GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 06/04/2007 | | BLAKE | BLAKE | | B= | C | 3222511 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/31/2006 | NEED FIRE FINAL SIGN OFF VERIFIED | JOND | JOND | | B= | P | 3222503 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/14/2006 | Temp CO: OK PENDING OTHER FINAL INSPECTIONS BEING COMPLETED | ROLF | ROLF | | B= | P | 3222381 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/11/2006 | INTERIOR 8" STUD WALL, CONTRACTOR TO INSTALL DEFECTION STEEL SADDLES ABOVE @ SHORT WALL SECTION | ED | ED | | BFR | P | 3222495 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/05/2006 | NORTHWEST & SOUTHWEST EXTERIOR WALL (Z) FRAMING | ED | ED | | BFR | P | 3222487 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/05/2006 | NORTHWEST & SOUTHWEST EXTERIOR WALLS | ED | ED | | BIN | P | 3222479 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/30/2006 | OK PENDING OTHER FINAL INSPECTIONS BEING COMPLETED | BLAKE | BLAKE | | B= | P | 3222471 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 02/21/2006 | CEILING OK | BLAKE | BLAKE | | BIN | P | 3222463 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/21/2006 | WALLS OK | BLAKE | BLAKE | | BFR | P | 3222455 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 02/17/2006 | INSULATION OK FOR WALLS SOUTH EAST WALLS | JOND | JOND | | BIN | P | 3222447 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/17/2006 | WALLS OK / NEED PLANS FOR CEILING AND ENERGY CALC PAPER / NEED OTHER ROUGHS SIGNED OFF FOR CEILING | JOND | JOND | | BFR | P | 3222439 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | C | 02/09/2006 | REC'D ENG INSPECTION REPORTS | BLAKE | BLAKE | | BFN | C | 3222431 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/07/2006 | EXTERIOR SOFFIT FRAMING OK FOR R AND D AREA | BLAKE | BLAKE | | BFR | P | 3222424 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/06/2006 | UPPER HALF OF SOUTH AND EAST WALL OK AT R AND D AREA | BLAKE | BLAKE | | BFR | P | 3222416 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 02/06/2006 | UPPER HALF OF SOUTH AND EAST WALL OK AT R AND D AREA | BLAKE | BLAKE | | BIN | P | 3222408 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 01/13/2006 | R AND D LOADING DOCK AREA OK | BLAKE | BLAKE | | BFI | P | 3222400 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 01/10/2006 | WAREHOUSE SLAB OK TO POUR | MICHAELA | MICHAELA | | BFI | P | 3222392 |
WISE ELECTRIC, INC. | E= | C | 07/11/2006 | COMPLETE THIS PERMIT | GARY | GARY | | E= | C | 3222719 |
WISE ELECTRIC, INC. | E= | P | 07/10/2006 | MISSING FIXTURES | GARY | GARY | | E= | P | 3222712 |
WISE ELECTRIC, INC. | ER | P | 05/11/2006 | WALLS | GARY | GARY | | ER | P | 3222704 |
WISE ELECTRIC, INC. | E= | P | 03/24/2006 | SYSTEM FURNITURE BY OTHERS, DOCK AND RECEIVING | GARY | GARY | | E= | P | 3222695 |
WISE ELECTRIC, INC. | ES | P | 03/03/2006 | COMMERCIAL SERVICE: | GARY | GARY | | ES | P | 3222688 |
WISE ELECTRIC, INC. | ER | P | 02/21/2006 | OFFICE CEILINGS | GARY | GARY | | ER | P | 3222680 |
WISE ELECTRIC, INC. | ER | P | 02/17/2006 | DOCK AND WORK AREA, CEILINGS | GARY | GARY | | ER | P | 3222672 |
WISE ELECTRIC, INC. | ER | P | 02/07/2006 | SOFFITS,OK. | RON | RON | | ER | P | 3222664 |
WISE ELECTRIC, INC. | ER | P | 02/01/2006 | ALL WALLS OK EXCEPT E AND W WALL WHERE THEY ARE BEING FURRED OUT. | DEAN | DEAN | | ER | P | 3222656 |
WISE ELECTRIC, INC. | EUG | P | 01/12/2006 | SLAB FOR THE R&D AREA OK. | DEAN | DEAN | | EUG | P | 3222648 |
WISE ELECTRIC, INC. | EUG | P | 01/04/2006 | UNDER SLAB IN WAREHOUSE OK. | DEAN | DEAN | | EUG | P | 3222640 |
WISE ELECTRIC, INC. | ER | P | 12/22/2005 | CONDUIT FOR LIGHTS ABOVE PRECAST ROOF OK. | DEAN | DEAN | | ER | P | 3222632 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 03/21/2006 | HWP FINAL. | LYNNS | LYNNS | | H= | C | 3222562 |
MECHONE, INC. | H= | C | 03/21/2006 | HVAC FINAL. RECEIVED BALANCE REPORT FROM MIDWEST/COLORADO SPRINGS, INC. | LYNNS | LYNNS | | H= | C | 3222734 |
MECHONE, INC. | HD | P | 02/17/2006 | SPIRAL PIPE ABOVE HARD LID, SUPPLY AND EXHAUST OK TO COVER. | LYNNS | LYNNS | | HD | P | 3222727 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/03/2006 | HEAT LINE LOOP IN R AND D ADDITION, SOUTH AND MAIN ROOMS OK. | LYNNS | LYNNS | | HWP | P | 3222555 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 03/27/2006 | | LEE | LEE | | P= | C | 3222624 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/23/2006 | USE PROPER MISSION BAND AT SERVICE SINK, SLEEVE COPPER PIPE OVERHEAD WHERE IT PASSES THRU CONCRETE WALL, MISSING F/S STRAINER | LEE | LEE | | P= | P | 3222615 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 02/03/2006 | AT FINAL CHECK ACCESS TO SERVICE SINK C/O (LEFT SIDE OF SINK), 4" C/O NEXT TO BACK TO BACK W/C, HAMMER ARRESTOR ACCESS IN RESTROOM WALL, AND ALL W/H PIPING AND PAN DRAINS | LEE | LEE | | PTO | C | 3222608 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 02/03/2006 | CHECK AT FINAL --- PENDING UNDERDECK CLAMPS INSTALLED | LEE | LEE | | PRD | C | 3222600 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 01/03/2006 | | LEE | LEE | | PB | C | 3222593 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/03/2006 | UNDER SLAB OK | LEE | LEE | | PRD | P | 3222585 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/22/2005 | WAREHOUSE AREA, NEED TO PIPE CONDENSATE DRAINS TO SANITARY, STILL NEED RESTROOMS AND MISC NORTH END | LEE | LEE | | PB | P | 3222577 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/22/2005 | 3" UNDERGROUND WEST END OK, NEED TO SEPERATE CONDENSATE DRAINS FROM STORM DRAINS ON EAST SIDE, ALSO NEED CONTINUATION OF 6" THRU WORK SHOP | LEE | LEE | | PRD | P | 3222569 |