THOMAS GENERAL CONTRACTORS, INC. | B= | C | 06/06/2006 | | RICK | RICK | | B= | C | 3230304 |
THOMAS GENERAL CONTRACTORS, INC. | BLA | C | 05/09/2006 | | RICK | RICK | | BLA | C | 3230297 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 04/18/2006 | NEED FULL FINALS ON FIRE, MECHANICAL & ELECTRICAL | JOHNP | JOHNP | | B= | P | 3230292 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 04/18/2006 | NEED COPY OF ENGINEERS DESIGN FOR OVERHEAD DOOR CUT INS | JOHNP | JOHNP | | BFR | P | 3230285 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 03/08/2006 | BATHROOMS OK, NEED CUT IN DOORS INSPECTED | JOHNP | JOHNP | | BFR | P | 3230279 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 02/22/2006 | WALLS, EXCEPT BATHROOMS, OK | JOHNP | JOHNP | | BFR | P | 3230272 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 02/08/2006 | WALL ABOVE EXISTING BEAM AT SHOP OK | JOHNP | JOHNP | | BFR | P | 3230264 |
MANITOU ELECTRIC, LLC | E= | C | 05/24/2006 | | MIKEC | MIKEC | | E= | C | 3230256 |
MANITOU ELECTRIC, LLC | E= | P | 04/07/2006 | ALL EXCEPT PRODUCTION AREA AND ELEC. ROOM | MIKEC | MIKEC | | E= | P | 3230248 |
MANITOU ELECTRIC, LLC | ES | C | 03/22/2006 | COMMERCIAL SERVICE: 3PH 4W UG C-T METERED MANITOU ELEC | MIKEC | MIKEC | | ES | C | 3230241 |
MANITOU ELECTRIC, LLC | ER | P | 02/17/2006 | WALLS | MIKEC | MIKEC | | ER | P | 3230234 |
ALL PRO PLUMBING | HC | C | 07/13/2006 | OK FOR METER | JACK | JACK | | HC | C | 3230337 |
REFRIGERATION ENGINEERS,INC | H= | P | 04/21/2006 | FINAL PENDING RECEIPT OF BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3230225 |
REFRIGERATION ENGINEERS,INC | H= | C | 04/21/2006 | BALANCE REPORT RECEIVED 4/24/06 LS. | LYNNS | LYNNS | | H= | C | 3230218 |
ALL PRO PLUMBING | H= | C | 04/06/2006 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 3230330 |
REFRIGERATION ENGINEERS,INC | H= | P | 04/05/2006 | NEED TO SEE LV-2 AND NEED A BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3230210 |
REFRIGERATION ENGINEERS,INC | HV | C | 04/05/2006 | EXHAUST FANS OK. | LYNNS | LYNNS | | HV | C | 3230202 |
REFRIGERATION ENGINEERS,INC | HD | C | 04/05/2006 | ROUGH DUCT COMPLETE. | LYNNS | LYNNS | | HD | C | 3230193 |
ALL PRO PLUMBING | HI | C | 03/24/2006 | 10# TEST AND DESIGN OK. | LYNNS | LYNNS | | HI | C | 3230323 |
ALL PRO PLUMBING | P= | C | 04/10/2006 | | MICK | MICK | | P= | C | 3230366 |
ALL PRO PLUMBING | P= | P | 04/06/2006 | CRITICAL LEVEL AT URNALS LESS THAN 6", BREAK SINK AND BAR SINK C/OUTS NEED TO BE EXPOSED, WATER TEMP EXCEEDS 110 DEGREES, NEED TO SECURE W/H PERMIT, PROVIDE ACCESS PANEL AT HAMMER ARRESTOR, SUPPORT EXPANSION TANK | LEE | LEE | | P= | P | 3230359 |
ALL PRO PLUMBING | PTO | C | 02/21/2006 | NOTE: URNALS ON VERTICAL STACK WITH C/O ACCESS AT 4" FLOOR DRAIN AND H/C WATER CLOSET, CHECK FOR WATER HAMMER ARRESTOR ACCESS IN RESTROOM WALL AT FINAL | LEE | LEE | | PTO | C | 3230351 |
ALL PRO PLUMBING | PB | C | 02/21/2006 | | LEE | LEE | | PB | C | 3230345 |