EPIC CONSTRUCTION, INC. | B= | T | 04/11/2007 | NO PLANS OR PERMIT, SO I STILL DON'T KNOW IF FIRE IS SIGNED OFF | JOHNP | JOHNP | | B= | T | 3246051 |
EPIC CONSTRUCTION, INC. | BFR | C | 04/11/2007 | | JOHNP | JOHNP | | BFR | C | 3246041 |
EPIC CONSTRUCTION, INC. | B= | C | 04/11/2007 | TINA W/FIRE DEPT SAID FIRE FINAL NOT REQUIRED | JAN | JAN | | B= | C | 3246033 |
EPIC CONSTRUCTION, INC. | BE | C | 04/10/2007 | ReOpened by JAN | JAN | JAN | | BE | C | 3246026 |
EPIC CONSTRUCTION, INC. | B= | T | 09/01/2006 | PAID (REC#745730)OPEN FOR BUISINESS WITHOUT FINAL SIGNED OFF; NEED CLEAR FRAME INSPECTION, NEED ADDRESS NUMBERS ON BUILDING; COULDN'T FIND PLANS OR PERMIT | JOHNP | JOHNP | | B= | T | 3246018 |
EPIC CONSTRUCTION, INC. | B= | P | 08/31/2006 | 1)DEADBOLT MUST BE KEYED BOTH SIDES 2)...UNLOCKED DURING...SIGN ON DOORS | RICK | RICK | | B= | P | 3246010 |
EPIC CONSTRUCTION, INC. | BLA | C | 08/11/2006 | | BLAINE | BLAINE | | BLA | C | 3246002 |
EPIC CONSTRUCTION, INC. | BFR | P | 07/19/2006 | NEED MECHANICAL; NEED LETTER ON REAR DOOR HEADER | JOHNP | JOHNP | | BFR | P | 3245995 |
EPIC CONSTRUCTION, INC. | BSP | P | 07/12/2006 | LETTER ON PARAPHET EXTENSION PICKED UP | JOHNP | JOHNP | | BSP | P | 3245988 |
EPIC CONSTRUCTION, INC. | BFR | P | 07/10/2006 | ON PARAPHET EXTENSIONS ONLY - NEED STRUCTURAL ENGINEER'S APPROVAL ON CHANGES IN MATERIAL & ON FASTENING TO NEW ROOF | JOHNP | JOHNP | | BFR | P | 3245982 |
PUEBLO WEST ELECTRIC INC. | E= | C | 08/29/2006 | | JOSEPH | JOSEPH | | E= | C | 3245824 |
PUEBLO WEST ELECTRIC INC. | ER | P | 08/24/2006 | REST OF DROP CEILING | JOSEPH | JOSEPH | | ER | P | 3245816 |
PUEBLO WEST ELECTRIC INC. | ER | R | 08/23/2006 | REMOVE TILES AND INSTALL EITHER CLIPS OR SCREWS | JOSEPH | JOSEPH | | ER | R | 3245807 |
PUEBLO WEST ELECTRIC INC. | ER | P | 08/21/2006 | DROP CEILING AT FRONT OF STORE ONLY | JOSEPH | JOSEPH | | ER | P | 3245799 |
PUEBLO WEST ELECTRIC INC. | EUG | P | 08/18/2006 | TRENCH FOR 4 SITE LIGHTS POLES | JOSEPH | JOSEPH | | EUG | P | 3245789 |
PUEBLO WEST ELECTRIC INC. | ER | P | 07/31/2006 | HARD LIDS ONLY | JOSEPH | JOSEPH | | ER | P | 3245782 |
PUEBLO WEST ELECTRIC INC. | ER | P | 07/18/2006 | WALLS ONLY | JOSEPH | JOSEPH | | ER | P | 3245774 |
PUEBLO WEST ELECTRIC INC. | ESL | C | 07/05/2006 | ALL SLAB WORK COMPLETE | JOSEPH | JOSEPH | | ESL | C | 3245766 |
ALNOR INC. | H= | C | 08/31/2006 | | LYNNS | LYNNS | | H= | C | 3245911 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 08/30/2006 | RECEIVED BALANCE REPORT 8/30/06 FROMROCKY MOUNTAIN BALANCE CO., DENVER, CO. | LYNNS | LYNNS | | H= | C | 3245974 |
ARTESIAN PLBG. & HYDRONICS,INC | H= | C | 08/29/2006 | | JOEL | JOEL | | H= | C | 3245848 |
ALNOR INC. | H= | P | 08/29/2006 | INSULATE BOTH ENDS OF LINE SET, TRAP RTU | JOEL | JOEL | | H= | P | 3245903 |
ARTESIAN PLBG. & HYDRONICS,INC | H= | P | 08/28/2006 | NO APPROVED PLAN ON SITE | JOEL | JOEL | | H= | P | 3245840 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HV | C | 08/23/2006 | WATER HEATER VENT OK. | LYNNS | LYNNS | | HV | C | 3245965 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 08/23/2006 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3245957 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 08/23/2006 | RECEIVED BALANCE REPORT FROM ROCKY MOUNTAIN BALANCE CO., DENVER, CO. | LYNNS | LYNNS | | H= | C | 3245949 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | C | 08/16/2006 | ROUGH DUCT COMPLETE. STILL NEED WATER HEATER VENT AND NEED TO SEE ROOF WORK. | LYNNS | LYNNS | | HD | C | 3245941 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 08/16/2006 | OOK TO DROP TILE IN FRONT OF STORE. | LYNNS | LYNNS | | H= | P | 3245934 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HV | P | 07/28/2006 | BATH EXHAUST ABOVE ROCK CEILING OK TO COVER. | LYNNS | LYNNS | | HV | P | 3245927 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 07/28/2006 | DUCT ABOVE ROCK CEILING OK TO COVER. | LYNNS | LYNNS | | HD | P | 3245919 |
ARTESIAN PLBG. & HYDRONICS,INC | P= | C | 08/29/2006 | | LYNNIE | LYNNIE | | P= | C | 3245895 |
ARTESIAN PLBG. & HYDRONICS,INC | P= | P | 08/28/2006 | 1) EXPOSE TRAP PRIMERS 2) RELOCATE T-P DARIN OR UP SIZE PAN DRAIN 3) 2-SINKS ARE CROSSED BEHIND COUNTER 4) CANT SEE ICE BEN PROTEECTION | LYNNIE | LYNNIE | | P= | P | 3245888 |
ARTESIAN PLBG. & HYDRONICS,INC | PTO | C | 07/18/2006 | DISHWASHER TRAP IS IN WALL STUBBED OUT-----2 TRAP PRIMERS--ACCESS PANELS BY FINALS--NEAR LAVS | LYNNIE | LYNNIE | | PTO | C | 3245880 |
ARTESIAN PLBG. & HYDRONICS,INC | PB | C | 06/29/2006 | PLANS REVISED 6-28-06 | LYNNIE | LYNNIE | | PB | C | 3245872 |
ARTESIAN PLBG. & HYDRONICS,INC | PB | T | 06/28/2006 | PAID (REC#704292)NOT READY---STILL NO ADDRESS POSTED-SEE OTHER NOTES--NO ONE ON SITE--TRAILER IS LOCKED--NO PLANS | LYNNIE | LYNNIE | | PB | T | 3245832 |
ARTESIAN PLBG. & HYDRONICS,INC | PB | T | 06/23/2006 | PAID (REC#704015)1) NO ADDRESS 2) WORK IS NOT INSTALLED TO APPROVED PLANS---TOTALLY CHANGED | LYNNIE | LYNNIE | | PB | T | 3245864 |
ARTESIAN PLBG. & HYDRONICS,INC | PB | P | 06/22/2006 | POST ADDRESS BY NEXT INSPECTION---PIPES COVERED UP IN PLACES--TEST OK ON DWV--RECALL | LYNNIE | LYNNIE | | PB | P | 3245856 |