REFLECTIONS HOME BUILDING, INC | B= | C | 07/13/2007 | | DANF | DANF | | B= | C | 3251890 |
REFLECTIONS HOME BUILDING, INC | B= | P | 05/09/2007 | REMOVE PAINT ON 20 MINUTE GARAGE DOOR LABLE,NEED MINIMUM R-38 INSULATION OVER VAULTED CEILING AREA,FINAL GRADE,RETAINING WALL & DIRT AGAINST WOOD FRAMING @ GRAGE CORNER,NEED MINIMUM 6" BETWEEN DIRT & TOP OF FOUNDATION WALL,NEED SUMP PUMP IN PIT (NOT WORKING),SEAL STUCCO @ GAS LINE
| MIKE | MIKE | | B= | P | 3251883 |
REFLECTIONS HOME BUILDING, INC | BE | C | 01/03/2007 | | MINDY | MINDY | | BE | C | 3251874 |
REFLECTIONS HOME BUILDING, INC | BFR | C | 08/14/2006 | AT FINAL NEED SEPERATION DIRT FROM WOOD FRAME; RIGHT FRONT GARAGE CORNER; ENGINEERING FIX ON FILE | DANF | DANF | | BFR | C | 3251867 |
REFLECTIONS HOME BUILDING, INC | BFR | T | 08/08/2006 | PAID (REC#710562)NEED CLEAN COPY OF OF FOUNDATION REPAIR LETTER,STRIP FORMS @ FOUNDATION REPAIR,WILL NEED RETAINING WALL TO HOLD BACKFILL OFF GARAGE STUD FRAMING | MIKE | MIKE | | BFR | T | 3251860 |
REFLECTIONS HOME BUILDING, INC | BSP | P | 08/04/2006 | OK TO POUR FOUNDATION REPAIR @ GARAGE,NEED COPY OF ENGINEER DESIGN LETTER
| MIKE | MIKE | | BSP | P | 3251851 |
REFLECTIONS HOME BUILDING, INC | BFR | R | 08/02/2006 | REMOVE MUD AND FORM UP; RECALL | DANF | DANF | | BFR | R | 3251844 |
REFLECTIONS HOME BUILDING, INC | BIN | C | 07/28/2006 | | MIKE | MIKE | | BIN | C | 3251836 |
REFLECTIONS HOME BUILDING, INC | BFR | R | 07/28/2006 | PROBLEM NOT CORRECTED(WILL NEED TO REPAIR BOTH SIDES OF GARAGE)
| MIKE | MIKE | | BFR | R | 3251828 |
REFLECTIONS HOME BUILDING, INC | BFR | P | 07/19/2006 | NEED ENGINEERING FOR FRONT GARAGE WALL NOT BEARING ON FOUNDATION AT NORTH WEST CORNER | TERRYB | TERRYB | | BFR | P | 3251819 |
REFLECTIONS HOME BUILDING, INC | BFI | C | 05/31/2006 | | MIKE | MIKE | | BFI | C | 3251803 |
REFLECTIONS HOME BUILDING, INC | BLA | C | 05/31/2006 | | MIKE | MIKE | | BLA | C | 3251812 |
REFLECTIONS HOME BUILDING, INC | BFT | C | 04/13/2006 | 3 PADS AT STEP OK; COMPACTION TESTS NO FILE; #27015, RMG | DANF | DANF | | BFT | C | 3251795 |
REFLECTIONS HOME BUILDING, INC | BFN | C | 04/13/2006 | | DANF | DANF | | BFN | C | 3251788 |
REFLECTIONS HOME BUILDING, INC | BFI | R | 04/07/2006 | NEED "APPROVED" ECC, R-10 HAS BEEN INSTALLED | MIKE | MIKE | | BFI | R | 3251779 |
REFLECTIONS HOME BUILDING, INC | BFD | C | 04/03/2006 | | MIKE | MIKE | | BFD | C | 3251762 |
REFLECTIONS HOME BUILDING, INC | BFN | P | 03/29/2006 | MISSING 3 PADS AT STEP; COMPACTION TESTS, SOILS LETTER, UNDERDRAIN INSPECTION LETTER ON FILE; DRAIN, ENTIRE; SLOPE 10%, ISO, FLOAT | DANF | DANF | | BFN | P | 3251770 |
REFLECTIONS HOME BUILDING, INC | BFT | P | 03/18/2006 | ALL BUT 3 PADS ON CUT | TERRYB | TERRYB | | BFT | P | 3251755 |
D & S ELECTRIC , INC. | E= | C | 05/01/2007 | AC PREWIRE | THOMAS | THOMAS | | E= | C | 3251978 |
PEAK ELECTRIC | ES | C | 06/30/2006 | RESIDENTIAL UNDERGROUND: 150 AMP PEAK ELEC | MIKEC | MIKEC | | ES | C | 3251922 |
PEAK ELECTRIC | ER | C | 06/30/2006 | | MIKEC | MIKEC | | ER | C | 3251915 |
SUMMIT COMFORT SYSTEMS, INC | H= | C | 05/01/2007 | FINISHED BASEMENT, AC LINESET & COIL ROUGH ONLY, NO MANTEL ON FIREPLACE | DOUGR | DOUGR | | H= | C | 3251970 |
TIMBERLINE HEATING & AIR COND. | HC | C | 07/10/2006 | OK TO RELEASE METER | DAVIDH | DAVIDH | | HC | C | 3251747 |
TIMBERLINE HEATING & AIR COND. | HRR | C | 07/10/2006 | OK | DAVIDH | DAVIDH | | HRR | C | 3251739 |
CHIEF HEATING AND GAS CORP. | HI | C | 07/06/2006 | 10 LB TEST OK NOTE 1 1/4 " LINE 1FURN,W/H,RANGE,F/P. | DAVIDH | DAVIDH | | HI | C | 3251931 |
JONES PLBG. & HEATING, LLC. | P= | C | 05/08/2007 | | MARTY | MARTY | | P= | C | 3251962 |
JONES PLBG. & HEATING, LLC. | P= | L | 05/07/2007 | 2:07 | MARTY | MARTY | | P= | L | 3251954 |
JONES PLBG. & HEATING, LLC. | PTO | C | 06/27/2006 | | MARTY | MARTY | | PTO | C | 3251946 |
JONES PLBG. & HEATING, LLC. | PB | C | 04/13/2006 | 4" | MARTY | MARTY | | PB | C | 3251938 |