D.E. HARVEY BUILDERS | B= | C | 10/30/2006 | | BOBB | BOBB | | B= | C | 3131981 |
D.E. HARVEY BUILDERS | B= | P | 10/28/2006 | Temp CO: SEE COMMENTS ENTERED BY FRANK A. | DAVEL | DAVEL | | B= | P | 3131604 |
D.E. HARVEY BUILDERS | B= | P | 08/31/2006 | 1.HANDRAIL NEEDED @ FRONT ENTRANCE STEPS AND REAR ANDICAP RAMP (IF HANDICAP RAMP EXCEEDS 6" IT REQUIRES HANDRAILS AND CLEARANCE BETWEEN HANDRAILS MUST BE 36" 2. NEED SIGN ABOVE FRONT DOOR " THIS DOOR TO BE UNLOCKED AT ALL TIMES. 3 CONFERENCE ROOMS NEED " OCCUPANT LOAD SIGN. 4.SEAL EXTERIOR PENETRATION ON WEST END. 5. NEED OTHER FINALS. 6. SLOPES ON NON-ENCLOSED RAMP EXCEEDS ALLOWED PERCENTAGE | MELANIE | MELANIE | | B= | P | 3131973 |
D.E. HARVEY BUILDERS | B= | P | 08/31/2006 | HANDRAILS NEEDED AT FRONT AND REAR STAIRS AND MAY NEED INTERMEDIATES/SEAL EXTERIOR/HANDRAILS AT HANDICAP RAMPS /DOOR TO REMAIN OPEN SIGNS/OCCUPANT LOAD SIGNS AT A-3 OCCUPANCIES/HANDRAIL EXTENSIONS NEEDED/OTHER FINALS/HANDRAILS AT RAMPS THAT EXCEED SLOPES AT HANDICAP AND PUBLIC ACCESS,S/ADDRESS WAS POSTED AT TIME OF DEPARTURE/ | FRANK | FRANK | | B= | P | 3131964 |
D.E. HARVEY BUILDERS | B= | P | 08/31/2006 | SEE COMMENTS ENTERED BY FRANK A. | BOBB | BOBB | | B= | P | 3131956 |
D.E. HARVEY BUILDERS | BFR | C | 08/07/2006 | OK REMAINING FRAMING FOR ENTRY SOFFITS . | BOBB | BOBB | | BFR | C | 3131948 |
D.E. HARVEY BUILDERS | BLA | C | 08/07/2006 | | BOBB | BOBB | | BLA | C | 3131941 |
D.E. HARVEY BUILDERS | BLA | R | 08/06/2006 | LATH NOT COMPLETED. | BOBB | BOBB | | BLA | R | 3131932 |
D.E. HARVEY BUILDERS | BFR | P | 07/11/2006 | FRAMING OK FOR 3- ROOMS , 2ND FLOOR AT EAST SIDE. | BOBB | BOBB | | BFR | P | 3131924 |
D.E. HARVEY BUILDERS | BSP | R | 06/27/2006 | NEED ELECTRIC & MECHANICL INSPECTIONS FOR LOBBY AREAS / CONSTRUCTION OFFICE CLOSED AT 12:27 PM. | BOBB | BOBB | | BSP | R | 3131916 |
D.E. HARVEY BUILDERS | BSP | P | 06/23/2006 | OK ABOVE CEILING , EAST & WEST WINGS. | BOBB | BOBB | | BSP | P | 3131909 |
D.E. HARVEY BUILDERS | BSP | P | 06/19/2006 | OK ABOVE CEILING , 1ST FLOOR , EAST & WEST WINGS. | BOBB | BOBB | | BSP | P | 3131901 |
D.E. HARVEY BUILDERS | BFR | P | 05/24/2006 | OK 2ND FLOOR CEILING AT WEST FOYER. | BOBB | BOBB | | BFR | P | 3131893 |
D.E. HARVEY BUILDERS | BFR | P | 05/10/2006 | OK FRAMING FOR SOFFITS AT NORTH ENTRY CORRIDOR. | BOBB | BOBB | | BFR | P | 3131885 |
D.E. HARVEY BUILDERS | BFR | P | 04/25/2006 | OK 2ND FLOOR EAST SIDE , INTERIOR WALLS | BOBB | BOBB | | BFR | P | 3131877 |
D.E. HARVEY BUILDERS | BFR | R | 04/14/2006 | NEED ELECTRIC ROUGH INSPECTION FOR WALLS ON 1ST FLOOR , SOUTH EAST AREA . WALLS NOT READY FOR INSPECTION. | BOBB | BOBB | | BFR | R | 3131868 |
D.E. HARVEY BUILDERS | BIN | R | 04/14/2006 | WALLS NOT READY | BOBB | BOBB | | BIN | R | 3131860 |
D.E. HARVEY BUILDERS | BIN | R | 04/13/2006 | CONSTRUCTION OFFICE LOCKED AT 12:30 PM | BOBB | BOBB | | BIN | R | 3131852 |
D.E. HARVEY BUILDERS | BFR | R | 04/13/2006 | CONSTRUCTION OFFICE LOCKED AT 12:30. | BOBB | BOBB | | BFR | R | 3131844 |
D.E. HARVEY BUILDERS | BFR | P | 04/11/2006 | OK WALLS WEST HALF OF BUILDING / CORE FRAME OK WITH ELECTRIC INSPECTION. | BOBB | BOBB | | BFR | P | 3131836 |
D.E. HARVEY BUILDERS | BIN | P | 04/11/2006 | OK 2ND FLOOR EXTERIOR WALLS | BOBB | BOBB | | BIN | P | 3131828 |
D.E. HARVEY BUILDERS | BFR | P | 03/29/2006 | FRAME OK WITH ROUGH INSPECTION / OK 2ND FLOOR WQLLS; A TO G ON 1 LINE / A TO G ON 4 LINE / 1 TO 4 ON A LINE . OK 1ST FLOOR INTERIOR WALLS; A TO C.5 BETWEEN 3 & 4 LINES. | BOBB | BOBB | | BFR | P | 3131820 |
D.E. HARVEY BUILDERS | BIN | P | 03/29/2006 | NEED ELECTRIC ROUGH INSPECTION. | BOBB | BOBB | | BIN | P | 3131813 |
D.E. HARVEY BUILDERS | BIN | P | 03/24/2006 | OK INSULATION FOR EAST ENTRY VESTIBUELE & WEST ENTRYWAY. | BOBB | BOBB | | BIN | P | 3131805 |
D.E. HARVEY BUILDERS | BFR | P | 03/24/2006 | OK EAST ENTRY VESTIBUELE & WEST ENTRYWAY. | BOBB | BOBB | | BFR | P | 3131796 |
D.E. HARVEY BUILDERS | BIN | P | 03/17/2006 | WALLS OK , J TO P ON 1 LINE / 1 TO 2 & 3 TO 4 ON P LINE / J TO P ON 4 LINE. | BOBB | BOBB | | BIN | P | 3131788 |
D.E. HARVEY BUILDERS | BFR | P | 03/15/2006 | OK INTERIOR WALLS; SECTION B E TO J LINES & 1 TO 4 LINES / OK EXTERIOR WALLS; J TO P ON 1 , J TO P ON 4 & 1 TO 2 ON P & 3 TO 4 ON P LINE. | BOBB | BOBB | | BFR | P | 3131781 |
D.E. HARVEY BUILDERS | BIN | P | 03/03/2006 | OK EXTERIOR WALL INSULATION AT SECTION A EXCEPT ENTRY AT WEST WALL. | BOBB | BOBB | | BIN | P | 3131772 |
D.E. HARVEY BUILDERS | BFR | P | 02/28/2006 | METAL STUD SCREWS REMOVED FROM SLIP TRACK AT SECTION A. | BOBB | BOBB | | BFR | P | 3131764 |
D.E. HARVEY BUILDERS | BFR | P | 02/27/2006 | OK EXTERIOR WALLS ; A TO F.5 ON 1 & 4 LINES. | BOBB | BOBB | | BFR | P | 3131754 |
D.E. HARVEY BUILDERS | BSP | P | 02/13/2006 | | BOBB | BOBB | | BSP | P | 3131746 |
D.E. HARVEY BUILDERS | BSP | P | 02/01/2006 | OK REMAINING STRUCTURAL FLOOR FOR WEST HALF OF GROUND FLOOR AT PERIMETER WALLS. FLOOR AREA WAS BLOCKED OUT TO SET POURED IN PLACE WALL PANELS. | BOBB | BOBB | | BSP | P | 3131738 |
D.E. HARVEY BUILDERS | BSP | P | 01/11/2006 | OK REINFORCEMENT STEEL FOR PANELS; # 49, 31 , & SP-1 | BOBB | BOBB | | BSP | P | 3131728 |
D.E. HARVEY BUILDERS | BSP | P | 01/03/2006 | OK REINFORCEMENT STEEL FOR PANELS #'S ; 27, 29, 30, 32, 24, 21, 43, 44, 45, 34, 41, 42, 65, 52, 59, 25, 13, & # 3 . | BOBB | BOBB | | BSP | P | 3131720 |
D.E. HARVEY BUILDERS | BSP | P | 12/28/2005 | LAST SLAB OK | ANDY | ANDY | | BSP | P | 3131712 |
D.E. HARVEY BUILDERS | BSP | P | 12/19/2005 | OK REINFORCEMENT STEEL FOR PANELS; # 33, 35, 37, 38, 39, 40, 47, 48, 50, 51, 52, & 53. | BOBB | BOBB | | BSP | P | 3131704 |
D.E. HARVEY BUILDERS | BSP | P | 12/13/2005 | OK REINFORCEMENT STEEL FOR PANELS #'S ; 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 17, 18, 19, 21, 22, & 29. | BOBB | BOBB | | BSP | P | 3131696 |
D.E. HARVEY BUILDERS | BSP | P | 11/30/2005 | OK REINFORCEMENT STEEL FOR PANEL #'S ; 54, 55, 56, 57, & 58 | BOBB | BOBB | | BSP | P | 3131688 |
D.E. HARVEY BUILDERS | BSP | P | 11/29/2005 | OK REINFORCEMENT STEEL FOR PANEL #'S; 60, 61, 62, 63, 64, 66, 67 , 1, & 2 | BOBB | BOBB | | BSP | P | 3131681 |
D.E. HARVEY BUILDERS | BSP | P | 11/17/2005 | OK STRUCTURAL FLOOR; G.5 TO P LINE , EXCEPT M TO P BETWEEN 2 & 3 LINE | BOBB | BOBB | | BSP | P | 3131673 |
D.E. HARVEY BUILDERS | BSP | P | 11/10/2005 | OK STRUCTURAL FLOOR; A TO G.5 LINE. | BOBB | BOBB | | BSP | P | 3131665 |
D.E. HARVEY BUILDERS | BFN | C | 11/02/2005 | OK REMAINING INTERIOR PAD & WEST WALL EXSTENTION. | BOBB | BOBB | | BFN | C | 3131657 |
D.E. HARVEY BUILDERS | BFN | P | 10/27/2005 | OK WEST & EAST END OF BUILDING / OK SOUTH ENTRY WALLS | BOBB | BOBB | | BFN | P | 3131649 |
D.E. HARVEY BUILDERS | BFN | P | 10/24/2005 | OK ELEVATOR SHAFT WALLS. | BOBB | BOBB | | BFN | P | 3131641 |
D.E. HARVEY BUILDERS | BFN | P | 10/20/2005 | OK INTERIOR PADS; F TO N ON 3 LINE & G TO N ON 2 LINE. | BOBB | BOBB | | BFN | P | 3131633 |
D.E. HARVEY BUILDERS | BFN | P | 10/19/2005 | OK ; A. 75 TO G ON 4 LIKNE. | BOBB | BOBB | | BFN | P | 3131626 |
D.E. HARVEY BUILDERS | BFN | P | 10/18/2005 | OK INTERIOR PADS; B TO F ON 2 LINE & B TO E ON 3 LINE. | BOBB | BOBB | | BFN | P | 3131618 |
D.E. HARVEY BUILDERS | BFN | P | 10/14/2005 | OK BEAM; A.75 TO N.75 ON 1 LINE & H TO N.75 ON 4 LINE. | BOBB | BOBB | | BFN | P | 3131611 |
DYNALECTRIC COMPANY | E= | P | 10/01/2006 | Temp CO: FIRST FLOOR EAST SIDE ONLY; EXCEPT ELECTRICAL ROOM | DAVEL | DAVEL | | E= | P | 3131237 |
DYNALECTRIC COMPANY | E= | C | 09/01/2006 | | RON | RON | | E= | C | 3131496 |
DYNALECTRIC COMPANY | E= | P | 08/30/2006 | NEEDS PANELS MARKED WITH VOLTAGES + COLOR CODED.SHUNT TRIP REQUIRED FOR ELEVATOR,CALL LES ON ELEVATOR 491-3688 | RON | RON | | E= | P | 3131489 |
DYNALECTRIC COMPANY | E= | P | 08/29/2006 | FIRST FLOOR EAST SIDE ONLY; EXCEPT ELECTRICAL ROOM | JOSEPH | JOSEPH | | E= | P | 3131482 |
DYNALECTRIC COMPANY | ER | P | 08/11/2006 | 2ND FLOOR WALLS AND CEILING AS MARKED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131476 |
DYNALECTRIC COMPANY | ER | P | 08/07/2006 | FIRST FLOOR VESTUBLE | JOSEPH | JOSEPH | | ER | P | 3131463 |
DYNALECTRIC COMPANY | ER | P | 07/27/2006 | 2ND FLOOR RECESSED FIXTURES; AS MARKED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131456 |
DYNALECTRIC COMPANY | ER | P | 07/14/2006 | WALLS ON 2ND FLOOR EAST AND MARKED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131452 |
DYNALECTRIC COMPANY | ER | P | 06/27/2006 | EXTERIOR SOFFITS ON N. AND S. SIDE ONLY | JOSEPH | JOSEPH | | ER | P | 3131444 |
DYNALECTRIC COMPANY | ER | P | 06/22/2006 | SECOND FLOOR EAST CEILING ONLY | JOSEPH | JOSEPH | | ER | P | 3131437 |
DYNALECTRIC COMPANY | ER | P | 06/21/2006 | 2ND FLOOR CEILING WEST OF LOBBY | JOSEPH | JOSEPH | | ER | P | 3131430 |
DYNALECTRIC COMPANY | ER | P | 06/15/2006 | FIRST FLOOR WEST SIDE CEILING ONLY | JOSEPH | JOSEPH | | ER | P | 3131423 |
DYNALECTRIC COMPANY | ER | P | 06/14/2006 | CEILING AND FIRE ALARM ON FIRST FLOOR EAST ONLY | JOSEPH | JOSEPH | | ER | P | 3131416 |
DYNALECTRIC COMPANY | ER | R | 06/05/2006 | MISSING SCREWS AND OR HURICANE CLIPS ON ALL FIXTURES | JOSEPH | JOSEPH | | ER | R | 3131408 |
DYNALECTRIC COMPANY | ER | L | 06/01/2006 | | JOSEPH | JOSEPH | | ER | L | 3131401 |
DYNALECTRIC COMPANY | ER | P | 05/24/2006 | AS SHOWN ON APPROVED SET AND MARKED ON INSPECTION CARD LOG | JOSEPH | JOSEPH | | ER | P | 3131395 |
DYNALECTRIC COMPANY | ER | P | 05/16/2006 | ALL SUBPANELS AND TRANSFORMERS OK EXCEPT LDP ON 1ST FLOOR; STILL NEED TO SEE INSIDE GUTTER | JOSEPH | JOSEPH | | ER | P | 3131387 |
DYNALECTRIC COMPANY | ES | P | 05/15/2006 | COMMERCIAL SERVICE: 2000 AMP 480 VOLT SERVICE BY DYNA OK TO SET METER; CONTRACTOR STILL NEEDS TO PROVIDE INFO ON MAIN GFCI DISCONNECT THAT IS WAS TESTED (NEED TO HAVE BY FINAL) ONLY THE MAIN DISTRUBUTION ROOM WAS INSPECTED; STILL NEED TO SEE SEPERATE ELECTRICAL ROOMS | JOSEPH | JOSEPH | | ES | P | 3131380 |
DYNALECTRIC COMPANY | ER | P | 05/12/2006 | HARD LIDS AS MARKED ON APPROVED SET; POC IS CHARLIE 4991906!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! | JOSEPH | JOSEPH | | ER | P | 3131372 |
DYNALECTRIC COMPANY | ER | P | 05/10/2006 | WALLS ON 2ND FLOOR AND SOFFITS ON 1ST FL AS HIGHLIGHTED AND DATED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131365 |
DYNALECTRIC COMPANY | ER | P | 05/08/2006 | WALLS AS HIGHLIGHTED AND DATED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131359 |
DYNALECTRIC COMPANY | ER | P | 05/02/2006 | SECOND FLOOR WALLS, SEE MARKED PRINTS | THOMAS | THOMAS | | ER | P | 3131352 |
DYNALECTRIC COMPANY | ER | P | 04/24/2006 | WALLS 1ST FLOOR SOUTH EAST. AS HIGHLIGHED AND DATED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131343 |
DYNALECTRIC COMPANY | ESL | P | 04/20/2006 | NORTH AND SOUTH ENTRYS | MIKEC | MIKEC | | ESL | P | 3131337 |
DYNALECTRIC COMPANY | ER | P | 04/18/2006 | 1ST FL EAST WALLS AND HIGHLIGHTED IN GREEN ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131329 |
DYNALECTRIC COMPANY | ER | P | 04/13/2006 | WALLS ON SECOND FLOOR AND MARKED ON INSPECTION LOG CARD AND HIGHLIGHTED AND DATED ON APPROVED SET | JOSEPH | JOSEPH | | ER | P | 3131322 |
DYNALECTRIC COMPANY | ER | P | 04/11/2006 | PARTIAL WALLS AS HIGHLIGHTED IN GREEN SIGNED AND DATED ON APPROVED SET,ALSO NOTED ON INSPECTION LOG CARD | JOSEPH | JOSEPH | | ER | P | 3131315 |
DYNALECTRIC COMPANY | ER | P | 04/10/2006 | EAST,NORTH ,SOUTH PERIMITER WALLS TO COLUMN LINE K | TIMA | TIMA | | ER | P | 3131307 |
DYNALECTRIC COMPANY | ER | P | 04/05/2006 | SOFFITS AND WALLS BATH ROOMS AS MARKED ON PRINT AND ON ORANGE INS. CARD | RED | RED | | ER | P | 3131300 |
DYNALECTRIC COMPANY | ER | P | 04/04/2006 | WALLS ON 2ND FL ONLY AS HIGHLIGHTED AND DATED ON APPROVED SET; ALSO MARKED ON INSPECTION LOG CARD | JOSEPH | JOSEPH | | ER | P | 3131293 |
DYNALECTRIC COMPANY | ER | P | 03/27/2006 | WALLS AS HIGHLIGHTED AND DATED ON APPROVED SET OF PRINTS | JOSEPH | JOSEPH | | ER | P | 3131286 |
DYNALECTRIC COMPANY | ER | P | 03/08/2006 | ROOMS AS HIGHLIGHTED IN ORANGE ON ELECTRICAL CONTRACTOR'S PRINT AND RECORDED ON ORANGE INSPECTION CARD LOG | JOSEPH | JOSEPH | | ER | P | 3131280 |
DYNALECTRIC COMPANY | ER | P | 02/24/2006 | AS MARKED ON INSPECTION LOG CARD; AND HIGHLIGHTED IN YELLOW ON ELECTRICAL CONTRACTORS PRINT | JOSEPH | JOSEPH | | ER | P | 3131272 |
DYNALECTRIC COMPANY | EUG | P | 11/17/2005 | SECONDARY FEEDERS. | RON | RON | | EUG | P | 3131265 |
DYNALECTRIC COMPANY | ESL | P | 11/09/2005 | EAST +WEST OK. | RON | RON | | ESL | P | 3131259 |
DYNALECTRIC COMPANY | ESL | P | 11/02/2005 | WEST END, FEEDER CONDUITS. | RON | RON | | ESL | P | 3131250 |
DYNALECTRIC COMPANY | ESL | P | 10/28/2005 | | RON | RON | | ESL | P | 3131243 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/30/2006 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 3131164 |
MECHONE, INC. | H= | C | 08/30/2006 | BALANCE REPORT FROM PRECISION AIR BALANCE. | LYNNS | LYNNS | | H= | C | 3131596 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 08/28/2006 | NO SLEEVES ON GAS CONNECTORS THROUGH UNITS, GAS CONNECTORS 6 FEET MAX. | JACK | JACK | | H= | P | 3131157 |
MECHONE, INC. | H= | P | 08/24/2006 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3131588 |
MECHONE, INC. | H= | P | 06/29/2006 | 2ND FLOOR OK, STILL LACK LOBBY AND ELVATOR AREAS | JACK | JACK | | H= | P | 3131580 |
MECHONE, INC. | H= | P | 06/16/2006 | 1ST FLOOR OK EXCEPT LOBBY AND RESTROOMS | JACK | JACK | | H= | P | 3131572 |
MECHONE, INC. | HRP | C | 06/14/2006 | | JACK | JACK | | HRP | C | 3131563 |
MECHONE, INC. | HD | P | 04/24/2006 | OK TO INSULATE ALL | JACK | JACK | | HD | P | 3131547 |
OLSON PLUMBING & HEATING COMPANY | HC | C | 04/24/2006 | OK FOR METER | JACK | JACK | | HC | C | 3131149 |
OLSON PLUMBING & HEATING COMPANY | HI | C | 04/24/2006 | | JACK | JACK | | HI | C | 3131140 |
MECHONE, INC. | HD | P | 04/05/2006 | 2ND FLOOR WEST OF ELEVATOR SHAFT READY TO INSULATE | JACK | JACK | | HD | P | 3131540 |
MECHONE, INC. | HV | P | 04/05/2006 | NOT CORRECT INSPECTIOON FOR DUCT | JACK | JACK | | HV | P | 3131532 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 03/09/2006 | CONCEALED PIPE OK | JACK | JACK | | HI | P | 3131131 |
MECHONE, INC. | HD | P | 03/02/2006 | FIRST FLOOR DUCT READY TO INSULATE, MISSING VAV'S | JACK | JACK | | HD | P | 3131525 |
MECHONE, INC. | HD | P | 02/28/2006 | LINES A-G FIRST FLOOR READY TO INSULATE | JACK | JACK | | HD | P | 3131518 |
MECHONE, INC. | HV | P | 02/28/2006 | NO VENTS TO LOOK AT YET | JACK | JACK | | HV | P | 3131511 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 08/28/2006 | NO CARD, NO CONTRACTOR AND NO ONE IN TRAILER | MICK | MICK | | P= | C | 3131230 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 04/14/2006 | INSPECT WATER PIPE EAST MECHANICAL ROOM AT FINAL | JEFF | JEFF | | PTO | C | 3131222 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/13/2006 | CHECKED IN AT CONST OFFICE TO TRY AND LOCATE PLUMBERS..COULD NOT FIND THEM ON JOB OR LOCATE AREAS THAT WERE NEEDING TO BE RE- INSPECTED | TIM | TIM | | PTO | P | 3131214 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/31/2006 | LACKING WATER EAST RESTROOM GROUP ON 2ND FLOOR, LACKING WATER EAST MECH ROOM 1ST FLOOR, REST OK | JACK | JACK | | PTO | P | 3131208 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/09/2006 | RESTROOM GROUPS AND JANITORS ROOM DWV OK, LOWER FLOOR RESTROOM GROUP WATER OK | JACK | JACK | | PTO | P | 3131200 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 11/04/2005 | | JACK | JACK | | PB | C | 3131193 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/02/2005 | TRUNKLINES AND WATERSERVICE OK, LACKING LATERALS FOR RESTROOM GROUPS | JACK | JACK | | PB | P | 3131186 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/28/2005 | TRUNKLINE FROM WEST END TO M-LINE OK | JACK | JACK | | PB | P | 3131178 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/26/2005 | CLEAN OUTS LIMITED TO 135 DEGREE'S, TRUNKLINE FROM ELEVATOR PIT TO WEST END OK, PROCEED AT OWN RISK NO APPROVED PRINT ON SITE | JACK | JACK | | PB | P | 3131171 |
D.E. HARVEY BUILDERS | V= | C | 08/31/2006 | ELEVATOR FINAL OK --- ALL ITEMS CORRECTED | LES | LES | | V= | C | 3132029 |
D.E. HARVEY BUILDERS | V= | P | 08/24/2006 | SUMP ALARM NOT HOOKED UP --- FIREEXTINGUSHER OUTSIDE OF MACHINE ROOM --- FIRE CALK HOISTWAY --- LADDER IN PIT OBSTRUCTING CAR --- NEED FIER RECALL --- PHONE NOT PROGRAMED --- NEED SINAGE --- NEED SHUNT SWITCH FOR FIRE SPRINKLER IN MACHINE ROOM --- NEED DOOR CLOSER ON MACHINE ROOM DOOR | LES | LES | | V= | P | 3132019 |