J. C. FELDMAN CONSTRUCTION | B= | C | 12/02/2005 | | CLOVIS | CLOVIS | | B= | C | 3091163 |
J. C. FELDMAN CONSTRUCTION | BFR | C | 12/02/2005 | | CLOVIS | CLOVIS | | BFR | C | 3091155 |
J. C. FELDMAN CONSTRUCTION | BFR | P | 10/03/2005 | PENDING SHELL FINAL; NO FURTHER INSPECTIONS UNTIL SHELL HAS BEEN FINALED, INCLUDING FOUNTAIN FIRE DEPT | CLOVIS | CLOVIS | | BFR | P | 3091149 |
FOSTER ELECTRIC CORPORATION | E= | C | 11/21/2005 | | RED | RED | | E= | C | 3091088 |
FOSTER ELECTRIC CORPORATION | E= | R | 11/18/2005 | NOT READY | TIMA | TIMA | | E= | R | 3091081 |
FOSTER ELECTRIC CORPORATION | ER | C | 11/18/2005 | CEILINGS OK | TIMA | TIMA | | ER | C | 3091073 |
FOSTER ELECTRIC CORPORATION | ER | R | 11/17/2005 | TILES DROPPED AT ENDS OF FIXTURES REMOVE,SUPPORT MC & FLEX FEW AREAS,FIRE CAULK PENETRATIONS IN FIREWALL | TIMA | TIMA | | ER | R | 3091066 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/30/2005 | WALLS OK CHECK DIALYSIS TABLES WIRING METHOD | TIMA | TIMA | | ER | P | 3091059 |
FOSTER ELECTRIC CORPORATION | ESL | C | 09/06/2005 | SLAB OK | TIMA | TIMA | | ESL | C | 3091051 |
CHUCK STEINHAUSER | H= | C | 11/16/2005 | | JIMV | JIMV | | H= | C | 3091141 |
BUSCH MANNS MECHANICAL, LLC | H= | C | 11/14/2005 | | JIMV | JIMV | | H= | C | 3091118 |
CHUCK STEINHAUSER | HO | P | 10/27/2005 | THIS INSPECTION NEEDS TO BE PULLED UNDER SHELL PERMIT #F52087, 10# TEST 1" LINE OK. | JIMV | JIMV | | HO | P | 3091134 |
BUSCH MANNS MECHANICAL, LLC | HC | C | 10/27/2005 | | JIMV | JIMV | | HC | C | 3091109 |
CHUCK STEINHAUSER | HI | C | 10/12/2005 | MED. PRESSURE GAS TITE SYSTEM, REVISE PLANS BY FINAL. | JIMV | JIMV | | HI | C | 3091127 |
BUSCH MANNS MECHANICAL, LLC | HV | C | 09/30/2005 | | JIMV | JIMV | | HV | C | 3091102 |
BUSCH MANNS MECHANICAL, LLC | HD | P | 09/30/2005 | TRUNKS & LATERALS OK, NEED MUA FOR ROOM 112. | JIMV | JIMV | | HD | P | 3091094 |
MARQUEZ CONSTRUCTORS, INC. | P= | C | 11/16/2005 | | JIMV | JIMV | | P= | C | 3091221 |
MARQUEZ CONSTRUCTORS, INC. | PTO | C | 10/20/2005 | | JIMV | JIMV | | PTO | C | 3091212 |
MARQUEZ CONSTRUCTORS, INC. | PTO | P | 09/29/2005 | COMPLETE H2O IN CIELING | JOEL | JOEL | | PTO | P | 3091205 |
MARQUEZ CONSTRUCTORS, INC. | PTO | P | 09/28/2005 | BATHROOM GROUP AND ISLAND SINKS DWV AND H20 O.K, NEEDS TEST INTERIOR DWV AND H20 MAINS IN CIELING | JOEL | JOEL | | PTO | P | 3091197 |
MARQUEZ CONSTRUCTORS, INC. | PB | C | 09/02/2005 | | JACK | JACK | | PB | C | 3091189 |
MARQUEZ CONSTRUCTORS, INC. | PB | P | 08/31/2005 | DWV OK. | JIMV | JIMV | | PB | P | 3091181 |