GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/14/2006 | Temp CO: PARTIAL 1ST FLOOR- NEED OTHER FINAL INSPECTIONS COMPLETED/ MISSING FIRE CAULKING AT NUMEROUS ROOMS | DAVEL | DAVEL | | B= | P | 3220636 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/21/2006 | | BLAKE | BLAKE | | B= | C | 3221033 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/11/2006 | ALL OK, WAITING FOR FIRE DEPT FINAL SIGN-OFF | BLAKE | BLAKE | | B= | P | 3221027 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/04/2006 | 1ST AND 2ND FLOOR OK PENDING FIRE FINAL | BLAKE | BLAKE | | B= | P | 3221019 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/21/2006 | 4TH FLOOR- COMPLETE EAST DUCT SHAFT
PENTHOUSE- FIRECAULK 2 PENETRATIONS IN STAIRWELL | BLAKE | BLAKE | | B= | P | 3221011 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | C | 07/21/2006 | REC'D CERTIFICATE FOR CRAWL SPACE | BLAKE | BLAKE | | BIN | C | 3221004 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/19/2006 | PARTIAL- THIRD FLOOR OK PENDING OTHER TRADES/ 2ND FLOOR-FIRE CAULK OK AT WEST STAIRS/ 1ST FLOOR-FIRE CAULKING COMPLETE | BLAKE | BLAKE | | B= | P | 3220996 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 07/18/2006 | 2ND FLOOR- NEED OTHER FINALS COMPLETED/ POST OCCUPANT LOAD AT A-3 ASSEMBLY ROOM/ NEED GUARDRAIL AT NORTH PATIO/ FIRE CAULK PENETRATIONS AT WEST STAIRWAY | BLAKE | BLAKE | | B= | R | 3220984 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 07/17/2006 | PARTIAL 1ST FLOOR- NEED OTHER FINAL INSPECTIONS COMPLETED/ MISSING FIRE CAULKING AT NUMEROUS ROOMS | BLAKE | BLAKE | | B= | R | 3220978 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 07/13/2006 | CRAWLSPACE UNDER TOWER- NEED CERTIFICATE VERIFYING R-VALUE OF INSTALLATION | BLAKE | BLAKE | | BIN | P | 3220970 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/21/2006 | 4TH STORY SHAFT PENETRATIONS OK, REC'D UL DETAIL | BLAKE | BLAKE | | BFR | P | 3220962 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/20/2006 | 4TH FLOOR EAST ELEVATOR SHAFT PENETRATIONS MISSED AND NEED UL SHEET FOR INSULATON WRAPPED PIPE/ 4TH FLOOR INSULATION OK/ 1ST FLOOR ELEVATOR OK TO ROCK FACE WALL | BLAKE | BLAKE | | BFR | P | 3220954 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/14/2006 | REC'D ENG INSPECTION REPORT FOR WELD CONNECTIONS | BLAKE | BLAKE | | BFR | P | 3220946 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/02/2006 | FIRECAULKING OK AT WEST ENTRY 1ST FLOOOR; ELEVATIOR EQUIPMENT ROOM 1ST FLOOR AND WEST ENTRY AT EXISTING 1ST FLOOR OK | DANF | DANF | | BSP | P | 3220938 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/02/2006 | BOOK STORE SOFFET FRAMING OK; NEED 12" SPRINKLER PIPE FIRECAULKED AT EXISTING STRUCTURE AND WHERE ENTERS RATED CEILING IN NEW ADDITION | DANF | DANF | | BFR | P | 3220930 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 06/02/2006 | 3RD FLOOR EXTERIOR WALLS OK | DANF | DANF | | BIN | P | 3220922 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/19/2006 | FIRE CAULKING OK BOTH SIDES OF 1ST FLOOR 2-HOUR FIRE-RATED EXIT "TUNNEL" | BLAKE | BLAKE | | BSP | P | 3220916 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/17/2006 | 4TH FLOOR: ELEC ROOM/ 3RD FLOOR: EAST SHAFT CORE BOARD, ELEC ROOM, AND EAST SHAFT CORE BOARD | BLAKE | BLAKE | | BFR | P | 3220909 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/17/2006 | 3RD FLOOR WEST STAIRWELL OK | BLAKE | BLAKE | | BIN | P | 3220901 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/12/2006 | WEST STAIR WELL TO BOTTOM OF 3RD FLOOR | JIMP | JIMP | | BIN | P | 3220894 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/10/2006 | 2ND FLOOR WEST MECHANICAL SHAFT OK | BERTW | BERTW | | BSP | P | 3220885 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/09/2006 | 2ND FLOOR EAST MECH SHAFT OK; STILL NEED 2ND FLOOR WEST SHAFT FIRECAULK AND COMPLETE | DANF | DANF | | BFR | P | 3220878 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/05/2006 | 2ND FLOOR SHAFT WALL WEST END (CORE BOARD) OK / FIRECAULK UNISTRUTT PENITRATIONS ( SHOULD BE ABLE TO SEE FROM 3RD FLOOR) | ED | ED | | BFR | P | 3220870 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/03/2006 | 2ND LEVEL ABOVE CEILING INSULATION OK EXCEPT AT WEST WALL | BLAKE | BLAKE | | BSP | P | 3220861 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/03/2006 | 2ND FLOOR BATHROOM SHAFT WALL "CORE BOARD" OK, STILL NEED TO SEE PENETRATIONS FIRE CAULKED | BLAKE | BLAKE | | BFR | P | 3220854 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/24/2006 | 2ND FLOOR NORTH PATIO OK/ 1ST FLOOR AREA ABOVE DROPPED CEILING OK | BLAKE | BLAKE | | BIN | P | 3220847 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/24/2006 | 1ST LAYER OF DRYWALL OK AT 1ST FLOOR TWO-HOUR CORRIDOR TUNNEL | BLAKE | BLAKE | | BFR | P | 3220840 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/20/2006 | 2ND FLOOR- PARTIAL-NORTH WALL TO PATIO, WEST WALL TO STAIRWAY, SOUTH AND EAST OK | BLAKE | BLAKE | | BIN | P | 3220833 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/20/2006 | 1ST FLOOR 2 HOUR FIRE RATED CORRIDOR "TUNNEL"- 2 LAYERS OF DRYWALL OK ON TOP OF CEILING FRAMING | BLAKE | BLAKE | | BFR | P | 3220825 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/17/2006 | THROUGH PENETRATION FIRESTOPS OK BETWEEN 1ST AND 2ND FLOOR | BLAKE | BLAKE | | BSP | P | 3220817 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/17/2006 | 2ND FLOOR FRAMING OK | BLAKE | BLAKE | | BFR | P | 3220809 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/14/2006 | THROUGH PENETRATION FIRESTOPS OK FOR FLOOR-CEILING BETWEEN 1ST FLOOR AND CRAWLSPACE EXCEPT FOR SECTION OF ELEVATOR SHAFT/ REC'D COPIES OF FIRESTOP SYSTEMS | BLAKE | BLAKE | | BSP | P | 3220801 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 04/12/2006 | CANCELED IN FIELD | BLAKE | BLAKE | | BFR | R | 3220794 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/12/2006 | 1ST FLOOR WEST AND NORTH SIDE OK, ALSO NOTH SIDE OF "TUNNEL | BLAKE | BLAKE | | BIN | P | 3220787 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/05/2006 | 1ST FLOOR WALLS OK EXCEPT ELEVATOR, ELEVATOR EQUIP ROOM AND CORRIDOR "TUNNEL" | BLAKE | BLAKE | | BFR | P | 3220780 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/05/2006 | 1ST FLOOR- REMAINDER OF SOUTH WALL | BLAKE | BLAKE | | BIN | P | 3220629 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/04/2006 | 2ND FLOOR EXTERIOR PERIMETER FRAMING OK | BLAKE | BLAKE | | BFR | P | 3220769 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/03/2006 | A TO B LINE OK | BLAKE | BLAKE | | BIN | P | 3220761 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/03/2006 | A TO B LINE OK | BLAKE | BLAKE | | BFR | P | 3220753 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/30/2006 | 1ST FLOOR EXTERIOR WALLS OK TO INSULATE | BLAKE | BLAKE | | BFR | P | 3220745 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/22/2006 | PLUMBING PENTHOUSE INSULATION OK; STRUCTURAL COLUMN HAD TO BE MOVED FOR HVAC DUCT; WILL NEED FIX; NORTH SIDE OF PENTHOUSE | DANF | DANF | | BIN | P | 3220739 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/15/2006 | ROOFTOP AIR HANDLER DECK WALLS OK | BLAKE | BLAKE | | BIN | P | 3220727 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/14/2006 | SEE PAGE T3.1 ON APPROVED AREAS | BLAINE | BLAINE | | BFR | P | 3220716 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | C | 03/10/2006 | ENTIRE DRAIN COMPLETE | BLAKE | BLAKE | | BFD | C | 3220710 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 03/08/2006 | SOUTH SIDE OK | BLAKE | BLAKE | | BFD | P | 3220700 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 02/23/2006 | NORTHMOST SECTION DONE | BLAKE | BLAKE | | BFD | P | 3220692 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 02/22/2006 | ALL OF SE CORNER OK | BLAKE | BLAKE | | BFD | P | 3220684 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 02/21/2006 | SOUTH SIDE OF CONNECTOR OK | BLAKE | BLAKE | | BFD | P | 3220676 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 02/14/2006 | DRAIN UP TO NE CORNER OK | BLAKE | BLAKE | | BFD | P | 3220669 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | C | 02/09/2006 | REC'D ENG INSPECTION RREPORTS | BLAKE | BLAKE | | BFN | C | 3220661 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 02/08/2006 | FIRST SECTION WEST AROUND CORNER AND WEST 20' - OK / WILL INSTALL DRAIN BD. AND BACKFILL A SECTION AT A TIME | MICHAELA | MICHAELA | | BFD | P | 3220652 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 12/21/2005 | OK FOR ENGINEER TO INSP FOUNDATION SYSTEM AND PROVIDE REPORT TO RBD | DAVEL | DAVEL | | BFN | P | 3220645 |
WISE ELECTRIC, INC. | E= | C | 08/09/2006 | | GARY | GARY | | E= | C | 3221586 |
WISE ELECTRIC, INC. | E= | P | 07/12/2006 | PENTHOUSE, CRAWL SPACE, 4TH FLOOR | GARY | GARY | | E= | P | 3221579 |
WISE ELECTRIC, INC. | E= | P | 07/11/2006 | SWITCHING FIRST AND SECOND FLOORS | GARY | GARY | | E= | P | 3221571 |
WISE ELECTRIC, INC. | E= | P | 07/10/2006 | NEED SWITCHES CORRECTED | GARY | GARY | | E= | P | 3221564 |
WISE ELECTRIC, INC. | E= | P | 07/06/2006 | CHECK ON LIGHT SWITCHING, ROOMS WITH ONLY ONE SWITCH ??? | GARY | GARY | | E= | P | 3221557 |
WISE ELECTRIC, INC. | ER | P | 06/27/2006 | SECOND FLOOR CEILINGS,FIRST FLOOR VIDEO ROOMS | GARY | GARY | | ER | P | 3221346 |
WISE ELECTRIC, INC. | ER | P | 06/14/2006 | PANELS, TRANSFORMERS FIRST AND FOURTH, ROOF, PENTHOUSE | GARY | GARY | | ER | P | 3221551 |
WISE ELECTRIC, INC. | ER | P | 06/09/2006 | THIRD FLOOR PANELS, FOURTH FLOOR LOCKED | GARY | GARY | | ER | P | 3221545 |
WISE ELECTRIC, INC. | ER | P | 06/07/2006 | SECOND FLOOR ABOVE CEILING NORTH HALF | GARY | GARY | | ER | P | 3221539 |
WISE ELECTRIC, INC. | ER | P | 06/05/2006 | SUB PANELS FIRST AND SECOND FLOORS | GARY | GARY | | ER | P | 3221533 |
WISE ELECTRIC, INC. | ER | P | 06/02/2006 | ABOVE DROP CEILING SOUTH END SECOND FLOOR | GARY | GARY | | ER | P | 3221524 |
WISE ELECTRIC, INC. | ER | P | 05/25/2006 | ABOVE DROP CEILINGS, OFFICES AND NORTH HALF OF FIRST FLOOR | GARY | GARY | | ER | P | 3221339 |
WISE ELECTRIC, INC. | ER | P | 05/19/2006 | FIRST FLOOR CEILINGS, SEE PERMIT FOR ROOM NUMBERS | GARY | GARY | | ER | P | 3221517 |
WISE ELECTRIC, INC. | ER | P | 05/12/2006 | SECOND FLOOR ELEVATOR AREA | GARY | GARY | | ER | P | 3221510 |
WISE ELECTRIC, INC. | ER | P | 05/12/2006 | WEST STAIRWAY | GARY | GARY | | ER | P | 3221502 |
WISE ELECTRIC, INC. | ER | P | 05/11/2006 | HARD LID CEILINGS BATHROOMS AND BREAKROOM | GARY | GARY | | ER | P | 3221493 |
WISE ELECTRIC, INC. | ES | C | 05/04/2006 | COMMERCIAL SERVICE: NEW SERVICE, 3000 AMP 4/W U/G BY WISE ELECTRIC, INC | GARY | GARY | | ES | C | 3221485 |
WISE ELECTRIC, INC. | ER | P | 05/04/2006 | 2 HR WALLS IN TUNNEL | GARY | GARY | | ER | P | 3221477 |
WISE ELECTRIC, INC. | ER | P | 05/03/2006 | CEILINGS | GARY | GARY | | ER | P | 3221469 |
WISE ELECTRIC, INC. | ES | R | 05/03/2006 | NOT READY | GARY | GARY | | ES | R | 3221461 |
WISE ELECTRIC, INC. | ER | P | 04/27/2006 | CEILINGS FIRST FLOOR COFFEE ROOM | GARY | GARY | | ER | P | 3221453 |
WISE ELECTRIC, INC. | ER | R | 04/26/2006 | CEILING BEING REMOVED | GARY | GARY | | ER | R | 3221446 |
WISE ELECTRIC, INC. | ER | P | 04/24/2006 | FIRST FLOOR BATHROOM CEILINGS | GARY | GARY | | ER | P | 3221331 |
WISE ELECTRIC, INC. | ER | P | 04/19/2006 | 2ND FLOOR ROUGH OK -2ND FLOOR FIRE ALARN OK | RED | RED | | ER | P | 3221438 |
WISE ELECTRIC, INC. | ER | P | 04/14/2006 | PARTIAL WALLS 2ND FLOOR | RED | RED | | ER | P | 3221430 |
WISE ELECTRIC, INC. | ER | P | 04/11/2006 | FIRST FLOOR WALLS | GARY | GARY | | ER | P | 3221422 |
WISE ELECTRIC, INC. | ER | P | 03/30/2006 | WALLS FIRST FLOOR, FIRE ALARM ROUGH FIRST FLOOR | GARY | GARY | | ER | P | 3221323 |
WISE ELECTRIC, INC. | EUG | P | 03/17/2006 | OK TO COVER | GARY | GARY | | EUG | P | 3221314 |
WISE ELECTRIC, INC. | ESL | P | 03/03/2006 | FLOOR BOXES THIRD FLOOR C TO F | GARY | GARY | | ESL | P | 3221414 |
WISE ELECTRIC, INC. | ER | P | 03/02/2006 | SLAB SECOND FLOOR C TO F | GARY | GARY | | ER | P | 3221406 |
WISE ELECTRIC, INC. | ESL | P | 02/27/2006 | FLOOR BOXES FIRST FLOOR LINE C TO F | GARY | GARY | | ESL | P | 3221398 |
WISE ELECTRIC, INC. | ER | P | 02/17/2006 | SLAB FLOOR BOXES, C TO E | GARY | GARY | | ER | P | 3221390 |
WISE ELECTRIC, INC. | ER | P | 02/07/2006 | SECOND FLOO, FLOOR BOXS. | RON | RON | | ER | P | 3221382 |
WISE ELECTRIC, INC. | ER | P | 01/27/2006 | SITE LTNG UG AS MARKED ON PRINT OK. | DEAN | DEAN | | ER | P | 3221374 |
WISE ELECTRIC, INC. | EUG | P | 12/27/2005 | ELECTRICAL SERVICE LATERAL INSIDE BUILDING OK. | DEAN | DEAN | | EUG | P | 3221366 |
WISE ELECTRIC, INC. | ESL | P | 12/15/2005 | AREA OF SITE LTNG NOTED ON PLANS, E1.1.--------UFER OK---------- | DEAN | DEAN | | ESL | P | 3221354 |
MECHONE, INC. | H= | C | 09/28/2006 | RECEIVED BALANCE REPORT FROM MIDWEST/COLORADO SPRINGS. INC. | LYNNS | LYNNS | | H= | C | 3221701 |
MECHONE, INC. | H= | C | 08/10/2006 | 3RD AND 4TH FLOOR HVAC FINAL. | LYNNS | LYNNS | | H= | C | 3221693 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 07/24/2006 | HWP FINAL. | LYNNS | LYNNS | | H= | C | 3221153 |
MECHONE, INC. | HV | P | 06/16/2006 | 3- BOILER AND 1- UNIOT HEATER VENTS IN PENTHOUSE OK. | LYNNS | LYNNS | | HV | P | 3221685 |
MECHONE, INC. | HD | P | 06/16/2006 | F/S DAMPER FRAMING ON 3RD AND 4TH FLOORS OK EXCEPT FOT 4TH FLOOR, NORTH/WEST DAMPER DUCT PENETRATES RATED SHAFT FOR EXHAUST RISER WITH NO PROTECTION. | LYNNS | LYNNS | | HD | P | 3221677 |
OLSON PLUMBING & HEATING COMPANY | HI | C | 06/09/2006 | 60# TEST AND DESIGN OK. | LYNNS | LYNNS | | HI | C | 3221145 |
OLSON PLUMBING & HEATING COMPANY | HC | C | 06/09/2006 | OK FOR METER. | LYNNS | LYNNS | | HC | C | 3221137 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 06/09/2006 | HWP FINAL. | LYNNS | LYNNS | | HWP | C | 3221129 |
MECHONE, INC. | H= | P | 06/02/2006 | OK FOR TILE ON 2ND FLOOR. | LYNNS | LYNNS | | H= | P | 3221669 |
MECHONE, INC. | HD | P | 06/02/2006 | NEED TO CUT SHEET ROCK BACK FROM ALL F/S DAMPERS ON 3RD FLOOR. | LYNNS | LYNNS | | HD | P | 3221661 |
MECHONE, INC. | H= | P | 05/22/2006 | FIRST FLOOR OK TO DROP TILE. | LYNNS | LYNNS | | H= | P | 3221651 |
MECHONE, INC. | HD | P | 05/22/2006 | NEED TO REPAIR F/S DAMPER WALL PENETRATIONS IN ROOMS 229 AND 230. THIRD FLOOR F/S DAMERS OK TO ANGLE. | LYNNS | LYNNS | | HD | P | 3221643 |
MECHONE, INC. | HD | P | 05/04/2006 | DISCUSSED F/S DAMPER FRAMING IN RISER SHAFTS. | LYNNS | LYNNS | | HD | P | 3221635 |
MECHONE, INC. | HD | P | 05/01/2006 | FIRE DAMPER IN TUNNEL EGRESS OK | JACK | JACK | | HD | P | 3221627 |
MECHONE, INC. | HD | P | 04/27/2006 | 2ND FLOOR OK TO INSULATE, 1ST FLOOR OK FOR CEILING GRID | JACK | JACK | | HD | P | 3221619 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/24/2006 | 2- 85# TESTS ON HEATING SUPPLY AND RETURN LINES IN CRAWLSPACE OK. | LYNNS | LYNNS | | HWP | P | 3221121 |
MECHONE, INC. | HD | P | 04/13/2006 | ROUND PIPE ON 1ST FLOOR, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3221611 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/05/2006 | 85# TEST ON CHILL AND HEATING, SUPPLY AND RETURN LINES ON THE 4TH FLOOR OK. | LYNNS | LYNNS | | HWP | P | 3221111 |
MECHONE, INC. | HD | P | 03/28/2006 | 2ND FLOOR RISER DUCT F/S DAMPERS OK. NEED TO SEE FRAMING. | LYNNS | LYNNS | | HD | P | 3221603 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/27/2006 | 4- 85# TESTS ON CHILL AND HEAT, SUPPLY AND RETURN RISER PIPES, 2- 85# TESTS ON CHILL AND HEAT SUPPLY AND RETURN LOOP ON THIRD FLOOR OK. | LYNNS | LYNNS | | HWP | P | 3221103 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/21/2006 | 6- 85# TESTS ON CHILL WATER AND HEATING, SUPPLY AND RETURN LINE ON 1ST AND 2ND FLOORS OK. | LYNNS | LYNNS | | HWP | P | 3221095 |
MECHONE, INC. | HD | P | 03/16/2006 | ROUGH DUCT ON LOW PRESSURE, 1ST AND 2ND FLOORS OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3221595 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/06/2006 | | MARTY | MARTY | | P= | C | 3221281 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 05/09/2006 | PLANS REVISED, TESTS OK | LEE | LEE | | PRD | C | 3221267 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 04/17/2006 | NOTE: HORIZ DRY VENTING ALLOWED ON PENTHOUSE FLOOR DRAINS/SINKS DUE TO FUTURE DUCT WORK | LEE | LEE | | PTO | C | 3221259 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/12/2006 | 2ND FLOOR DWV AND H20 COMPLETE, FUTURES COMPLETE THRU 3RD FLOOR | LEE | LEE | | PTO | P | 3221251 |
OLSON PLUMBING & HEATING COMPANY | PTO | R | 04/11/2006 | LOST TEST ON 2ND AND 3RD FLOOR DWV (LEAKS) | LEE | LEE | | PTO | R | 3221244 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 04/05/2006 | | LEE | LEE | | PRD | C | 3221234 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/03/2006 | AT FINAL CHECK FOR CLEAR ACCESS PANEL AT 1ST FLOOR (WEST) FLOOR SINK NEAR STAIRS, 1ST FLOOR DWV AND H20 COMPLETE | LEE | LEE | | PTO | P | 3221226 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/29/2006 | 1ST FLOOR RESTROOMS DWV AND H20 OK, 1ST FLOOR BREAK ROOM DWV ONLY, 1ST FLOOR MOP SINK STACK AND MISC VENTS OK UP TO 2ND FLOOR. AT FINAL CHECK FOR WATER HAMMER AND MIXING VALVE ACCESS IN RESTROOMS | LEE | LEE | | PTO | P | 3221218 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 03/29/2006 | TWO 8" RISERS (NORTH & SOUTH) UP TO 3RD FLOOR, TWO 3" 2ND FLOOR ROOF DRAINS OK | LEE | LEE | | PRD | P | 3221212 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/23/2006 | DWV ONLY IN WARMING KITCHEN 1ST AND 2ND FLOOR OK PENDING HORIZ DRY VENT AT FLOOR SINK CHANGED, ELEVEN 2" VENTS FROM 4TH FLOOR INTO PENTHOUSE THRU ROOF OK, 3" WATER MAIN FROM EXISTING TO MIDDLE COLUMN OK AND ALSO H20 RISERS IN COLUMN UP TO 4TH FLOOR OK | LEE | LEE | | PTO | P | 3221204 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 03/23/2006 | TWO 3" PENTHOUSE DRAINS OK, TWO 3" DRAINS FOURTH FLOOR EAST END OK DOWN TO 3RD FLOOR CEILING OK | LEE | LEE | | PRD | P | 3221196 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 12/20/2005 | UNDERGROUND PIPE IN C-SPACE COMPLETE | LEE | LEE | | PB | C | 3221185 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/16/2005 | UNDERSLAB, 30' SECTION OF 4" S/E CORNER OK | LEE | LEE | | PRD | P | 3221177 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/14/2005 | MISC DWV WEST SIDE OK (SEE PLANS) | LEE | LEE | | PB | P | 3221169 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/14/2005 | MISC UNDERSLAB, 8" AND 3" TO ELEVATOR (SEE PLANS) | LEE | LEE | | PRD | P | 3221161 |
OTIS ELEVATOR COMPANY | V= | C | 08/14/2006 | ELEVATORS COMPLETE | JOHNW | JOHNW | | V= | C | 3221306 |
OTIS ELEVATOR COMPANY | V= | P | 07/19/2006 | RP--6--06--OTIS--BEFORE FINAL NEED PHONE AND FIRE FINAL | JOHNW | JOHNW | | V= | P | 3221298 |
OTIS ELEVATOR COMPANY | V= | P | 05/31/2006 | SOUTH ELEVATOR OK FOR CONSTRUCTION USE --- NEED OPERATOR IN CAR WITH 2 WAY COMMUNICATION | LES | LES | | V= | P | 3221290 |