HAMMERS CONSTRUCTION, INC | B= | C | 09/21/2005 | COMPLETE | RICH | RICH | | B= | C | 3101144 |
HAMMERS CONSTRUCTION, INC | B= | P | 09/20/2005 | NEED SUITE # 100 POSTED ON FRONT | JOHNP | JOHNP | | B= | P | 3101136 |
HAMMERS CONSTRUCTION, INC | BFR | C | 09/16/2005 | ABOVE GRID OK | RICH | RICH | | BFR | C | 3101129 |
HAMMERS CONSTRUCTION, INC | BFR | P | 08/22/2005 | WALLS OK,OTHER ROUGHS | RICH | RICH | | BFR | P | 3101122 |
HAMMERS CONSTRUCTION, INC | BFR | P | 08/22/2005 | WALLS OK, OTHER ROUGHS | RICH | RICH | | BFR | P | 3101115 |
HAMMERS CONSTRUCTION, INC | BSP | T | 08/05/2005 | PAID (REC#656624)ADDITIONAL PLAN REVIEW TIME: $50.000 From: RUSSELL revised water heater per health, gas fired & comb. air | RUSSELL | RUSSELL | | BSP | T | 3101108 |
FOSTER ELECTRIC CORPORATION | E= | C | 09/14/2005 | | MIKEC | MIKEC | | E= | C | 3101219 |
FOSTER ELECTRIC CORPORATION | E= | P | 09/07/2005 | NEED PERMIT NUMBER FOR NEW CAFE? THAT IS GOING IN THIS SPACE | JERRY | JERRY | | E= | P | 3101212 |
FOSTER ELECTRIC CORPORATION | EP | C | 08/31/2005 | SUB PANEL | JERRY | JERRY | | EP | C | 3101202 |
FOSTER ELECTRIC CORPORATION | ES | P | 08/29/2005 | COMMERCIAL SERVICE: WIRE NOT PULLED TO SUB-PANEL | MIKEC | MIKEC | | ES | P | 3101196 |
FOSTER ELECTRIC CORPORATION | ER | P | 08/23/2005 | GRID CEILING EXCEPT OVER SUB PANEL | JERRY | JERRY | | ER | P | 3101189 |
FOSTER ELECTRIC CORPORATION | ES | P | 08/23/2005 | COMMERCIAL SERVICE: UPGRADE SERVICE FOR EXISTING STRIP MALL,THE CONTRACTOR WILL COMPLETE THE WORK AFTER YOU TURN THE POWER OFF ON FRIDAY? AND I WILL DO A COMPLETE REINSPECTION ON MONDAY,OK TO SET METERS | JERRY | JERRY | | ES | P | 3101180 |
FOSTER ELECTRIC CORPORATION | ER | P | 08/22/2005 | WALLS | JERRY | JERRY | | ER | P | 3101172 |
FOSTER ELECTRIC CORPORATION | ES | P | 08/17/2005 | COMMERCIAL SERVICE: 4-WIRE UNDERGROUND,120/208,3 DISCONNECTS AND 3 METERS,#100 IS 200 AMP,#110 IS 400 AMP WITH CT METER,#120 IS 400 WITH CT METER,UPGRADE FOR NEW RETAIL SPACES,POWER TO BE SHUT DOWN ON SUNDAY,OK TO RERECONNECT,MET WITH CONTRACTOR AND I WILL DO A COMPLETE INSPECTION ON MONDAY | JERRY | JERRY | | ES | P | 3101164 |
FOSTER ELECTRIC CORPORATION | ESL | P | 08/08/2005 | REAR AREA SLAB ---------UNIT NUMBERS ON BUILDING BEFORE NEXT INSPECTION----------- | JERRY | JERRY | | ESL | P | 3101159 |
CONTRACT MECHANICAL SVC INC | H= | C | 09/15/2005 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 3101049 |
CONTRACT MECHANICAL SVC INC | HC | C | 08/24/2005 | OK FOR METER. | LYNNS | LYNNS | | HC | C | 3101034 |
CONTRACT MECHANICAL SVC INC | HI | C | 08/24/2005 | 10# TEST AND SIZE OK. | LYNNS | LYNNS | | HI | C | 3101041 |
CONTRACT MECHANICAL SVC INC | P= | C | 09/20/2005 | | LEE | LEE | | P= | C | 3101101 |
CONTRACT MECHANICAL SVC INC | PTO | C | 08/18/2005 | CHECK AAV AT PREP SINK ON FINAL | LEE | LEE | | PTO | C | 3101094 |
CONTRACT MECHANICAL SVC INC | PTO | C | 08/18/2005 | | LEE | LEE | | PTO | C | 3101087 |
CONTRACT MECHANICAL SVC INC | PB | C | 08/10/2005 | | LEE | LEE | | PB | C | 3101080 |
CONTRACT MECHANICAL SVC INC | PB | P | 08/08/2005 | RUSS CHECKING ON PREP SINK AND D/W DRAINAGE REQUIREMENTS | LEE | LEE | | PB | P | 3101070 |
CONTRACT MECHANICAL SVC INC | PB | C | 08/08/2005 | | LEE | LEE | | PB | C | 3101065 |
CONTRACT MECHANICAL SVC INC | PB | C | 07/26/2005 | ADD W/H TO PERMIT FIXTURE LIST | LEE | LEE | | PB | C | 3101058 |