HOLLADAY BROTHERS CONSTRUCTION, INC | B= | C | 07/12/2006 | | TERRYB | TERRYB | | B= | C | 3280278 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BIN | C | 06/29/2006 | | TERRYB | TERRYB | | BIN | C | 3280271 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BFR | C | 06/26/2006 | PICKED UP ENGINEERS REPORTS | TERRYB | TERRYB | | BFR | C | 3280264 |
HOLLADAY BROTHERS CONSTRUCTION, INC | B= | P | 06/19/2006 | OFFICE AREA ONLY | DANF | DANF | | B= | P | 3280259 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BSP | P | 05/24/2006 | RECEIVED ANOTHER ENGINEER'S LETTER OF INSPECTION OF DAMAGED RAFTERS OVER POOL DATED MAY 15, 2006, FROM MIKE GAINES AND FIX IS ON FILE | DANF | DANF | | BSP | P | 3280250 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BSP | P | 05/15/2006 | ON MAY 12 WENT TO POOL TO INSPECT ROOF RAFTERS OVER POOL AREA. EXTENT OF DAMAGE WILL BE PROVIDED BY MIKE GAINES, PROJECT ENGINEER | DANF | DANF | | BSP | P | 3280244 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BSP | P | 05/04/2006 | MET WITH HOLIDAY BUILDERS SUPER, BJ AND MIKE GAINES ENGINEER TO REVIEW EXPOSED RAFTER OVER POOL AREA; MIKE WILL DRAFT LETTER RE CONDITION AND DIRECTION | DANF | DANF | | BSP | P | 3280237 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BSP | P | 04/26/2006 | MET WITH MICHAEL GAINS ENGINEER; RON HOLIDAY, BJ SUPER, VERN, CITY MANAGER; MICHAEL WILL PROVIDE LETTER TO OK THE ANGELATION IN PONY WALL; EXISTING REPAIRS WERE ACCEPTABLE TO MICHAEL; 12' ROOF AREA THAT EXTEND BEYOND WALL TO OVER POOL HAS A DEFLECTION AT RIDGE; MICHAEL HAS AN ENGINEER FIX TO BE ADDED TO PROJECT; AT TIME OF ADDED RIDGE BEAM UPPER RAFTER CONDITION WILL BE REVIEW BECAUSE OF DEFLECTION IN RAFTER MID SPAN FOR POSSIBLE REPAIR/REPLACEMENT OF RAFTERS | DANF | DANF | | BSP | P | 3280229 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BIN | R | 04/17/2006 | CALLED RON AT HOLLADAY BORTHERS; TALKED ABOUT NEED TO CHANGE ADDRESS TO CORRECT SITE; ALSO ABOUT SEVERAL OTHER CONCERNS RE ROOF AND ENGINEERING; NO INSPECTION WAS DONE; CONTRACTOR WILL ADDRESS ITEMS NOTED | DANF | DANF | | BIN | R | 3280222 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BFR | P | 04/14/2006 | 1) STILL NEED ADDRESS CORRECTED; NO INSPECTIONS UNTIL THIS IS DONE; ENGINEERING ON FILE FOR LEADGER DETAIL; CEILING OVER POOL NEED TO BE INSPECTED BY ENGINEER AS TO STRUCTURAL INTEGERITY; APPEARS TO BE SAGING MORE THAN AREA THAT IS BEING REPAIRED | DANF | DANF | | BFR | P | 3280214 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BSP | P | 04/11/2006 | ELECTRICAL, PLUMBING AND MECHANICAL ARE NOT PART OF THIS SCOPE OF WORK. STRUCTURAL ONLY. | CURTIS | CURTIS | | BSP | P | 3280207 |
HOLLADAY BROTHERS CONSTRUCTION, INC | BFR | R | 04/10/2006 | 1) NEED CORRECT ADDRESS ON PERMIT (MANITUE POOL) 2) NEED ENGINEERING FOR SPLICED 2X4 EAST SIDE 3) NEED ENGINEERING FOR LEADGER DETAIL 4) NEED ALL OTHER ROUGH INSPECTIONS | DANF | DANF | | BFR | R | 3280200 |