CMG CORP | B= | C | 11/09/2005 | COMPLETE | RICH | RICH | | B= | C | 3134340 |
CMG CORP | B= | P | 11/04/2005 | PARTIAL FINAL, OTHER FINALS REQUIRED | RICH | RICH | | B= | P | 3134332 |
CMG CORP | BFR | P | 10/11/2005 | WALLS , SOFFIT , GRID OK, OTHER ROUGHS | RICH | RICH | | BFR | P | 3134322 |
CMG CORP | BFR | P | 09/26/2005 | WALLS OK, OTHER ROUGHS | RICH | RICH | | BFR | P | 3134316 |
KENNY ELECTRIC SERVICE, INC. | E= | C | 11/04/2005 | | MATTHEW | MATTHEW | | E= | C | 3134276 |
KENNY ELECTRIC SERVICE, INC. | E= | R | 11/03/2005 | CHANGE BKR FOR WALK IN COOLER CONDENSING UNIT ON ROOF TO 25 AMP, INSTALL DISCONNECTS FOR THE 2 SIGNS. | DEAN | DEAN | | E= | R | 3134268 |
KENNY ELECTRIC SERVICE, INC. | ER | C | 10/17/2005 | | MIKEC | MIKEC | | ER | C | 3134261 |
KENNY ELECTRIC SERVICE, INC. | ER | P | 10/06/2005 | WALLS + SOFFIT. | RON | RON | | ER | P | 3134252 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 11/07/2005 | HVAC FINAL. | LYNNS | LYNNS | | H= | C | 3134308 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | R | 11/04/2005 | NO GAS VALVE INTERLOCK YET. | LYNNS | LYNNS | | H= | R | 3134300 |
W. W. RESTAURANT EQUIP., INC. | H= | C | 11/04/2005 | HRP FINAL. | LYNNS | LYNNS | | H= | C | 3134430 |
W. W. RESTAURANT EQUIP., INC. | HRP | C | 11/04/2005 | REF. LINES, CONDENSER AND WALK-IN COOLER OK. | LYNNS | LYNNS | | HRP | C | 3134424 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 11/03/2005 | NEED TO SEE INTERLOCK ON OVEN GAS AND HOOD. | LYNNS | LYNNS | | H= | P | 3134292 |
O' DONNELL PLUMBING | H= | C | 11/02/2005 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 3134376 |
O' DONNELL PLUMBING | H= | P | 11/01/2005 | NEED TO SEE RESTRAINTS ON MOBILE EQUIPTMENT. | LYNNS | LYNNS | | H= | P | 3134369 |
O' DONNELL PLUMBING | HC | C | 11/01/2005 | OK FOR METER. | LYNNS | LYNNS | | HC | C | 3134362 |
O' DONNELL PLUMBING | HI | C | 11/01/2005 | 10# TEST AND DESIGN PER APPROVED PLANS. | LYNNS | LYNNS | | HI | C | 3134354 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 10/28/2005 | | JACK | JACK | | HD | C | 3134284 |
O' DONNELL PLUMBING | P= | C | 11/04/2005 | | JACK | JACK | | P= | C | 3134416 |
O' DONNELL PLUMBING | PTO | C | 11/04/2005 | | JACK | JACK | | PTO | C | 3134408 |
O' DONNELL PLUMBING | PTO | P | 10/14/2005 | WALLS OK, 3/4" CHANGED TO 1" IN WALL ONLY, WILL STILL NEED PLANS REVISED TO SHOW WATER PIPE CHANGES | LEE | LEE | | PTO | P | 3134400 |
O' DONNELL PLUMBING | PTO | P | 10/11/2005 | WATER PIPE SIZING ISSUES, SEE PLANS, NEED 1" TO W/H AND TO TEE AT MOP SINK (HOT AND COLD), DWV TESTS OK, ALSO NEED VTR 1-3" & 1- 2" | LEE | LEE | | PTO | P | 3134392 |
O' DONNELL PLUMBING | PB | C | 09/30/2005 | USE HUB DRAIN VENT FOR HAND SINK DRAIN (4- VENTS TOGETHER, ONE ON NORTH END IS HUB/DRAIN VENT), WILL CHECK ON PTO. | LEE | LEE | | PB | C | 3134384 |