GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 04/24/2008 | | CHRISM | CHRISM | | B= | C | 3504771 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/11/2008 | DOOR CLOSER HARDWARE AT 2HR WALL IN LINK TO ASC, REMOVE THUMB LOCK AT SERVERY, SIGNAGE AT SERVERY AND GIFT SHOP DOORS TO REMAIN UNLOCKED, FIRE FINAL, BLIND GAURDS IN STAIRWELL | CHRISM | CHRISM | | B= | P | 3505140 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 04/08/2008 | PAID (REC#800597)ADDITIONAL PLAN REVIEW TIME: $50.000 From: DALEH splice for deleting mri room from scope of work | DALEH | DALEH | | BSP | T | 3505131 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/19/2008 | inspection done by chrism | BLAKE | BLAKE | | BFR | P | 3505124 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/19/2008 | DOOR REFRAMING AT FIRST FLOOR TREATMENT AREA AND X-RAY | CHRISM | CHRISM | | BFR | P | 3505115 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/19/2008 | FOURTH FLOOR BATHROOM ROUGH IN AT LOCKER ROOM FLOOR PENETRATIONS AND FRAMING OK | CHRISM | CHRISM | | BSP | P | 3505108 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/06/2008 | ABOVE GRID COMPLETE FIRST AND SECOND FLOOR, WITH THE EXCEPTION OF CABLE TRAYS THAT PENETRATE FIREWALLS | CHRISM | CHRISM | | BSP | P | 3505099 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/24/2008 | ABOVE GRID FIRST FLOOR COMPLETE ALL BUT AT ROOM 1320, FRAMING IN RADIOLOGY AND CT SCAN AREAS OK | CHRISM | CHRISM | | BFR | P | 3505092 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/10/2008 | ABOVE GRID FIRST FLOOR AT IMAGING OK ALL BUT AT TWO DUCTS MARKED ON CODE PLAN | CHRISM | CHRISM | | BFR | P | 3505085 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/03/2008 | WALLS OK AT RECEPTION DESK FIRST FLOOR | CHRISM | CHRISM | | BSP | P | 3505076 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/26/2007 | FIRST FLOOR E.R. ENTRANCE NEW SOFFIT AND RECEPTION AREA OK AFTER ELECT ROUGH | CHRISM | CHRISM | | BFR | P | 3505065 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/18/2007 | BALANCE OF FIRST FLOOR ABOVE GRID OK, SEE CODE PLANS FOR PENETRATIONS THAT NEED ATTENTION | CHRISM | CHRISM | | BSP | P | 3505058 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/12/2007 | ABOVE GRID CARDIO AREA, ROOM 2338 NEEDS FIRECHAULK WHERE SOUND CHAULK IS NOW | CHRISM | CHRISM | | BSP | P | 3505050 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/11/2007 | above grid at clinical lab and micro bacterial first floor, check wall rating at room 1320 | CHRISM | CHRISM | | BFR | P | 3505042 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/30/2007 | ABOVE HARDLID AT WALLS BETWEEN ATRIUM AND TREATMENT FIRST AND SECOND FLOORS | CHRISM | CHRISM | | BFR | P | 3505034 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/29/2007 | OK ABOVE GRID THIRD FLOOR STERILE AREA, SECOND FLOOR COMPLETE ALL BUT LOBBY | CHRISM | CHRISM | | BSP | P | 3505025 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/29/2007 | HARD LID AT ENTRY LOBBY OK AFTER ELECTRIC, CORPUS WALL IN CHAPLE OK | CHRISM | CHRISM | | BFR | P | 3505017 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 11/26/2007 | PAID (REC#781992)ADDITIONAL PLAN REVIEW TIME: $50.000 From: TIMC | TIMC | TIMC | | BSP | T | 3505008 |
US ENGINEERING COMPANY | BSP | T | 11/26/2007 | PAID (REC#782293)ADDITIONAL PLAN REVIEW TIME: $50.000 From: TCRIPPEN new splice | TCRIPPEN | TCRIPPEN | | BSP | T | 3505211 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 11/26/2007 | PAID (REC#782288): ADDITIONAL PLAN REVIEW TIME: $50.000 From: TCRIPPEN new splice pages | TCRIPPEN | TCRIPPEN | | BSP | T | 3505554 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/16/2007 | ABOVE GRID FIRST FLOOR AREAS "A" AND "B" OK SOME PENETRATIONS TO RECHECK MARKED ON PLANS | CHRISM | CHRISM | | BSP | P | 3505001 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 11/16/2007 | PAID (REC#780933)ADDITIONAL PLAN REVIEW TIME: $100.000 From: SHELBY | SHELBY | SHELBY | | BSP | T | 3504993 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 11/15/2007 | FIRST FLOOR AREAS "A" AND "B" AND MEDICAL RECORDS, PENETRATIONS IN SMOKE BARRIER WALL AT TREATMENT ROOMS | CHRISM | CHRISM | | BSP | R | 3504985 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/13/2007 | FIRST FLOOR ELEVATOR LOBBY CEILING OK CLOUD FRAMING IN CHAPLE OK AFTER ELECTRICAL | CHRISM | CHRISM | | BFR | P | 3504977 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/06/2007 | FIRST FLOOR SOFFITS AND HARDLIDS AT ATRIUM AREA OK TO ROCK AS OTHER ROUGH INSPECTIONS ARE COMPLETED | CHRISM | CHRISM | | BFR | P | 3504969 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/05/2007 | FIRRING AT ATRIUM ROCK WALLS, WALL FRAMING IN CHAPEL OFFICE AREA | CHRISM | CHRISM | | BFR | P | 3504960 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/05/2007 | ABOVE GRID OK AREA "F" SURGERY UNIT SECOND FLOOR | CHRISM | CHRISM | | BSP | P | 3504951 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/30/2007 | HARD LID IN CHAPEL AND WALLS IN MICRO BACTERIAL LABS OK | CHRISM | CHRISM | | BFR | P | 3504943 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/25/2007 | SECOND FLOOR ABOVE GRID IN AREA "A", NEED TO REINSPECT ROOMS MARKED IN BLUE | CHRISM | CHRISM | | BFR | P | 3504935 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/22/2007 | ABOVE GRID OK IN TREATMENT AREA | CHRISM | CHRISM | | BFR | P | 3504927 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/16/2007 | FIRST FLOOR IMAGING AREA WALLS, FIRST AND SECOND FLOOR AREA "C" WALLS, OK NEED PLAN CHANGES SUBMITTED | CHRISM | CHRISM | | BFR | P | 3504920 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 10/11/2007 | NEED PLAN CHANGE TO SOUTH WEST AREA APPROVED BY PLAN CHECK | CHRISM | CHRISM | | BFR | R | 3504911 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/08/2007 | WALLS OK CLINICAL AREA FIRST FLOOR, CHAPEL HARDLID GRID OK | CHRISM | CHRISM | | BFR | P | 3504903 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/24/2007 | WALL FRAMING AND FLOOR PENETRATIONS AT FIRST FLOOR CARDIO AREA | CHRISM | CHRISM | | BFR | P | 3504897 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 09/21/2007 | ABOVE GRID NOT READY | CHRISM | CHRISM | | BFR | R | 3504888 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/19/2007 | SECOND FLOOR ABOVE GRID "C" WING-OK ALL BUT REMODEL AREA, AREAS E AND B OK ALL ROOMS MARKED IN BLUE, MAIN ELEVATOR LOBBY OK | CHRISM | CHRISM | | BFR | P | 3504879 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/13/2007 | ATTRIUM CEILING FRAMING OK | CHRISM | CHRISM | | BFR | P | 3504871 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/06/2007 | FIRST FLOOR MEDICAL RECORDS AREA FRAMING OK | CHRISM | CHRISM | | BFR | P | 3504864 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/30/2007 | SECOND FLOOR CENTRAL STERILE AREA FRAME AND VAPOR BARRIER | CHRISM | CHRISM | | BFR | P | 3504857 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/27/2007 | FRAMING AT AREA "A" EMEGENCY ENTRANCE AND TREATMENT AREA | CHRISM | CHRISM | | BFR | P | 3504850 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/20/2007 | SOFFIT FRAMING AND WALL PENETRATIONS ABOVE IN AREA "A" SECOND FLOOR | CHRISM | CHRISM | | BFR | P | 3504842 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/13/2007 | FIRST FLOOR "C" AREA GIFT SHOP AND ADMIN OFFICES, SECOND FLOOR SURGERY UNIT | CHRISM | CHRISM | | BFR | P | 3504835 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 08/07/2007 | NOTHING ON THIS PERMIT TODAY | CHRISM | CHRISM | | BFR | R | 3504828 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/30/2007 | SECOND FLOOR CARDIO AREA, WALL AND FLOOR PENETRATIONS | CHRISM | CHRISM | | BFR | P | 3504819 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/24/2007 | SECOND FLOOR EVEVATOR LOBBY FRAMING OK | CHRISM | CHRISM | | BFR | P | 3504811 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/16/2007 | SECOND FLOOR AREA "B" SEE PAGE TA102 | CHRISM | CHRISM | | BFR | P | 3504803 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/09/2007 | SECOND FLOOR "A" WING FRAMING AND FLOOR PENETRATIONS OK, | CHRISM | CHRISM | | BFR | P | 3504795 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 07/05/2007 | PAID (REC#759086): ADDITIONAL PLAN REVIEW TIME: $50.000 From: TCRIPPEN for base plumbing on first floor | TCRIPPEN | TCRIPPEN | | BSP | T | 3505547 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/28/2007 | SECOND FLOOR PRE-OP AREA FRAME AND FLOOR PENETRATIONS | CHRISM | CHRISM | | BFR | P | 3504787 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/01/2007 | SECOND FLOOR "C" WING FRAMING AND FLOOR PENETRATIONS OK, SHOWER DRAIN PENETRATIONS FOR THIRD FLOOR FIRECHAULKED WILL REQUIRE U.L. LISTING FOR FIRECHAULKED FROM BELOW | CHRISM | CHRISM | | BFR | P | 3504779 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 04/01/2008 | | SHELBY | SHELBY | | E= | C | 3506667 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | R | 03/31/2008 | cup building roof condenser unit fuses to small [6.5 min-15 max.] tighten connector at disconnect=====first floor d wing panels complete====first floor e wing panels complete | THOMAS | THOMAS | | E= | R | 3506659 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 03/18/2008 | second floor complete including panels---room 1306 cieling good | THOMAS | THOMAS | | E= | P | 3506652 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/26/2008 | WALLS AND CEILINGS ABOVE GRID OK NEED REDUNDANT GROUND CHECKED AND GRID INSPECTION | SHELBY | SHELBY | | ER | P | 3506643 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/18/2008 | BOOMS OK IN FOLLOWING AREAS THAT HAVE ALREADY HAD DEVICES CHECKED D WING AND AB WING | SHELBY | SHELBY | | ER | P | 3506627 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/18/2008 | GIFT SHOP DEVICES OK | SHELBY | SHELBY | | ER | P | 3506635 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/01/2008 | GRID IN C WING CORRIDOR AS MARKED TE 502 | SHELBY | SHELBY | | ER | P | 3506612 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/01/2008 | GRID ON FIRST FLOOR IN FRONT OF STAIRWELL AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506619 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/28/2008 | F WING PHYSICIANS SLEEPING AREA AS MARKED TE 401
| SHELBY | SHELBY | | ER | P | 3506596 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/28/2008 | GRID 0OK GIFT SHOP,C WING HALLWAY,COPY ROOM AS MARKED TE501 | SHELBY | SHELBY | | ER | P | 3506603 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/25/2008 | ROUGH FOR IMAGING AREA AND CT CONTROLL ROOM TE 502 COLUMN LINE 11-5 AND W-EE. THIS IS FOR WALL ROUGH ONLY | SHELBY | SHELBY | | ER | P | 3506588 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/24/2008 | DEVICES OK IMAGING AREA AS MARKED TE 401
| SHELBY | SHELBY | | ER | P | 3506580 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/23/2008 | C WING DEVICES AS MARKED TE 401
| SHELBY | SHELBY | | ER | P | 3506572 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/16/2008 | GRID OK AS MARKED TE 501 C WING | SHELBY | SHELBY | | ER | P | 3506556 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 01/16/2008 | REMOVE CEILING TILES FOR GRID INSPECTION(TRIP FEE IF CALLED FOR INSPECTION BEFORE TILES REMOVED) | SHELBY | SHELBY | | ER | R | 3506563 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/14/2008 | STERILE AREA IN E F WING AS MARKED ON TE 402 DEVICES OK (NEEDS BOOMS IN STALLED AND INSPECTED FOR FINAL | SHELBY | SHELBY | | ER | P | 3506548 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/11/2008 | OPERATING ROOMS DEVICES OK AS MARKED TE 402(NEED BOOMS INSTALLED BEFORE ROOMS CAN BE FINALED)
| SHELBY | SHELBY | | ER | P | 3506538 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/10/2008 | ROOM DEVICES OK AS MARKED TE 401(NEED BOOMS INSTALLED BEFORE ROOMS CAN BE FINALED) | SHELBY | SHELBY | | ER | P | 3506531 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/08/2008 | A WING ROOMS AS MARKED 1/8 AND 1/9 DEVICES OK NEED BOOMS INSTALLED BEFORE ROOM FINALS | SHELBY | SHELBY | | ER | P | 3506513 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/08/2008 | KICK LIGHTS(STAIRWAY LIGHTING LOCATED JUST ABOVE RISER HEIGHT) AT TOP OF ATRIUM STAIRWAY OK | SHELBY | SHELBY | | ER | P | 3506521 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/03/2008 | EAST ENTRY GRID AND REGISTRATION WALLS AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506498 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/03/2008 | ROOMS OK F WING LABS AS MARKED TE 401 | SHELBY | SHELBY | | ER | P | 3506505 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/01/2008 | F WING CORRIDOR GRID OK AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506492 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 12/20/2007 | b wing second floor---print te 402 | THOMAS | THOMAS | | E= | P | 3506484 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 12/17/2007 | third floor sheet te 403 | THOMAS | THOMAS | | E= | P | 3506476 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 12/14/2007 | SEE PRINTS THIRD FLOOR NURSERY==TRIAGE==LDR | THOMAS | THOMAS | | E= | P | 3506471 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/14/2007 | FREESTANDING LAB TABLES IN MICRO BAC LAB | SHELBY | SHELBY | | ER | P | 3506462 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/13/2007 | ROOM FINALS AS AMRKED THIS DATE | SHELBY | SHELBY | | ER | P | 3506456 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 12/12/2007 | final third floor b wing | THOMAS | THOMAS | | E= | P | 3506451 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/12/2007 | MICROBAC GRID AS MARKED TE 501
| SHELBY | SHELBY | | ER | P | 3506433 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/12/2007 | PHLEBOTOMY LAB GRID OK | SHELBY | SHELBY | | ER | P | 3506439 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/12/2007 | ROOMS AS MARKED IN PRE OP TE 402 | SHELBY | SHELBY | | ER | P | 3506446 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | ER | P | 12/12/2007 | FAST TRACK NURSE STATION CABINET WALLS AS MARKED TE 501
| SHELBY | SHELBY | | ER | P | 3505165 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | ER | P | 12/12/2007 | ROOMS AS MARKED IN PRE OP TE 402
| SHELBY | SHELBY | | ER | P | 3505173 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/11/2007 | GRID IN IMAGING DE WING AS MARKED TE 501----PATIENT HOLDING AREA 1318 REDUNDANT GROUND OK | SHELBY | SHELBY | | ER | P | 3506428 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/30/2007 | CHAPEL WALLS,SOFFITS,AND HARDLIDS AS MARKED TE 501.2 | SHELBY | SHELBY | | ER | P | 3506421 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/29/2007 | E WING GRID OK--- E WING RECEPTION AREA HARDLID 1201 OK | SHELBY | SHELBY | | ER | P | 3506401 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/29/2007 | EWING REDUNDANT GROUND HOME RUNS AND BRANCH CIRCUITS OK | SHELBY | SHELBY | | ER | P | 3506407 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/29/2007 | GRID A B WING AS MARKED TE 501---GRID EF WING AS MARKED TE 502 | SHELBY | SHELBY | | ER | P | 3506415 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/26/2007 | C WING GRID AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506387 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 11/26/2007 | FOR HARDLIDS ABOVE ATRIUM LOWER LEVEL ACCESS HOLES MUST BE WITHIN REACHABLE DISTANCE OF J BOXES AND ELECTRICAL EQUIPMENT THEY ARE INTENDED TO SERVE(HARDLID GRID IS NOT INTENDED TO BE WALKED ON) | SHELBY | SHELBY | | ER | R | 3506394 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 11/23/2007 | NEED UPLIGHTS ON TOP OF HARDLID SOFFITS INSPECTED AFTER SHEETROCK(ENTIRE LOWER ATRIUM LEVEL) | SHELBY | SHELBY | | ER | R | 3506380 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/20/2007 | GRID OK FOR MEDICAL RECORDS AREA AND REDUNDANT GROUNDS OK HOME RUN AND BRANCH AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506372 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | T | 11/16/2007 | PAID (REC#780865): REMOVE CEILING TILES SO ABOVE GRID CAN BE INSPECTED (SECOND FLOOR REMODEL AREA FOR ACCESS TO STAIRS)---NUMEROUS ON SITE CONSULTATIONS WITH ELECTRICAL CONTRACTOR,GENERAL CONTRACTOR,AND CEILING TILE CONTRACTOR MADE CLEAR ON EACH CONSULTATION WHAT IS REQUIRED | SHELBY | SHELBY | | ER | T | 3506365 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/16/2007 | GRID FOR EF WING AS MARKED TE 502 | SHELBY | SHELBY | | ER | P | 3506358 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/16/2007 | GRID AS MARKED TE 501
| SHELBY | SHELBY | | ER | P | 3506351 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/14/2007 | AB WING GRID AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506344 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 11/14/2007 | NEED TILES REMOVED TO MAKE CEILING INSPECTION POSSIBLE SECOND FLOOR | SHELBY | SHELBY | | ER | R | 3506336 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/09/2007 | GRID AS MARKED TE 502 | SHELBY | SHELBY | | ER | P | 3506328 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/07/2007 | WALLS AS MARKED TE 501 WHEELCHAIR STORAGE | SHELBY | SHELBY | | ER | P | 3506320 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/07/2007 | ATRIUM HLLWAY HARDLIDS AS MARKED TE 401 | SHELBY | SHELBY | | ER | P | 3506312 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 11/07/2007 | SECOND FLOOR GRID NOT READY | SHELBY | SHELBY | | ER | R | 3506305 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/05/2007 | B WING BATHROOMS GRID AND ABOVE GRID AS MARKED TE 502 | SHELBY | SHELBY | | ER | P | 3506300 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/30/2007 | F WING WALLS AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506295 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | ER | P | 10/30/2007 | OPERATING ROOMS 1 THROUGH4 GRID AND ABOVE GRID OK | SHELBY | SHELBY | | ER | P | 3505157 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/30/2007 | A WING GRID AS MARKED TE 502--- | SHELBY | SHELBY | | ER | P | 3506289 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/26/2007 | CORE AS MARKED NON TE 502 (CEILINGS) | SHELBY | SHELBY | | ER | P | 3506280 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | T | 10/25/2007 | PAID (REC#777168)CEILING TILES NEED TO BE REMOVED IN SUCH A MANNER THAT AREA ABOVE GRID AND AROUND LIGHTS CAN BE INSPECTED.THIS INFORMATION WAS CONVEYED TO THE CONTRACTOR, PREVIOUS TO THIS INSPECTION DATE ,IN A CLEAR AND CONCISE MANNER | SHELBY | SHELBY | | ER | T | 3506270 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/15/2007 | C WING REMODEL FOR STAIRWAY ACCESS WALLS OK | SHELBY | SHELBY | | ER | P | 3506262 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 10/10/2007 | NO INSPECTIONS ON THIS PERMIT UNTILL PLANS FOR FIRST FLOOR, REFLECTING CHANGES TO AREA INSIDE COLUMN LINES E10 AND E5 ON TE 501,HAVE BEEN APPROVED | SHELBY | SHELBY | | ER | R | 3506254 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | ER | R | 10/09/2007 | HALLWAY GRID OUTSIDE NURSERY HAS LOW VOLT WIRE SUPPORTED BY GRID | SHELBY | SHELBY | | ER | R | 3505147 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/05/2007 | D WING GRID AS MARKED TE 502----WALLS AS MARKED ON TE 502 | SHELBY | SHELBY | | ER | P | 3506245 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/04/2007 | REDUNDANT GROUNDS AS MARKED ON TE 502 (D WING) HOME RUN AND BRANCH | SHELBY | SHELBY | | ER | P | 3506238 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/01/2007 | ELEVATOR LOBBY WALLS AS MARKED TE 502 | SHELBY | SHELBY | | ER | P | 3506230 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 09/28/2007 | AC STRAPPED INCORRECTLY--- NEED PROTECTION OF CABLE WHERE LESS THAN 1 1/4 FROM EDGE OF FRAMMING MEMBER | SHELBY | SHELBY | | ER | R | 3506222 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/27/2007 | REDUNDANT GROUNDS (HOME RUNS)A WING AS MARKED TE502---GRID AND ABOVE GRID B WING AS MARKED TE502 | SHELBY | SHELBY | | ER | P | 3506214 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 09/26/2007 | NOT READY | SHELBY | SHELBY | | ER | R | 3506206 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | R | 09/25/2007 | GRID INSPECTION NOT POSSIBLE DUE TO SPRINKLER HEAD BEING IN THE WAY OF LIGHT FIXTURE | SHELBY | SHELBY | | ER | R | 3506198 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/24/2007 | WALLS AS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506190 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/18/2007 | ELEVATOR LOBBY WALLS---SOFFIT AS MARKED ON TE 501 | SHELBY | SHELBY | | ER | P | 3506181 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/17/2007 | SOFFITS AS MARKED ON TE 501 FIRST FLOOR ---LADDER WILL BE REQUIRED AT TIME OF CEILING INSPECTION TO INSPECT J BOXES ABOVE HARDLIDS | SHELBY | SHELBY | | ER | P | 3506173 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/14/2007 | RECESSED CANS(4) ON LOADING DOCK---HARDLIDS ABOVE HISTORY DISPLAY 2192 | SHELBY | SHELBY | | ER | P | 3506165 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/13/2007 | HARDLIDS JANITOR CLOSETS 2257,2271 AS MARKED | SHELBY | SHELBY | | ER | P | 3506155 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/04/2007 | WALLS TE501 & TE500 | THOMAS | THOMAS | | ER | P | 3506147 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/31/2007 | WALLS AS MARKED ON TE 501 | SHELBY | SHELBY | | ER | P | 3506140 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/30/2007 | W3ALLS AS MARKED ON SHEET TE 501 | SHELBY | SHELBY | | ER | P | 3506132 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/28/2007 | WALLS AS MARKED ON TE 502 | SHELBY | SHELBY | | ER | P | 3506123 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/24/2007 | WALLS AS MARKED ON TE502 | SHELBY | SHELBY | | ER | P | 3506115 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/21/2007 | CAFE WALLS IS MARKED TE 501 | SHELBY | SHELBY | | ER | P | 3506108 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/13/2007 | WALLS AS MARKED ON TE 501 | SHELBY | SHELBY | | ER | P | 3506099 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/10/2007 | OPERATING ROOMS AS MARKED TE 502 NOTE; OPERATING ROOMS 2239 AND 2234 ARE FOR FUTURE----ALSO WALLS OTHER THAN OPERATING ROOMS THIS DATE. NOTE!!! WALL BETWEEN ROOM 2244 AND 2260 CAN NOT BE SHEETROCKED! DRYWALL STACKED AGAINST WALL MADE INSPECTION IMPOSSIBLE | SHELBY | SHELBY | | ER | P | 3506092 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/07/2007 | CONTROLL ROOM 2323 WALLS AS MARKED ON SHEET TE502 | SHELBY | SHELBY | | ER | P | 3506084 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/01/2007 | WALLS AS HIGHLIGHTED TE 503 THIS DATE | SHELBY | SHELBY | | ER | P | 3506076 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/26/2007 | WALLS AS MARKED ON TE 502 THIS DATE | SHELBY | SHELBY | | ER | P | 3506068 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/12/2007 | WALLS AS HIGHLIGHTED IN PAGE TE 502 | SHELBY | SHELBY | | ER | P | 3506060 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/11/2007 | WALLS AS MARKED ON SHEET TE502 | SHELBY | SHELBY | | ER | P | 3506050 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/10/2007 | WALLS AS HIGHLIGHTED ON PAGE TE 502 | SHELBY | SHELBY | | ER | P | 3506041 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/09/2007 | WALLS AS MARKED ON TE 502 | SHELBY | SHELBY | | ER | P | 3506034 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/28/2007 | WALLS AS HIGHLIGHTED ON PAGE TE 502 | SHELBY | SHELBY | | ER | P | 3506025 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/27/2007 | WALLS AS HIGHLIGHTED ON PAGE TE 502 | SHELBY | SHELBY | | ER | P | 3506018 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 05/25/2007 | WALLS AS HIGHLIGHTED ON PAGE TE 502 | SHELBY | SHELBY | | ER | P | 3506012 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 04/04/2007 | WALLS AS HIGHLIGHTED ON SHEET 501.2 APPROVED SET (YELLOW HIGHTER) | SHELBY | SHELBY | | ER | P | 3506006 |
US ENGINEERING COMPANY | H= | C | 04/23/2008 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 3505204 |
US ENGINEERING COMPANY | HD | C | 04/17/2008 | EXHAUST AND HOODS OK ON OWNER FURNISHED HOOS 1ST AND 2ND FLOORS. | LYNNS | LYNNS | | HD | C | 3505538 |
US ENGINEERING COMPANY | H= | P | 04/08/2008 | HVAC PARTIAL FINAL FOR 1ST AND 2ND FLOOR, SEE SHEETS TM401 AND TM402 FOR AREAS. FINAL HVAC PENDING BALANCE REPORT AND 3- EXHAUST HOODS. | LYNNS | LYNNS | | H= | P | 3505530 |
US ENGINEERING COMPANY | H= | P | 04/07/2008 | ATRIUM AND ROOM 1339 HVAC FINAL. ALL HVAC FINALS PENDING BALANCE REPORT COMPLETE 100%. | LYNNS | LYNNS | | H= | P | 3505523 |
US ENGINEERING COMPANY | H= | P | 03/20/2008 | HVAC FINAL EXCEPT FOR ROOMS 1339 AND 1349. | LYNNS | LYNNS | | H= | P | 3505514 |
US ENGINEERING COMPANY | H= | P | 12/04/2007 | 1ST FLOOR: ALL AREAS EXCEPT FOR: ATRIUM, ROOMS: 1302, 1303, 1304, 1305, 1520, 1347, 1339, 1329.2 AND 1323. | LYNNS | LYNNS | | H= | P | 3505506 |
US ENGINEERING COMPANY | H= | P | 11/14/2007 | SEE SHEETS TM401 FOR FINAL AREAS, MED RECORDS, NON INVASIVE CARDIO, NORTH END OF FAST TRACK AND AREA C 1ST FLOOR. ON SHEET TM401: OK TO COVER ALL HARD LID AREAS. | LYNNS | LYNNS | | H= | P | 3505500 |
US ENGINEERING COMPANY | H= | P | 10/17/2007 | HVAC FINALS ON SHEETS TM 402 EXCEPT FOR EF-2.7 AND EF-2.8, FAST TRACK A/B ON SHEET TM 401 | LYNNS | LYNNS | | H= | P | 3505492 |
US ENGINEERING COMPANY | HD | P | 10/17/2007 | ROUGH DUCT OK TO INSULATE ON TM401 ASI-111. | LYNNS | LYNNS | | HD | P | 3505482 |
US ENGINEERING COMPANY | HD | P | 10/01/2007 | ROUGH DUCT FOR CLINICAL LAB SHEET TM401. | LYNNS | LYNNS | | HD | P | 3505474 |
US ENGINEERING COMPANY | H= | P | 10/01/2007 | SEE SHEETS M404, M405, TM403, TM402 AND TM 404 FOR FLOORS FINALED ON THIS DATE. | LYNNS | LYNNS | | H= | P | 3505466 |
US ENGINEERING COMPANY | HD | P | 09/14/2007 | ROUGH DUCT ON 1ST FLOOE IMAGING AREA OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505458 |
US ENGINEERING COMPANY | H= | P | 08/29/2007 | 2ND FLOOR: SURGERY SUPPORT, PHARMACY AND RESPIRATORY AREA, HVAC FINAL. | LYNNS | LYNNS | | H= | P | 3505450 |
US ENGINEERING COMPANY | HD | P | 08/29/2007 | ROUGH DUCT IN AREA: IMAGING, SUPPLY, RETURN AND SS EXHAUST OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505442 |
US ENGINEERING COMPANY | HWP | P | 08/21/2007 | 3- 100# TEST ON 1ST FLOOR, HEATING WATER AREAS A AND B, CHILL WATER AREAS C D E AND F, LOW PRESSURE STEAM, SUPPLY AND CONDENSATE AREAS A AND B OK. | LYNNS | LYNNS | | HWP | P | 3505435 |
US ENGINEERING COMPANY | H= | P | 08/16/2007 | HVAC FINAL ON 2ND FLOOR AREA D. | LYNNS | LYNNS | | H= | P | 3505428 |
US ENGINEERING COMPANY | HD | P | 08/16/2007 | 1ST FLOOR AREA E AND ASI-75 ROUGH DUCT OK TO INSULATE | LYNNS | LYNNS | | HD | P | 3505398 |
US ENGINEERING COMPANY | HD | P | 08/08/2007 | ROUGH DUCT, 1ST FLOOR, MED. RECORDS, ASI-75 OK TO INSULATE. EXHAUST DUCT ROUGH FOR FAST TRACK AREA AS NOTED ON PLANS. | LYNNS | LYNNS | | HD | P | 3505391 |
US ENGINEERING COMPANY | H= | P | 07/30/2007 | HVAC FINAL FOR AREA C, 2ND FLOOR, ALL ROOMS EXCEPT FOR HALLWAY. | LYNNS | LYNNS | | H= | P | 3505383 |
US ENGINEERING COMPANY | HD | P | 07/30/2007 | AREA , 1ST FLOOR ROUGH DUCT EXCEPT FOR EXHAUST, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505375 |
US ENGINEERING COMPANY | HWP | P | 07/23/2007 | 100# TEST ON HEATING WATER SUPPLY AND RETURN LINES IN C WING 1ST FLOOR OK. 100# TEST ON 1ST FLOOR SNOW MELT TO MAIN ENTRY, AMBULANCE AND NORTH ENTRY OK. | LYNNS | LYNNS | | HWP | P | 3505367 |
US ENGINEERING COMPANY | H= | P | 07/20/2007 | 2ND FLOOR AREA 3, HVAC FINAL IN ALL EXCEPT FOR HALLWAYS. | LYNNS | LYNNS | | H= | P | 3505360 |
US ENGINEERING COMPANY | HD | P | 07/11/2007 | ROUGH DUCT IN C WING, 1ST FLOOR, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505352 |
US ENGINEERING COMPANY | HWP | P | 07/11/2007 | 2- 100# TESTS ON 2ND FLOOR, E AND F WINGS. NOTE 2ND FLOOR COMPLETED. | LYNNS | LYNNS | | HWP | P | 3505345 |
US ENGINEERING COMPANY | HD | P | 07/06/2007 | 2ND FLOOR, AREA E AND F, ROUGH DUCT ON LATTERALS, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505337 |
US ENGINEERING COMPANY | HWP | P | 07/06/2007 | 2- 100# TESTS ON LOW AND HIGH PRESSURE STEAM AND CONDENSATE LINES OK. | LYNNS | LYNNS | | HWP | P | 3505330 |
US ENGINEERING COMPANY | HWP | P | 06/20/2007 | 6TH FLOOR, 2- 100# TESTS ON UNIT HOOK UP. 3RD FLOOR, AREA F, 100# TEST, 2ND FLOOR, AREA B, 100# TEST OK. | LYNNS | LYNNS | | HWP | P | 3505323 |
US ENGINEERING COMPANY | HWP | P | 06/12/2007 | LEVEL 2, "A" WING, 100# TEST ON HEATING WATER SUPPLY AND RETURN. | LYNNS | LYNNS | | HWP | P | 3505316 |
US ENGINEERING COMPANY | HD | P | 06/07/2007 | PARTIAL HVAC FINAL ON 5TH FLOOR AREA "A". NEED TO LABEL F/S DAMPER LOCATIONS ON GRID. ROUGH DUCT ON 3RD FLOOR AREA"F" AND 2ND FLOOR AREA "A AND B", OK TO INSULATE | LYNNS | LYNNS | | HD | P | 3505309 |
US ENGINEERING COMPANY | HWP | P | 06/04/2007 | 3RD FLOOR, AREA D, 3- 100# TESTS ON HEATING WATER SUPPLY AND RETURN. | LYNNS | LYNNS | | HWP | P | 3505301 |
US ENGINEERING COMPANY | HWP | P | 06/01/2007 | 100# TEST ON LEVEL 2, AREAS E AND D OK. | LYNNS | LYNNS | | HWP | P | 3505294 |
US ENGINEERING COMPANY | HWP | P | 05/25/2007 | GARDEN LEVEL MAINS (HPS, HPC, LPS ,LPC, HWS/R, CWS/R, AND SNOW MELT). 100 LB TEST OK ON ALL. NO VAV'S INSPECTED. MAIN LINES UP TO EQUIPMENT ISOLATION VALVES OK. OK TO INSULATE. | NANCY | NANCY | | HWP | P | 3505286 |
US ENGINEERING COMPANY | HD | P | 05/22/2007 | 2ND FLOOR AREA D: ROUGH DUCT OK. NEED ALL DAMPERS INSTALLED. OK TO INSULATE UP TO WHERE DAMPERS GO. 3RD FLOOR AREA E: ROUGH DUCT OK. OK TO INSULATE. 4TH FLOOR AREA A: LIEBERT UNIT MOVED. NEED TO INSPECT WHEN INSTALLED IN NEW LOCATION. FINAL INSPECTION OF ALL ABOVE CEILING DUCT AND REGISTER INSTALLATION OK. OK TO INSTALL TILES. 5TH FLOOR AREAS C AND D: FINAL INSPECTION OF ABOVE CEILING DUCT AND REGISTER INSTALLATION OK. OK TO INSTALL TILES. | NANCY | NANCY | | HD | P | 3505278 |
US ENGINEERING COMPANY | HWP | P | 05/18/2007 | 100# TEST OK ON HEATING WATER SUPPLY AND RETURN 2ND FLOOR AREA C. INITIALED AND DATED ON PRINTS. | NANCY | NANCY | | HWP | P | 3505271 |
US ENGINEERING COMPANY | HD | P | 05/07/2007 | GARDEN LEVEL, CENTER AREA AND 2ND FLOOR AREA C ROUGH DUCT. OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505263 |
US ENGINEERING COMPANY | HD | P | 05/02/2007 | 3RD FLOOR AREA B: ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505256 |
US ENGINEERING COMPANY | HWP | P | 04/30/2007 | 3RD FLOOR AREA A, 100# TESTS ON HEATING WATER OK. | LYNNS | LYNNS | | HWP | P | 3505249 |
US ENGINEERING COMPANY | HWP | P | 04/24/2007 | 1- 100# TEST ON HEATING WATER SUPPLY AND RETURN ON 3RD FLOOR AREA D. | LYNNS | LYNNS | | HWP | P | 3505241 |
US ENGINEERING COMPANY | HD | P | 04/18/2007 | 3RD FLOOR A WING ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505233 |
US ENGINEERING COMPANY | HWP | P | 04/16/2007 | 2- 100# TESTS ON RADIANT HEAT ON NORTH AND NORTH/EAST OF 1ST FLOOR OK. | LYNNS | LYNNS | | HWP | P | 3505227 |
US ENGINEERING COMPANY | HD | P | 04/06/2007 | 3RD FLOOR, AREA D, ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3505219 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/16/2008 | 12 TESTABLE BACKFLOW DEVICES AT DIALYSIS STATIONS 2ND FLOOR | LEE | LEE | | P= | C | 3505995 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/14/2008 | STILL NEED DIALYSIS BACKFLOWS X-12, MISC BACKFLOW PROTECTION IN KITCHEN AND CHECK CONNECTIONS AT DISHWASHERS AND PULPER DRAINS | LEE | LEE | | P= | P | 3505988 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/08/2008 | SEE SCAN FOR PROOF OF POTABLE WATER | JEFF | JEFF | | P= | P | 3505981 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/07/2008 | CROSS CONNECTION PROTECTION AT CONDENSATE COOLERS X 6 APPROVED BY KYE LEHR ON LEVEL 2, NEED MISSING TRAP GAURD AT LAB AREA F, STILL NEED CROSS CONNECTION PROTECTION AT CONDENSATE COOLERS X 2 LEVEL 1, SEE PTO NOTES 3/19/08 | JEFF | JEFF | | P= | P | 3505974 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/25/2008 | LEVEL 2 COMPLETE LESS PTO ISSUES 3/19/08 AND CROSS CONNECTION PROTECTION AT CONDENSATE COOLERS X 5 OR 6(CONTRACTOR TO VERIFY NUMBER AND LOCATIONS), LEVEL 1 COMPLETE LESS AREA F(LAB)/SINK MISSING AT NUCLEAR MED/CROSS CONNECTION PROTECTION AT CONDENSATE COOLERS X 2(CONTRACTOR TO VERIFY NUMBER AND LOCATIONS)/PROVIDE DRAINAGE FITTINGS AT THREE COMPARTMENT SINK AT CAFE | JEFF | JEFF | | P= | P | 3505967 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/24/2008 | CANCELLED ON SITE | JEFF | JEFF | | P= | P | 3505957 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/21/2008 | LEVEL 2 C,D,F OK, A PENDINDING COMPLETION OF PTO NOTES DATED 3/19/08 | JEFF | JEFF | | P= | P | 3505949 |
OLSON PLUMBING & HEATING COMPANY | PTO | R | 03/19/2008 | ADDED DIALYSIS WASTE BOXS X 12, NO APPROVED PLANS ON SITE, NEED SPECIFICATIONS ON DIALYSIS MACHINES THAT WILL BE USED FOR CROSS CONNECTION ISSUES AND WASTE ISSUES(DOES INDIRECT WASTE NEED TO BE SAME AS WASHER BOX STANDARDS....18" MINIMUM STAND PIPE?), ENGINEERS DRAWINGS VERY UNCLEAR????????, INSPECTION PENDING!! | JEFF | JEFF | | PTO | R | 3505941 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/10/2008 | C,D,F LEVEL 2.....NEED TRAP GAURDS AT FLOOR DRAINS X 4 AREA F, LABEL FAUCET AT "FROZEN" SECTION "NON POTABLE" OR REPIPE, REST OK | JEFF | JEFF | | P= | P | 3505933 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/01/2007 | CHANGED TO P[ARTIAL TO ALLOW INSPECTION OF ADDITIONAL DIALISYS MACHINES, KYE,LEVEL 1 AND 2 PTO COMPLETE, VERIFY CROSS CONNECTION PROTECTION AT CONDENSATE COOLER AT FINAL | JEFF | JEFF | | PTO | P | 3505926 |
OLSON PLUMBING & HEATING COMPANY | P11 | C | 09/28/2007 | REVISED TP400.2, ADDED DRAIN LINE FOR UPPER SINK. | KYE | KYE | | P11 | C | 3505918 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/25/2007 | LEVEL 1 AREA F IMAGING DOMESTIC WATER COMPLETE, DECONTAMINATION SHOWER COMPLETE | JEFF | JEFF | | PTO | P | 3505911 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/18/2007 | LEVEL 1 AREA F DOMESTIC WATER PIPE AT "CLINICAL LAB" COMPLETE, LEVEL 1 AREA F DOMESTIC WATER OVERHEAD TRUNK LINE AT "IMAGING" OK | JEFF | JEFF | | PTO | P | 3505902 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/07/2007 | LEVEL 1 AREA F WASTE AND VENT TO LEVEL 2 COMPLETE | JEFF | JEFF | | PTO | P | 3505893 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/05/2007 | LEVEL 1 AREA E DOMESTIC WATER COMPLETE, LEVEL 1 AREA F CORRIDOR 1393 OVERHEAD DOMESTIC WATER, CORRIDOR ONLY | JEFF | JEFF | | PTO | P | 3505885 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/28/2007 | LEVEL 1 AREA E DOMESTIC WATER PIPE OVERHEAD TRUNK LINES OK | JEFF | JEFF | | PTO | P | 3505877 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/27/2007 | NEED CITY WASTE WATER AND HEALTH DEPARTMENT TO REVIEW PLANS | JEFF | JEFF | | PTO | P | 3505870 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/20/2007 | LEVEL 1 AREA F COLUMN B TO W, LINE 5 - 10 WASTE AND VENT TO LEVEL 2 | JEFF | JEFF | | PTO | P | 3505864 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/17/2007 | LEVEL 1 AREA F WASTE AND VENT TO LEVEL 2 COLUMN K-W LINE 5-10 AND VENTS FROM COLUMN B TO K TO LEVEL 2 OK | JEFF | JEFF | | PTO | P | 3505857 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/14/2007 | LEVEL 1 AREA F COLUMN M-EE, LINE 6 - 10 WASTE AND VENT TO LEVEL 2 TO INCLUDE CARRIERS | JEFF | JEFF | | PTO | P | 3505851 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/13/2007 | LEVEL 1 AREA E DOMESTIC WATER PIPE LINE 13 - 20, COLUMN LINES P TO W, LEVEL 2 AREA F DOMESTIC WATER PIPE CENTRAL STERILE COMPLETE, LEVEL 2 DOMESTIC WATER COMPLETE | JEFF | JEFF | | PTO | P | 3505845 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/09/2007 | LEVEL 1 AREA A AND B DOMESTIC WATER OVERHEAD AND WALLS, QUESTION ON CONDESATE COOLER NOT ON APPROVED PLANS | JEFF | JEFF | | PTO | P | 3505837 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/01/2007 | LEVEL 1 AREA E WASTE AND VENT TO LEVEL 2 COMPLETE | JEFF | JEFF | | PTO | P | 3505831 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/31/2007 | LEVEL 1 AREA E WASTE AND VENT TO LEVEL 2 COLUMN B - W, LINE 13 TO 22, LEVEL 1 AREA C DOMESTIC WATER COMPLETE | JEFF | JEFF | | PTO | P | 3505823 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/27/2007 | LEVEL 1 AREA E WASTE TO LEVEL 2 COLUMN F TO M, LINES 13 - 20 INCLUDES CARRIERS, LEVEL 1 AREA C DOMESTIC WATER PIPE COMPLETE LESS HOSE BIBBS | JEFF | JEFF | | PTO | P | 3505817 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/25/2007 | LEVEL 1 AREA E COLUMN LINES L TO AA, LINES 14 TO 22 DWV TO LEVEL 2 OK | JEFF | JEFF | | PTO | P | 3505808 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | PTO | P | 07/23/2007 | LEVEL 2 AREA F CENTRAL STERILE OVERHEAD DOMESTIC WATER OK | JEFF | JEFF | | PTO | P | 3505197 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/23/2007 | LEVEL 1 AREA C WASTE AND VENT COMPLETE TO LEVEL 2 | JEFF | JEFF | | PTO | P | 3505800 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/18/2007 | LEVEL 2 AREA F SURGERY DOMESTIC WATER COMPLETE, SURGERY ONLY | JEFF | JEFF | | PTO | P | 3505792 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/18/2007 | LEVEL 1 AREA B WASTE AND VENT TO LEVEL 2 COMPLETE, TO INCLUDE CARRIERS | JEFF | JEFF | | PTO | P | 3505785 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/17/2007 | LEVEL 1 AREA B LINE 6 TO 9, COLUMN EE - PP WASTE AND VENT THROUGH ROOF LESS CARRIER OK | JEFF | JEFF | | PTO | P | 3505777 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/16/2007 | LEVEL 1 AREA A COLUMN EE - PP, LINES 9 TO 21 DWV COMPLETE LESS CARRIERS | JEFF | JEFF | | PTO | P | 3505769 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/12/2007 | LEVEL 2 AREA C OVERHEAD DOMESTIC WATER TRUNK LINES OK | JEFF | JEFF | | PTO | P | 3505761 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 07/12/2007 | LEVEL 1 AREA F COLUMN F TO M, LINE 8 - 10 APPROVED CHANGES IN BASE OK | JEFF | JEFF | | PB | C | 3505754 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/06/2007 | LEVEL 2 AREA F SURGERY OVERHEAD DOMESTIC WATER PIPE OK, LEVEL 1 AREA A COLUMN EE - PP LINE 9 TO 21 WASTE TO LEVEL 2 VENT TO SHAFT 6 | JEFF | JEFF | | PTO | P | 3505748 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/02/2007 | LEVEL 2 AREA E ROOMS 2221/23 CARRIERS, LEVEL 2 AREA F ROOMS 2256/58, 2329/33 CARRIERS CLINICAL SINK 2265 WASTE AND VENT | JEFF | JEFF | | PTO | P | 3505741 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/28/2007 | LEVEL 2 AREA F DWV COMPLETE, LEVEL 2 DWV TO LEVEL 3 COMPLETE | JEFF | JEFF | | PTO | P | 3505732 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/27/2007 | LEVEL 2 AREA F DWV COLUMN B TO M LINE 4 TO 11 AND COLUMN M TO W LINE 5 TO 10 TO LEVEL 3 OK, LEVEL 2 AREA F CARDIO DOMESTIC WATER PIPE COMPLETE, CARDIO ONLY | JEFF | JEFF | | PTO | P | 3505724 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/25/2007 | LEVEL 2 AREA A AND B DOMESTIC WATER PIPE COMPLETE | JEFF | JEFF | | PTO | P | 3505717 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/25/2007 | LEVEL 2 AREA F COLUMN B TO W, LINE 1 THROUGH 4 DWV TO LEVEL 3 OK | JEFF | JEFF | | PTO | P | 3505712 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/14/2007 | LEVEL 1 TO LEVEL 2 6" WASTE AT COLUMN B-20 OK, LEVEL 2 AREA F WASTE FROM COLUMN J-5 TO LEVEL 3, VENTS AT ROOM 2256 TO LEVEL 3, WASTE AND VENTS ROOM 2258 TO LEVEL 3 OK | JEFF | JEFF | | PTO | P | 3505699 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | PTO | P | 06/13/2007 | LEVEL 2 AREA A AND B OVERHEAD DOMESTIC TRUNK LINES OK, LEVEL 1 DOMESTIC WATER TRUNK LINES SHAFT 3 TO SHAFT 6 OK | JEFF | JEFF | | PTO | P | 3505189 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/11/2007 | LEVEL 2 AREA F COLUMN R-5 DWV TO LEVEL 3 OK | JEFF | JEFF | | PTO | P | 3505693 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/06/2007 | LEVEL 2 AREA E DOMESTIC WATER COMPLETE | JEFF | JEFF | | PTO | P | 3505685 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/01/2007 | LEVEL 2 AREA E WASTE AND VENT COMPLETE | JEFF | JEFF | | PTO | P | 3505677 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/31/2007 | LEVEL 2 AREA F CARRIER AT ROOM 2004 | JEFF | JEFF | | PTO | P | 3505669 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/30/2007 | LEVEL 2 AREA A ROOMS 2406/8/12/14/16/18/22/24 CARRIERS, LEVEL 2 AREA E DWV COMPLETE | JEFF | JEFF | | PTO | P | 3505661 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/24/2007 | LEVEL 2 AREA E OVERHEAD DOMESTIC WATER PIPE TRUNK LINES OK | JEFF | JEFF | | PTO | P | 3505656 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/23/2007 | LEVEL 2 AREA A DWV COMPLETE | JEFF | JEFF | | PTO | P | 3505647 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/21/2007 | LEVEL 2 AREA A WASTE TO LEVEL 3, VENTS TO BE RETESTED | JEFF | JEFF | | PTO | P | 3505639 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/18/2007 | LEVEL 2 AREA A WASTE OUT OF SHAFT 6 TO INCLUDE WASTE AND VENT ROOM 2430/32, LEVEL 2 AREA C DOMESTIC WATER PIPE COMPLETE | JEFF | JEFF | | PTO | P | 3505631 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/17/2007 | LEVEL 2 AREA B DWV TO LEVEL 3 COMPLETE | JEFF | JEFF | | PTO | P | 3505623 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/16/2007 | LEVEL 2 AREA B COLUMN 2 TO 7 DWV TO LEVEL 3 OK | JEFF | JEFF | | PTO | P | 3505616 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/14/2007 | LEVEL 2 AREA E DWV COLUMNS B - J/ LINES 13 TO 20 OK | JEFF | JEFF | | PTO | P | 3505608 |
OLSON PLUMBING & HEATING COMPANY | PTO | L | 05/07/2007 | 2ND FLOOR NOT READY | LEE | LEE | | PTO | L | 3505600 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/30/2007 | SEE F96616 PRD NOTES 4/30/07 | JEFF | JEFF | | PTO | P | 3505592 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/25/2007 | LEVEL 2 AREA C DWV TO LEVEL 3 COMPLETE, LEVEL 2 AREA D TO LEVEL 3 DWV COMPLETE, STACKS IN AREA E | JEFF | JEFF | | PTO | P | 3505584 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/24/2007 | LEVEL 2 ALL WASTE OUT OF SHAFT 4 TO LEVEL 3 OK | JEFF | JEFF | | PTO | P | 3505577 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/23/2007 | LEVEL 2 ALL WASTE OUT OF SHAFT 3 TO LEVEL 3 AND ALL WASTE ABOVE ATRIUM TO STACKS IN AREA D LEVEL 2 OK, NO TESTS ON STACKS | JEFF | JEFF | | PTO | P | 3505569 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/17/2007 | LEVEL 1 WASTE TO LEVEL 2 AT COLUMN GG - LL/2 - 6, AND COLUMN PP - TT/11 - 21 | JEFF | JEFF | | PTO | P | 3505561 |