA | THOMAS | THOMAS | | E= | P | 2924662 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 12/07/2006 | HARDLIDS, ZEN GARDEN | THOMAS | THOMAS | | ER | P | 2924654 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 12/06/2006 | LAB E4.1BA [EXCLUDING DEFECTIVE GFCI]-----DIETARY E4.1BA | THOMAS | THOMAS | | E= | P | 2925164 |
KENNY ELECTRIC SERVICE, INC. | ER | R | 12/06/2006 | NOT READY | THOMAS | THOMAS | | ER | R | 2925155 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 12/05/2006 | MEN AND WOMEN LOCKER ROOMS, STAFF ROOM, DECONTAMATION ROOM, I. T. OFFICES, HALL WAYS, SEE PRINTS THIS DATE | GARY | GARY | | E= | P | 2925147 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 12/04/2006 | PRE OPP, PACU, PRE WAITING, OBS ROOMS, SEE PRINTS THIS DATE | GARY | GARY | | E= | P | 2925141 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 12/01/2006 | THIRD FLOOR ABOVE DROP CEILING, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925135 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 11/27/2006 | NEED OUTLETS LABELED | GARY | GARY | | ER | P | 2925127 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 11/21/2006 | SEE ROUGH | GARY | GARY | | E= | R | 2925119 |
KENNY ELECTRIC SERVICE, INC. | ER | R | 11/21/2006 | POWER OUTAGE, WILL RESCHEDULE FOR MONDAY | GARY | GARY | | ER | R | 2925112 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 11/03/2006 | BASEMENT AREA A/C UNITS FOR UNDER FLOOR, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925105 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 11/03/2006 | BASEMENT AREA, SEE PRINTS THIS DATE | GARY | GARY | | E= | P | 2925097 |
KENNY ELECTRIC SERVICE, INC. | ES | P | 11/03/2006 | COMMERCIAL SERVICE: PANELS BASEMENT ELECTRC ROOM, SEE PRINTS THIS DATE | GARY | GARY | | ES | P | 2925089 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/31/2006 | SECOND FLOOR ABOVE DROP CEILING, | GARY | GARY | | ER | P | 2925082 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/24/2006 | BASEMENT PANELS MAIN ELECTRIC ROOM AND FIRST FLOOR ABOVE DROP CEILING SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925074 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/18/2006 | ABOVE DROP CEILING FIRST FLOOR, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925066 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/12/2006 | FIRST FLOOR RADIOLOGY WALLS, ROOF TOP UNDERGROUND WEST SIDE | GARY | GARY | | ER | P | 2925058 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/03/2006 | ABOVE DROP CEILING AND GROUNDIG SECOND FLOOR SOUTH SPOON, HARD LIDS FOURTH FLOOR | GARY | GARY | | ER | P | 2925050 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 09/28/2006 | SECOND FLOOR SOUTH SPOON ABOVE DROP CEILNG, ELECTRIC ROOM PANELS | GARY | GARY | | ER | P | 2925042 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 09/26/2006 | NORTH AND WEST STAIRWAYS, BASEMENT AREA' A' ABOVE DROP CEILING | GARY | GARY | | ER | P | 2925034 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 09/22/2006 | HARD LIDS FOURTH FLOOR | GARY | GARY | | ER | P | 2925026 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 09/14/2006 | ABOVE DROP CEILING FIRST AND FOURTH FLOORS AREA 'A' AND SOUTH STAIRWAYS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2925018 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 09/07/2006 | BASEMENT CEILINGS LESS KITCHEN AREA 'A', 4 TH FLOOR AREA 'B' ALL HARD LIDS | GARY | GARY | | ER | P | 2925010 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 09/01/2006 | GROUNDING AND ABOVE DROP CEILING, BASEMENT ' A AND B AREAS' | GARY | GARY | | ER | P | 2925002 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/31/2006 | SECOND FLOOR C SECTION ROOMS HARD LIDS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924994 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/30/2006 | GROUNDING AND ABOVE DROP CEILING AREA B BASEMENT | GARY | GARY | | ER | P | 2924647 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/28/2006 | THIRD FLOOR HARD LIDS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924986 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/25/2006 | BONDING/GRDING OK ON BASEMENT LEVEL AREA IS MARKED ON PRINT | GARYL | GARYL | | ER | P | 2924978 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/24/2006 | LOWER LEVEL, BASEMT???, CEILINGS OK TO COVER IN CORRIDOR AND 5 OFFICES, MARKED ON BLUE PRINT | GARYL | GARYL | | ER | P | 2924970 |
KENNY ELECTRIC SERVICE, INC. | ER | R | 08/21/2006 | REJECTED UNTILL FIRE ALARM INSPECTION IS CALLED IN & PASSED---LOW VOLTAGE WIRING ON CIELING---KENNEY,3 OPEN BOXES & SUPPORT FLEX ON CIELING [4 PLACES] | THOMAS | THOMAS | | ER | R | 2924962 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/14/2006 | SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924954 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/10/2006 | HARD LIDS THIRD FLOOR, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924946 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/08/2006 | HARD LIDS, PANELS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924938 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 08/01/2006 | HARD LIDS, TRANSFORMERS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924932 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/25/2006 | SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924925 |
J. E. DUNN CONSTRUCTION COMPANY | ES | P | 07/25/2006 | COMMERCIAL SERVICE: SERVICE FROM CENTERAL PLANT TO MAIN HOSPITAL BUILDING SWITCH GEAR, GEAR LOCKED OUT TILL FUTURE INSPECTIONS | GARY | GARY | | ES | P | 2926710 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/24/2006 | WALLS AND HARD LIDS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924919 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/20/2006 | PANELS, TRANSFORMERS | GARY | GARY | | ER | P | 2924910 |
J. E. DUNN CONSTRUCTION COMPANY | ER | P | 07/18/2006 | SHEETS SPLICED 7/18 ARE: A3.01H, A5.31, E2.02S., E3.02, E4.20CP, E4.2BA CHANGES ARE CLOUDED | GARYL | GARYL | | ER | P | 2926702 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/14/2006 | HARD LIDS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924903 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/11/2006 | HARD LIDS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924894 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 07/07/2006 | SEE PRINS THIS DATE | GARY | GARY | | ER | P | 2924887 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 06/29/2006 | 1ST FLOOR B AREA HARD LID SOFFITS,3RD FLOOR AREA A WALLS COMPLETE EXCEPT 2 OPEN AREA NURSES STATIONS AND ELECTRIC ROOM--------NEED APPROVED SHEET E4.11A-------------NEED APPROVED PLANS FOR NEW LAYOUT OF POWERHOUSE-------------- | JERRY | JERRY | | ER | P | 2924879 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 06/20/2006 | FIRST FLOOR HARD LIDS SOUTH | GARY | GARY | | ER | P | 2924639 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 06/16/2006 | WALLS AS MARKED ON E4.22A AND E4.22B | SHELBY | SHELBY | | ER | P | 2924871 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 06/09/2006 | SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924632 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 05/31/2006 | WALLS AND HARD LIDS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924863 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 05/25/2006 | FIRST | GARY | GARY | | ER | P | 2924626 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 05/22/2006 | BATHROOM CEILINGS FIRST FLOOR | GARY | GARY | | ER | P | 2924856 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 05/17/2006 | OK TO COVER | GARY | GARY | | EUG | P | 2924848 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 05/11/2006 | WALLS MOVED, PRINTS TO COME AND THEN HIGHLIGHTED | GARY | GARY | | ER | P | 2924841 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 05/05/2006 | TRANSFORMER MOVE | GARY | GARY | | EUG | P | 2924619 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 04/24/2006 | BASEMENT HARD LIDS, FIRST FLOOR EXTRAS BY BULLOT # 29, SEE PRINTS AND PERMIT | GARY | GARY | | ER | P | 2924611 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 04/04/2006 | WALLS AND CEILINGS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924833 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 03/31/2006 | WALLS AND SOFFETS, SEE PRINTS THIS DATE | GARY | GARY | | ER | P | 2924605 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 03/09/2006 | KITCHEN WALLS, SEE PRINT | GARY | GARY | | ER | P | 2924825 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 02/13/2006 | WALLS,SEE ORANGE CARD AND APPROVED PLAN | JERRY | JERRY | | ER | P | 2924817 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/27/2006 | WALLS,SEE ORANGE CARD AND APPROVED PLANS | JERRY | JERRY | | ER | P | 2924809 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/18/2006 | WALLS,SEE ORANGE CARD AND APPROVED PLANS | JERRY | JERRY | | ER | P | 2924800 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 01/13/2006 | WALLS,SEE ORANGE CARD AND APPROVED PLANS | JERRY | JERRY | | ER | P | 2924792 |
KENNY ELECTRIC SERVICE, INC. | ER | R | 12/20/2005 | NEED REVISED PLANS FOR POWER PLANT (EQUIPMENT WORKING SPACE AND ESCAPE ROUTES AND DOORS) ,TAKE THEM THRU PLAN REVIEW AT PPRBD | JERRY | JERRY | | ER | R | 2924784 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 12/20/2005 | STUD WALLS IN POWER PLANT | JERRY | JERRY | | ER | P | 2924774 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/26/2005 | LOOKED AT SOME OF AND TALKED WITH CONTRACTOR ABOUT CONDUIT INSTALLED ABOVE DUCT WORK SO I WOULD KNOW HOW COVERED CONDUIT WAS INSTALLED ON FUTURE INSPECTIONS | JERRY | JERRY | | ER | P | 2924768 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 07/26/2005 | SEE PRINT | DEAN | DEAN | | EUG | P | 2924760 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 07/13/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924754 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 06/30/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924746 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 06/17/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924738 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 06/10/2005 | MUD ALL OVER,INSPECTION IS FOR POWER HOUSE AND I WILL BE ABLE TO SEE THE PVC COATED 90'S ON NEXT INSPECTION | JERRY | JERRY | | EUG | P | 2924598 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 06/09/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924592 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 06/08/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924732 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 06/03/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924725 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 05/25/2005 | SEE PLAN | JERRY | JERRY | | EUG | P | 2924718 |
KENNY ELECTRIC SERVICE, INC. | ESL | P | 05/16/2005 | SEE PRINTS ORANG AREA | IKE | IKE | | ESL | P | 2924710 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 05/13/2005 | SEE HIGHLIGHTED PLAN | MIKEC | MIKEC | | EUG | P | 2924703 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 05/05/2005 | SEE PLAN | JERRY | JERRY | | EUG | P | 2924695 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 04/28/2005 | SEE PRINT -------THIS INSPECTION WAS BY PICTURES ONLY,I TOLD THEM NOT TO MAKE A HABIT OF THIS------- | JERRY | JERRY | | EUG | P | 2924687 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 04/22/2005 | SEE PRINT | JERRY | JERRY | | EUG | P | 2924678 |
KENNY ELECTRIC SERVICE, INC. | EUG | P | 03/29/2005 | CONCETE ENCASED ELECTRODE | JERRY | JERRY | | EUG | P | 2924671 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 04/20/2007 | RECEIVED BALANCE REPORT FROM JPG ENGINEERING, INC. SENT TO SCANNING, 4/23/07. | LYNNS | LYNNS | | H= | C | 2923499 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 04/16/2007 | STEAM AND CONDENSATE FINAL. | LYNNS | LYNNS | | H= | P | 2923491 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/25/2007 | INTRELOCKS OK. NEED BALANCE REPORTS YET. | LYNNS | LYNNS | | H= | P | 2923482 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/16/2007 | GAS FINAL ONLY. | LYNNS | LYNNS | | H= | P | 2923475 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 12/07/2006 | 3RD AND 4TH FLOORS COMPLETE. NEED TO SEE INTERLOCKS ON HOODS AND BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 2923466 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 10/18/2006 | HVAC FINAL ON 3RD FLOOR ONLY. | LYNNS | LYNNS | | H= | P | 2923458 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 10/12/2006 | ROUGH DUCT COMPLETED INCLUDING F/S DAMPERS, LOWER MECH ROOM AND PENTHOUSE ROUGH. | LYNNS | LYNNS | | HD | C | 2923454 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 10/12/2006 | 1ST FLOOR HVAC FINAL EXCEPT FOR ROOMS AS NOTED ON PLANS. 2ND FLOOR HVAC FINAL COMPLETE. | LYNNS | LYNNS | | H= | P | 2923446 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/23/2006 | NORTH HALF OF 1ST FLOOR OK FOR TILE. | LYNNS | LYNNS | | H= | P | 2923438 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/08/2006 | BASEMENT FINAL OK FOR TILE EXCEPT FOR: OR ROOMS, IT ROOM, MECH ROOM AND NEED TO SEE FIRE/SMOKE DAMPERS ON NEW REVISED PLANS. | LYNNS | LYNNS | | H= | P | 2923430 |
HEATING & PLUMBING ENGINEERS, INC | HI+ | C | 06/07/2006 | 60# TEST ON FUEL OIL LINES OK. | LYNNS | LYNNS | | HI+ | C | 2923422 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/09/2006 | 4TH FLOOR MEDIUM AND LOW PRESSURE DUCT ROUGH EXCEPT FOR FLEXS, EXHAUST AND RISER CONNECTIONS. | LYNNS | LYNNS | | HD | P | 2923414 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/05/2006 | 4- GREASE DUCT RISERS FROM HOODS THROUGH ROOF OK TO FIRE WRAP. | LYNNS | LYNNS | | HD | P | 2923407 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/29/2006 | THIRD FLOOR AREAS A AND B ROUGH DUCT EXCEPT FOR RISERS AND F/S DAMPERS. | LYNNS | LYNNS | | HD | P | 2923400 |
HEATING & PLUMBING ENGINEERS, INC | HI | C | 03/23/2006 | 60# TEST ON WELDE GAS LINE TO KITCHEN AREA OK AND SIZING PER APPROVED PLANS. | LYNNS | LYNNS | | HI | C | 2923392 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/16/2006 | DISCUSSED MISSING F/S DAMPERS WITH CONTRACTOR. | LYNNS | LYNNS | | HD | P | 2923384 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/28/2006 | AREAS A, B AND C, 2ND FLOOR ROUGH DUCT EXCEPT FOR F/S DAMPERS. | LYNNS | LYNNS | | HD | P | 2923375 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/17/2006 | AREA "B" 1ST FLOOR NORTH AND EAST, ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 2923367 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/02/2006 | AREA A, KITCHEN AREA ROUGH DUCT OK TO INSULATE, AREA B 1ST FLOOR, SOUTH/WEST ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 2923359 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/09/2006 | BASEMENT, ROUGH DUCT COMPLETE EXCEPT FOR THE MECH. ROOM AND THE KITCHEN. 1ST FLOOR, AREA"A" NORTH, ROUGH DUCT EXCEPT FOR THE RISER SHAFTS AND F/S DAMPERS. GREASE DUCT THROUGH THIS FLOOR. GREASE DUCTS THROUGH THIS FLOOR. | LYNNS | LYNNS | | HD | P | 2923352 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/15/2005 | ROUGH DUCT IN AREA "B" EXCEPT FOR FLEXS, F/S DAMPERS OK. ROUGH DUCT IN AREA "A" SOUTH OF E LINE AND WEST OF 8 LINE, ALL OK FOR INSULATION. | LYNNS | LYNNS | | HD | P | 2923344 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 11/14/2005 | AREA B, HEATING SUPPLY AND RETURN LINES AND SNOW MELT OK TO INSULATE. | LYNNS | LYNNS | | HWP | P | 2923336 |
HEATING & PLUMBING ENGINEERS, INC | HC | C | 11/07/2005 | OK FOR METER. | LYNNS | LYNNS | | HC | C | 2923298 |
HEATING & PLUMBING ENGINEERS, INC | HI | P | 11/07/2005 | 60# TEST ON ELEVATED PRESSURE GAS FOR TEMP HEAT OK. | LYNNS | LYNNS | | HI | P | 2923292 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 10/14/2005 | SOUTH LOBE, AREA B, BASEMENT IN FRONT OF MECH. ROOM. | LYNNS | LYNNS | | HD | P | 2923285 |
HEATING & PLUMBING ENGINEERS, INC | HGI | R | 10/03/2005 | CANCELLED PER FRED FROM HPE FIELD OFFICE. | LYNNS | LYNNS | | HGI | R | 2923277 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 08/25/2005 | 4- 100# TESTS ON PROCESS PIPE AND CHILL RETURN OK. | LYNNS | LYNNS | | HWP | P | 2923268 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 08/22/2005 | 2- 200# TESTS ON STEAM SUPPLY AND RETURN AND CONDENSATE RETURN FROM MAIN HOSPITAL TO MANHOLE OK TO COVER. | LYNNS | LYNNS | | HWP | P | 2923259 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 08/05/2005 | OK TO COVER FROM PLANT TO MANHOLE | JACK | JACK | | HWP | P | 2923252 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 03/27/2007 | SEE PAGE M4.12B FOR THE TWO SINKS IN CT AREA BEING CAPPED OFF---NEW PERMITS AND INSPECTIONS WILL BE REQ'D IF FINISHED AT A LATER DATE | LYNNIE | LYNNIE | | P= | C | 2924586 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 02/07/2007 | 3RD, 4TH AND 5TH FLOORS COMPLETE | LEE | LEE | | P= | P | 2924579 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 01/12/2007 | BASEMENT COMPLETE, 1ST FLOOR MINUS RADILOGY OK | LEE | LEE | | P= | P | 2924571 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 01/08/2007 | SOUTH POD 4TH FLOOR OK | LEE | LEE | | P= | P | 2924564 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 12/19/2006 | 3RD FLOOR MINUS ROOM 3152 & 3149, PARTIAL KITCHEN INSPECTION (CONSULTATION) | LEE | LEE | | P= | P | 2924557 |
HEATING & PLUMBING ENGINEERS, INC | P= | R | 12/08/2006 | 3RD FLOOR NOT READY | LYNNIE | LYNNIE | | P= | R | 2924550 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/31/2006 | BASEMENT COMPLETE MINUS KITCHEN, 1ST FLOOR COMPLETE MINUS RADIOLOGY, 2ND FLOOR COMPLETE | LEE | LEE | | P= | P | 2924542 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/18/2006 | 2ND FLOOR --- SOUTH, WEST AND EAST WINGS OK | LEE | LEE | | P= | P | 2924536 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/17/2006 | FIELD CANCELLED, HOT WATER DOWN, BROKEN STEAM VALVE | LEE | LEE | | P= | P | 2924524 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/04/2006 | 1ST FLOOR, AREA "B" MINUS RADIOLOGY, M.R.I. & C.T. -- CHECKING ON CRITICAL LEVEL REQUIREMENTS (HAVE 4-1/2" NOW) FOR CLINICAL SINKS AND ATMOSPHERIC V.B. MOUNTED ON WALL BESIDE SINKS | LEE | LEE | | P= | P | 2924517 |
HEATING & PLUMBING ENGINEERS, INC | PRD | C | 10/03/2006 | | LEE | LEE | | PRD | C | 2924508 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/03/2006 | 1ST FLOOR AREA "A" COMPLETE | LEE | LEE | | P= | P | 2924501 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/02/2006 | ISLAND SINK LACKS A CLEANOUT--QUESTION VACUUM BREAKERS ON HAND SPRAYERS AS TO BEING RATED FOR CONSTANT PRESSURE AND BEING CONSEALED BEHIND AN ACCESS DOOR IN WALLS? | LYNNIE | LYNNIE | | P= | P | 2924493 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 09/27/2006 | BASEMENT --- PRE OPP AREA --- ATMOSPHERIC VAC BREAKER ISSUE AT ALL BED PAN WASHERS, EXPOSE C/OUT ON DBL BOWL SINK --- ENDO AREA --- EXPOSE C/OUT ON LAUNDRY SINK AND FIX GRADE ON SAME SINK | LEE | LEE | | P= | P | 2924486 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 08/07/2006 | ALL DWV AND DOMESTIC WATER NOW COMPLETE | LYNNIE | LYNNIE | | PTO | C | 2924479 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/03/2006 | M4.15A ROOM 4157 DWV | LYNNIE | LYNNIE | | PTO | P | 2924472 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/25/2006 | M4.15A----DWV FOR ROOMS 4149-61,61A-62,62A-48-65,65A-66,66A-67---------DOMESTIC WATER TRUNK LINES AND LATERIALS ON M4.25A CLOUDED AREAS | LYNNIE | LYNNIE | | PTO | P | 2924467 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/21/2006 | 4TH FLOOR, DWV & H20 ROOMS 4175, 4175A, 4176, 4176A, 4176B, ALSO TWO FLOOR SINKS IN PENTHOUSE OK, NOTE: NO TESTS ON VENTS IN PENTHOUSE | LEE | LEE | | PTO | P | 2924459 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/19/2006 | M4.15A-------DWV ON ROOMS 4132,32A-33,33A-34,34A-35,35A-68,68A-69,69A-72,72A-73,73A-74,74A | LYNNIE | LYNNIE | | PTO | P | 2924451 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/17/2006 | M4.15A===DWV AND WATER LINES ROOMS 4136-36A, 37-37A, 28-28A,29-29A---DWV ONLY ROOMS 4138-38A,39B,43-43A, 44-44A, 45-45A, 52----KEY NOTES #1 STACKS CLOUDED ON THE ABOVE PAGE | LYNNIE | LYNNIE | | PTO | P | 2924445 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/13/2006 | M4.25B SOUTH WING 4TH. DWV AND H2O COMPLETE | LARRY | LARRY | | PTO | P | 2924438 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/11/2006 | 3 PRE FAB SHOWERS ON 3RD FLR | LARRY | LARRY | | PTO | P | 2924424 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/11/2006 | 3 SHOWERS ON THIRD FLOOR | LARRY | LARRY | | PTO | P | 2924431 |
HEATING & PLUMBING ENGINEERS, INC | P= | R | 07/06/2006 | TESTING: STEVE HILLS | LYNNIE | LYNNIE | | P= | R | 2924415 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/26/2006 | TRAILER LOCKED----DWV----ROOMS 3161,61A-62,62A-64,65,65A-66,66A-67 AND 4TH FLOOR UNDER FLOOR DWV TO THOSE ABOVE THE 3RD FLOOR TOO | LYNNIE | LYNNIE | | PTO | P | 2924407 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/22/2006 | DWV----ROOMS 3167.67A,72,27A,74,75,75A,75A,7676C,76D, | LYNNIE | LYNNIE | | PTO | P | 2924398 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/21/2006 | 3RD FLOOR DOMESTIC LATERIALS--LOW TEST AND SOME AREAS INCOMPLETE PASSED THE BALL VALVES | LYNNIE | LYNNIE | | PTO | P | 2924389 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/20/2006 | DWV FOR ROOMS--3120,54,47,46,04,39,68,68A,69,69A,72 AND UNDER FLOORS OF THE ABOVE ROOMS TOO ON 4TH FLOOR | LYNNIE | LYNNIE | | PTO | P | 2924383 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/16/2006 | ROOMS 3128-28A, 29-29A, 32, 33-33A,34 AND UNDER FLOORS OVER ROOM ABOVE ON 4TH FLOOR---CLOUDED AREAS | LYNNIE | LYNNIE | | PTO | P | 2924375 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/15/2006 | M4.14A AND M4.15A--ROOMS 3134, 34A,35,35A,38,39,43,44,45,45A,52---DWV--IN CEILINGS OF ALL THESE ON 4TH FLOOR (UNDER FLOOR) DWV OK TOO--CLOUDED AREAS ON PLANS | LYNNIE | LYNNIE | | PTO | P | 2924367 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/13/2006 | ROOMS 3136-36A-3137 DWV AND CEILINGS OF ABOVE ROOMS--DOMESTIC WATER TRUNKS AND DROPS ALL OK-- | LYNNIE | LYNNIE | | PTO | P | 2924361 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/09/2006 | M4.14B---M4.15B CLOUDED AREAS ON PLANS | LYNNIE | LYNNIE | | PTO | P | 2924349 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/07/2006 | M4.14B--CLOUDED AREAS--M4.24B CLOUDED AREAS---------DOMESTIC WATER TRUNK LINES AND ALLDROPS AND LATERIALS ARE NOW COMPLETE ON THE 3RD FLOOR | LYNNIE | LYNNIE | | PTO | P | 2924341 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/06/2006 | ROOMS 3114---3114A 2160---2161 CEILINGS DWV---DOMESTIC WATER TRUNK LOOP LOST TEST ON 3RD LEVEL | LYNNIE | LYNNIE | | PTO | P | 2924333 |
HEATING & PLUMBING ENGINEERS, INC | PTO | R | 06/05/2006 | LEAKS AND TIMING PROBLEM | LYNNIE | LYNNIE | | PTO | R | 2924325 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/26/2006 | ROOMS B632R AND B633 DWV AND WATER PIPES | LYNNIE | LYNNIE | | PTO | P | 2924315 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/24/2006 | ROOM 1462---DOMESTIC WATER MIXING VALVES AND ACID WASTE FLOOR DRAIN VENT THRU THE ROOF | LYNNIE | LYNNIE | | PTO | P | 2924306 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/23/2006 | ROOMS 2148A--2148R--2203 AND CEILING ABOVE THESE ROOMS | LYNNIE | LYNNIE | | PTO | P | 2924298 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/22/2006 | M4 13 AND 14--CLOUDED AREAS | LYNNIE | LYNNIE | | PTO | P | 2924289 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/19/2006 | DWV AND SOME WATER PIPING--DWV IN ROOMS 2203 AND 1116H--AND CEILINGS ABOVE THESE ROOMS--ALL ROADS ARE BLOCKED FOR PAVING--CANT GET TO TRAILER AT THIS TIME | LYNNIE | LYNNIE | | PTO | P | 2924281 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/12/2006 | DWV AND WATER LINES-CLOUDED AREAS ON M4-13A AND M4-14A--DOMESTIC WATER LINES FROM ELEVATOR SHAFTS TO THE WEST ARE COMLPETE | LYNNIE | LYNNIE | | PTO | P | 2924274 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/11/2006 | STILL NO ACCESS TO TRAILERS----TESTED DWV IN ROOMS 2151C--2156B--2104---TESTS INCLUDE 3RD FLOOR UNDER FLOORS DWV OVER THE THREE AREAS LISTED ABOVE | LYNNIE | LYNNIE | | PTO | P | 2924266 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/10/2006 | ADDED NEW SINKS IN ROOMS 2149--1202A--1212--1215---ROADS WERE BLOCKED WITH PAVING EQUIPMENT--DIDNT SIGN CARDS--WILL ON NEXT INSPECTIONS | LYNNIE | LYNNIE | | PTO | P | 2924259 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/09/2006 | DWV M4 13B CLOUDED AREAS | LYNNIE | LYNNIE | | PTO | P | 2924252 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/08/2006 | B-BASEMENT PLANS ROOMS 637, 38,39, 42 AND 2ND FLOOR ROOMS 2144-32 2135A AND DWV ABOVE IN CEILINGS | LYNNIE | LYNNIE | | PTO | P | 2924244 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/05/2006 | DWD AND WATER LINES M4.13B AND M4.13A--CLOUDED AREAS ON PLANS | LYNNIE | LYNNIE | | PTO | P | 2924236 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/04/2006 | M413A--2ND FLOOR DWV---COUDED AREAS M414--UNDER FLOOR DWV--CLOUDED AREAS | LYNNIE | LYNNIE | | PTO | P | 2924228 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/03/2006 | AREA "B"-----LACKS ONE SINK IN ROOM 2105 --- ROOM 2123 TO COME--REST OF 2ND FLOOR DWV OK---DWV UNDER 3RD FLOOR OK | LYNNIE | LYNNIE | | PTO | P | 2924218 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/02/2006 | AREA "A"--M13.A--DWV FOR UNDER 3RD FLOOR AREAS---DWV FOR ABOVE FLOOR ON 2ND FLOOR--UNDER FLOOR OF 3114,15A,16,16A,3121,3122A---2ND FLOOR ROOMS 2113, 14,14A,15,17,19,22 DWV | LYNNIE | LYNNIE | | PTO | P | 2924210 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/28/2006 | PLAN PG. M4.13A-WASTE LINES IN CLOUDED AREAS IN RED----M.423A WATER LINE TRUNKS IN CORRIDOR--CLOUDED--RM 2138 LAV IS ON TEST TOO | LYNNIE | LYNNIE | | PTO | P | 2924201 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/25/2006 | CALLED IN WRONG INSPECTION -- AGAIN--PROCEEDING AT OWN RISK AS TO THE PLANS BEING APROVED AND REDRAWN--MOVED WATER CLOSETS AND HAND SINKS--CLOUDED AREAS ON PLUMBERS PLANS M4.11B--CHECK DELETED PLUMBING THRU FLOOR AREAS AS BEING CAPPED/PLUGGED OFF ON PTO NEXT INSPECTION--TRAILER PLANS DO NOT HAVE THE NEW AREAS DRAWN YET | LYNNIE | LYNNIE | | PB | P | 2924195 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/21/2006 | CALLED IN WRONG | LEE | LEE | | PTO | P | 2924188 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/21/2006 | 2- 4" DRAINS 1ST FLOOR EAST SIDE COMPLETE, STILL NEED AMBULANCE ENTRY DRAIN TO COMPLETE | LEE | LEE | | PRD | P | 2924180 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/17/2006 | PLUMBER STILL NEEDS ANOTHER INSPECTION | LYNNIE | LYNNIE | | PRD | P | 2924173 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/14/2006 | AREA A----4TH FLOOR UP TO THE TEST TEES GOING TO PENTHOUSE-- THEN WERE DONE WITH ROOF DRAINS | LYNNIE | LYNNIE | | PRD | P | 2924165 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/13/2006 | 4TH FLOOR SOUTH TOWER, 8- SETS OF DRAINS COMPLETE | LEE | LEE | | PRD | P | 2924157 |
HEATING & PLUMBING ENGINEERS, INC | PTO | R | 04/13/2006 | NOT READY | LEE | LEE | | PTO | R | 2924148 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/12/2006 | WATER MAINS IN SHAFT UP TO 3RD FLOOR OK | LEE | LEE | | PTO | P | 2924140 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 04/12/2006 | TWO 6" DRAINS INCLUDING LATTERALS AREA "B" NORTH SIDE UP THRU PENTHOUSE OK PENDING PLANS REVISED TO SHOW DELETED DRAINS ON THAT BRANCH AND ADDED TO ANOTHER SET, ALSO TWO PLANTER DRAINS 2ND FLOOR AREA "B" OK | LEE | LEE | | PRD | P | 2924133 |
HEATING & PLUMBING ENGINEERS, INC | PTO | R | 04/10/2006 | NOT READY | LEE | LEE | | PTO | R | 2924125 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/06/2006 | MISC DWV EAST AREA "B" 1ST FLOOR UP TO 3RD FLOOR | LEE | LEE | | PTO | P | 2924117 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/04/2006 | H20 1ST FLOOR AREA "B" COMPLETE EXCEPT SILLCOCK, AND DECON H20 | LEE | LEE | | PTO | P | 2924109 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/03/2006 | MISC DWV 1ST FLOOR AREA "B" MIDDLE SECTION | LEE | LEE | | PTO | P | 2924101 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/31/2006 | THREE DWV SYSTEMS AREA "B" 1ST FLOOR OK | LEE | LEE | | PTO | P | 2924093 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/30/2006 | 1ST FLOOR AREA "B" 5- DWV SYSTEMS ON S/W END (NO H20) | LEE | LEE | | PTO | P | 2924085 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/29/2006 | 1ST FLOOR AREA "B" MISC DWV ONLY S/E CORNER, NEED TO SUPPORT P-TRAPS AND FIX BACKGRADED 4" COMBO | LEE | LEE | | PTO | P | 2924077 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/28/2006 | MISC DWV 1ST FLOOR AREA "B" | LEE | LEE | | PTO | P | 2924070 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/27/2006 | MISC DWV ONLY 1ST FLOOR AREA "B" | LEE | LEE | | PTO | P | 2924063 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 03/27/2006 | RELOCATED FLOOR SINK AREA "A" NEAR CART WASH/DECONTAMINATION ROOM | LEE | LEE | | PB | P | 2924053 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/24/2006 | CIRCLED AND INITIALED 3 WATERLINE TESTS AND 4 DWV LINES ON PLANS AREA B | JACK | JACK | | PTO | P | 2924047 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/23/2006 | MISC DWV AREA "A" 1ST FLOOR, ALSO H20 AT MISC SINKS SAME AREA LOWER LEVEL | LEE | LEE | | PTO | P | 2924039 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 03/22/2006 | RELOCATED 3- SINKS IN AREA "A" | LEE | LEE | | PB | P | 2924029 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/22/2006 | RELOCATED MISC. DWV ON SINKS IN AREA A&B | LEE | LEE | | PTO | P | 2924021 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 03/17/2006 | AREA B NORTH R.D TOTAL OF 6 O.K, AND 2 RD IN ATRIUM O.K | JOEL | JOEL | | PRD | P | 2924013 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/17/2006 | 2-4'' DWV STACKS IN RADIOLOGY O.K | JOEL | JOEL | | PTO | P | 2924005 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/15/2006 | AREA "B", MISC DWV ONLY 1ST FLOOR | LEE | LEE | | PTO | P | 2923997 |
HEATING & PLUMBING ENGINEERS, INC | PRD | R | 03/15/2006 | NO TEST | LEE | LEE | | PRD | R | 2923989 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/14/2006 | AREA-B 1ST. FLOOR MISC. DWV ONLY NORTH WALL, (PUBLIC RESTROOMS, WASHER BOXES AND SINKS). | LEE | LEE | | PTO | P | 2923979 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 03/10/2006 | AREA "B" 1ST FLOOR COMPLETE PENDING UNDERDECK CLAMPS INSTALLED AND DRAIN OVER AMBULANCE ENTRY | LEE | LEE | | PRD | P | 2923969 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/10/2006 | AREA "A" IST FLOOR CEILING H20 MAINS OK, KITCHEN H2O OK | LEE | LEE | | PTO | P | 2923963 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 03/02/2006 | (ALL AREA "B"), TWO 6" FROM BSMT TO 1ST FLOOR S/W WITH TWO 4" DRAINS TO CANOPY OK, TWO 6" 1ST FLOOR WITH 4" TO CANOPY N/W COMPLETE, TWO 6" N/E UP TO 3RD FLOOR COMPLETE, LOST TEST ON S/W 6" WITH ONE 4" TO CANOPY, TWO 4" TO CANOPY AND TWO 6" DRAINS | LEE | LEE | | PRD | P | 2923954 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/02/2006 | MISC F/D VENTS AREA "B" MECHANICAL ROOM | LEE | LEE | | PTO | P | 2923944 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/23/2006 | DWV AREA "A" KITCHEN COMPLETE, DWV AREA "A" 1ST FLOOR COMPLETE (ABOVE BSMT) | LEE | LEE | | PTO | P | 2923936 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/14/2006 | AREA "A" 2ND FLOOR H20 IN EXTERIOR WALLS OK | LEE | LEE | | PTO | P | 2923928 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 02/10/2006 | AREA "A" LOWER LEVEL COMPLETE, STILL NEED TWO 6" DRAINS IN AREA "B" | LEE | LEE | | PRD | P | 2923921 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/10/2006 | DWV AREA "A" 1ST AND 2ND FLOOR COMPLETE EXCEPT KITCHEN AND MECH. ROOM, 2ND FLOOR AREA "A" H20 90% COMPLETE MINUS WATER IN EXTERIOR WALL, HOSE BIBBS, ICE MAKERS, TWO HAND SINKS AND KITCHEN | LEE | LEE | | PTO | P | 2923913 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/09/2006 | MISC H20 DROPS AREA "A" OK, MISC AREA "A" DWV LOWER LEVEL OK, NEED SINK TRAP ARMS 2ND FLOOR AREA "A" AND RETEST | LEE | LEE | | PTO | P | 2923905 |
HEATING & PLUMBING ENGINEERS, INC | PTO | R | 02/06/2006 | LOST TEST ON MISC DWV IN KITCHEN, W/C ABOVE KITCHEN EXCEEDS 135 DEGREES ON TRAP ARM | LEE | LEE | | PTO | R | 2923899 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/03/2006 | AREA "A" 2ND FLOOR H20 MAINS ONLY OK | LEE | LEE | | PTO | P | 2923893 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/02/2006 | H20 DROPS AREA "A" FROM COMPUTER ROOM SOUTH EXCEPT CART WASH AREA, NEED URNAL C/OUTS AREA "B" EAST RESTROOMS AND ACCESS TO HAMMER ARRESTOR IN WALL AT FINAL SAME RESTROOM | LEE | LEE | | PTO | P | 2923885 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 02/02/2006 | ROOF DRAINS ABOVE EAST MECHANICAL ROOM COMPLETE INCLUDING TWO 6" RISERS UP TO 1ST FLOOR | LEE | LEE | | PRD | P | 2923879 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 01/27/2006 | AREA ''A'' BASEMENT THRU 1ST FLOOR O.K | JOEL | JOEL | | PRD | P | 2923870 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 01/26/2006 | AREA A ROOFDRAINS FROM FIRST FLOOR TO ROOF TESTED OK, LACK TEST ON BASEMENT PIPING ONLY | JACK | JACK | | PRD | P | 2923862 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/26/2006 | DOUBLE CONTAINMENT PIPING AREA B OK | JACK | JACK | | PTO | P | 2923855 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/25/2006 | ACID WASTE OVERFLOW LOST TEST | LEE | LEE | | PTO | P | 2923847 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/24/2006 | DOUBLE CONTAINMENT ACID WASTE AREA "B" PARTIAL ON INNER PIPE | LEE | LEE | | PTO | P | 2923838 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/18/2006 | AREA "A" 1ST AND 2ND FLOOR DWV ONLY COMPLETE EXCEPT KITCHEN, AREA "B" 1ST FLOOR COMPLETE | LEE | LEE | | PTO | P | 2923830 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/17/2006 | MISC DWV ONLY IN AREA "A" (MECH ROOM F/D VENTS, CHEMICAL ROOM SINKS, 3/4 RESTROOM ETC), MISC DWV ONLY AREA "A" 2ND FLOOR | LEE | LEE | | PTO | P | 2923822 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/13/2006 | 2" CW AND 1-1/2" HW H20 MAINS ONLY COMPLETE IN AREA "B" | LEE | LEE | | PTO | P | 2923814 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/09/2006 | LOWER LEVEL AREA "B" COMPLETE EXCEPT CFRITICAL SERVICE SINK AND ACID WASTE | LEE | LEE | | PTO | P | 2923806 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/06/2006 | AREA B, NINE PREP ROOM W/C / LAV COMBOS COMPLETE, NEED FIVE MORE DWV ONLY (H20 COMPLETE), ALSO 4" CW & HW MAINS ONLY COMPLETE LOWER LEVEL AREA "A" UP TO AREA "B" THEN TO UPPER LEVEL CHASE | LEE | LEE | | PTO | P | 2923799 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 01/06/2006 | TWO 4" DRAINS MECH. ROOM CEILING OK | LEE | LEE | | PRD | P | 2923791 |
HEATING & PLUMBING ENGINEERS, INC | PTO | R | 12/30/2005 | NOTHING READY | LEE | LEE | | PTO | R | 2923783 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 12/30/2005 | NEED TO PROVIDE LISTING FOR ADHESIVES USED ON NO HUB BANDS AND APPROVAL FROM HUSKY, ALSO PLANS SHOW 8 TO 6" TRANSITION ON VERTICAL, PROVIDE LETTER FROM ENGINEER TO ALLOW TRANSITION ON HORIZONTAL | LEE | LEE | | PRD | P | 2923775 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 12/29/2005 | AREA "A" LEAKS AT SEVERAL JOINTS, NEED TO REVISE PLANS TO SHOW TWO ADDITIONAL 4" DRAINS | LEE | LEE | | PRD | P | 2923766 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 12/16/2005 | MISC DWV WEST SIDE OF AREA "A" OK (NO COPPER) | LEE | LEE | | PTO | P | 2923759 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 12/14/2005 | MISC DWV ONLY AREA B, ALSO MOP SINK AND F/D VENT IN VENDING AREA | LEE | LEE | | PTO | P | 2923751 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 12/13/2005 | CANCELLED BY FRED WITH HPE | LEE | LEE | | PTO | P | 2923742 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 11/23/2005 | LOW TESTS (LEAKS) ON PRD OVER MECH ROOM, DESIGN OK, ALSO INSPECTED 2- 6" VICTROLIC DRAINS FROM MECH ROOM UP TO 2ND FLOOR (LOW TEST) | LEE | LEE | | PRD | P | 2923735 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/23/2005 | MISC DWV ONLY AREA "A" (STACKS PAINTED GREEN) | LEE | LEE | | PTO | P | 2923729 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/14/2005 | 2" COLD, 1-1/2" HOT AND MISC. 2" HOT H20 MAINS SOUTH OF ELEVATOR SHAFT OK | LEE | LEE | | PTO | P | 2923721 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 11/08/2005 | SOUTH END PRIMARY 6'' O.K, CHECK GRADE ON END | JOEL | JOEL | | PRD | P | 2923711 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 11/04/2005 | SOUTH END BASEMENT THRU 1ST FLOOR O.K | JOEL | JOEL | | PRD | P | 2923704 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 10/27/2005 | KITCHEN COMPLETE | LEE | LEE | | PB | P | 2923695 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 10/25/2005 | SANITARY AND GREASE NORTH THIRD OF KITCHEN OK | LEE | LEE | | PB | P | 2923687 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 10/21/2005 | CART AREA GREASE WASTE OK, OTHER KITCHEN AREA NEED TO REPLACE COMBOS ON THE VERTICAL WITH SAN-TEES THRU-OUT | LEE | LEE | | PB | P | 2923679 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/17/2005 | MISC DWV AREA B OK | LEE | LEE | | PTO | P | 2923671 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/06/2005 | MISC DWV AREA B OK | LEE | LEE | | PTO | P | 2923663 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/03/2005 | MISC. DWV AREA "B" (STACKS PAINTED GREEN), ALSO ACID WASTE AND VENT LOOKED AT, SOME QUESTIONS CONCERNING P-TRAP AND VENT TIE IN AT ACID WASTE | LEE | LEE | | PTO | P | 2923655 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 09/29/2005 | AREA B, MISC DWV, 5- COLOUM STACKS S/E, VENTING ISSUES ON 2" AT W-BOXES | LEE | LEE | | PTO | P | 2923648 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 09/23/2005 | MISC. DWV AREA B, SOUTH LOBE, STILL NEED DWV AT ALL W/C/LAV COMBOS, INSPECTED STACKS PAINTED GREEN AT BASE | LEE | LEE | | PTO | P | 2923641 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 09/21/2005 | MISC. DWV ONLY S/W CORNER LOWER LEVEL AND 1ST FLOOR S/W CORNER, HORIZ DRY VENT ON W/C, MISSING SUPPORT ON DWV IN A FEW PLACES, VENTING UNDERSIZED TWO PLACES S/W CORNER IN BSMT, CHANGE TEST TEE TO TAP TEE AT SURGICAL SINK | LEE | LEE | | PTO | P | 2923634 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 06/22/2005 | 1/2 BATH AND F/S IN C.U.P BUILDING OK | LEE | LEE | | PB | P | 2923624 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 06/20/2005 | MISC. SINKS, RESTROOMS AND SHOWER NEAR KITCHEN AREA OK, (SEE CLOUDED AREAS ON PLANS) | LEE | LEE | | PB | P | 2923617 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 06/10/2005 | MISC SINKS, STAFF BATH AND LOCKER ROOM AREA "A" OK, (SEE PLANS FOR HIGH LITE), PVC GREASE WASTE IN QUESTION (SIX STORIES ABOVE) | LEE | LEE | | PB | P | 2923609 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 06/07/2005 | CUP BUILDING LESS 1/2 BATH OK, NO WATER YET | JEFF | JEFF | | PB | P | 2923601 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 06/06/2005 | 6" NORTH WING COMPLETE LESS KITCHEN | JEFF | JEFF | | PB | P | 2923595 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 06/06/2005 | 10" AT MED GAS B946 OK | JEFF | JEFF | | PRD | P | 2923588 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/26/2005 | SHOP B306- MECHANICAL ROOM B914 LESS EOL FS | JEFF | JEFF | | PB | P | 2923580 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 05/24/2005 | 6" AT B687 OUT, 10" AT B332 OUT | JEFF | JEFF | | PRD | P | 2923576 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/24/2005 | PREP B406, TOILET B405, BREAK B404, PROCESS PACKING B502 COMPLETE | JEFF | JEFF | | PB | P | 2923566 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/20/2005 | SCRUB 925C-PACKING 502 LESS S/FS/FCO, SCOPE CLEANING B682-COFFE B709 | JEFF | JEFF | | PB | P | 2923559 |
HEATING & PLUMBING ENGINEERS, INC | PRD | P | 05/20/2005 | NE 8" BELOW SLAB OK | JEFF | JEFF | | PRD | P | 2923551 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/18/2005 | MS B108/OFFICE B636/SCRUB B922A/LOUNGE B6741/BATHROOMS 675A-678A | JEFF | JEFF | | PB | P | 2923543 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/13/2005 | LINE M EAST COMPLETE | JEFF | JEFF | | PB | P | 2923534 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/12/2005 | CORRIDORE TO SCRUB B925A AND REST ROOMS B629/B600 | JEFF | JEFF | | PB | P | 2923526 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/10/2005 | ALL 8 AND 10 INCH TRUNKLINE IN AND TESTED, FIRST 20 FEET OF 6'' IN AND TESTED, FITTINGS CHANGED FROM PREVIOUS INSPECTION AND OK | JACK | JACK | | PB | P | 2923518 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 05/06/2005 | INVERTED CLOSET RISER AT B131, CRACKED FITTING AT B753, TRUNK LINES AND BRANCHES OK TO CORRIDOR B918 | JEFF | JEFF | | PB | P | 2923510 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 04/21/2005 | EREA C COMPLETE, INFORMED CONTRACTOR THAT PERMIT FOR TRUNK LINES ONLY | JEFF | JEFF | | PB | P | 2923506 |
J. E. DUNN CONSTRUCTION COMPANY | V= | C | 03/22/2007 | OTIS--ALL ITEMS CORRECTED | TOM | TOM | | V= | C | 2926804 |
J. E. DUNN CONSTRUCTION COMPANY | V= | P | 02/23/2007 | OTIS--ELEV #1--PHONE INOP--#7--H/W PENE--M/R DOOR SIGNS FOR ALL M/R--LABEL ALL CAR LIGHT DISCONNECTS--SUMP REQUIREMENTS--FIRE FINAL OK | TOM | TOM | | V= | P | 2926799 |
J. E. DUNN CONSTRUCTION COMPANY | V= | P | 02/22/2007 | ELEV # 7--2 STOP--GEN II---FIRE SEAL H/W PENE | TOM | TOM | | V= | P | 2926791 |
J. E. DUNN CONSTRUCTION COMPANY | V= | P | 02/08/2007 | OTIS GEN II TRACTION--ELEV'S 1-2-3--M/R PENETRATIONS--PHONES--OPEN ELEC JUNCTION BOXES IN M/R--110V LIGHTING IN OVERHEAD--FIRE EXTINGUISHER @ M/R--SUMP PIT W/ PUMP ETC--FIRE FINAL--ELEV'S 4-5-6--M/R SPRINKLED--SCREENS ON M/R DAMPERS--FLUSH COVER ON SUMP PIT--FIRE FINAL--ELEV 7 NOT READY FOR INSP YET | TOM | TOM | | V= | P | 2926783 |