PONDEROSA CONSTRUCTORS, LLC | B= | C | 08/28/2013 | All other required Final inspections are complete. (This is a computer generated result) | JOHN | JOHN | | B= | C | 4594533 |
PONDEROSA CONSTRUCTORS, LLC | BFR | C | 08/23/2013 | | JOHN | JOHN | | BFR | C | 4591415 |
PONDEROSA CONSTRUCTORS, LLC | B= | P | 08/23/2013 | Additional Inspections Required: External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300). | JOHN | JOHN | | B= | P | 4591404 |
PONDEROSA CONSTRUCTORS, LLC | BE | L | 08/22/2013 | Renewed at 8/22/2013 9:50:56 AM See receipt 1149662 | NELIDA | NELIDA | | BE | L | 4590401 |
PONDEROSA CONSTRUCTORS, LLC | BFR | R | 08/24/2012 | Need approved plans for inspection | JOHNP | JOHNP | | BFR | R | 4369275 |
PONDEROSA CONSTRUCTORS, LLC | BE | L | 07/27/2012 | Renewed for Full Fee at 7/27/2012 2:08:43 PM (Receipt#1065021) | MINDY | MINDY | | BE | L | 4350365 |
PONDEROSA CONSTRUCTORS, LLC | BSP | T | 03/29/2010 | PAID (REC#903123) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Change type of construction to V-B and add sprinklers | SHELLEY | SHELLEY | | BSP | T | 3959600 |
PONDEROSA CONSTRUCTORS, LLC | BLA | C | 03/26/2010 | no permit card on site | BLAKE | BLAKE | | BLA | C | 3959289 |
PONDEROSA CONSTRUCTORS, LLC | BSP | P | 03/09/2010 | TIE FOOTINGS OK | BERTW | BERTW | | BSP | P | 3951943 |
KRAMER CONSTRUCTION, INC | BSP | P | 01/19/2010 | reopen permit | BLAKE | BLAKE | | BSP | P | 3933758 |
KRAMER CONSTRUCTION, INC | BE | L | 09/30/2009 | Renewed at 9/30/2009 10:56:00 AM | JIMP | JIMP | | BE | L | 3891744 |
KRAMER CONSTRUCTION, INC | BFN | C | 09/16/2008 | EUFER GROUND INSTALLED / CONTRACTOR HAS DESIGN & REGIONAL BUILDING APPROVAL FOR UPSIZED PADS AT EAST WALL FOR FUTURE ADDITION. | BOBB | BOBB | | BFN | C | 3741522 |
KRAMER CONSTRUCTION, INC | BFT | C | 09/16/2008 | 1000 PSF / STAMPED OPEN HOLE & SLIOLS LETTER ON FILE .NO DRAIN REQUIRED . | BOBB | BOBB | | BFT | C | 3741518 |
KRAMER CONSTRUCTION, INC | BFI | P | 09/16/2008 | OK WITH 24" OF VERTICAL FROST INSULATION. CONTRACTOR TO INSTALL REMAINING FROST INSULATION BELOW CONCRETE FLOOR AT EXTERIOR WALLS. | BOBB | BOBB | | BFI | P | 3741509 |
KRAMER CONSTRUCTION, INC | BFN | P | 08/29/2008 | Need footings complete. Corner footings poured with no inspection noted. No eufer ground installed. Reinforcing and walls per design. Inspector did not pick up any paper-work. Contractor to pour at his own risk. | LEEG | LEEG | | BFN | P | 3733643 |
KRAMER CONSTRUCTION, INC | BFT | P | 08/18/2008 | OK FOOTING DEPTH FOR PADS AT CENTER BUILDING STEP ./ NEED ENGINEERS DESIGN & RBD APPROVAL FOR EAST END DESIGN FOR FUTURE BUILDING ADDITION. | BOBB | BOBB | | BFT | P | 3726830 |
KRAMER CONSTRUCTION, INC | BFT | P | 08/13/2008 | OK ALL PADS & FOOTING EXCEPT CENTER PADS AT BUILDING STEP & EAST END OF BUILDING./ 1000 PSF. | BOBB | BOBB | | BFT | P | 3724621 |
KRAMER CONSTRUCTION, INC | BE | L | 08/05/2008 | Renewed at 8/5/2008 1:49:42 PM - Reopened at no cost due to delays w/ water purveyor Must start constuction with 60 days RMC | BOB | BOB | | BE | L | 3719973 |
KRAMER CONSTRUCTION, INC | BSP | T | 08/04/2008 | PAID (REC#819943) ADDITIONAL PLAN REVIEW TIME: $50 From: RONW Changes metal bldg. supplier, rereview = okay. | RONW | RONW | | BSP | T | 3718817 |
FOSTER ELECTRIC CORPORATION | E= | C | 07/06/2011 | | GARYL | GARYL | | E= | C | 4173307 |
FOSTER ELECTRIC CORPORATION | EE | L | 07/06/2011 | Renewed online for 1/2 Fee at 7/6/2011 7:53:25 AM (RECEIPT #: 984276) | WEBSITE | WEBSITE | | EE | L | 4173022 |
FOSTER ELECTRIC CORPORATION | E= | R | 01/05/2011 | building unlocked but no plans on site; permit history indicates that on May 5 & July 9 inspector requested plans for shell be amended to reflect changes made in the field; I need those plans on site to verify changes. If you need further clarification call inspector in morning 327-2934 | JOSEPH | JOSEPH | | E= | R | 4094351 |
FOSTER ELECTRIC CORPORATION | E= | L | 01/04/2011 | locked at 11:30 | JOSEPH | JOSEPH | | E= | L | 4093605 |
FOSTER ELECTRIC CORPORATION | E= | P | 09/02/2010 | revise plans to show service as installed and lighting not installed as future | MATTHEW | MATTHEW | | E= | P | 4034441 |
FOSTER ELECTRIC CORPORATION | ES | P | 07/21/2010 | Commercial Service: 800 amp 3 phase meter stack for new commercial service by foster electric: set meters 150 and 160---- plans show 800 amp main breaker; revise plans by final | MATTHEW | MATTHEW | | ES | P | 4012665 |
FOSTER ELECTRIC CORPORATION | ES | P | 07/09/2010 | Commercial Service: 800 amp 3 phase meter stack for new commercial building by foster electric: set meters 150 and 160-------- plans show 800 amp main breaker; need to be revised by final------- | MATTHEW | MATTHEW | | ES | P | 4007048 |
FOSTER ELECTRIC CORPORATION | ES | R | 05/05/2010 | service for core and shell does not match service for tenate service, need #4 al equipment ground for 125 amp feeders, tenant plans shows 100 amp disconnect and 125 amp breakers are installed per core and shell plans | MATTHEW | MATTHEW | | ES | R | 3976626 |
FOSTER ELECTRIC CORPORATION | ES | R | 05/03/2010 | NEED BUILDING UNLOCKED AND CAN'T DO SERVICE INSPECTION WITHOUT APPROVED SET OF PLANS ON SITE | JOSEPH | JOSEPH | | ES | R | 3975617 |
FOSTER ELECTRIC CORPORATION | EUG | P | 03/17/2010 | ALL INTERIOR PVC TO EACH TENNANT SPACE SUB PANEL COMPLETE | JOSEPH | JOSEPH | | EUG | P | 3955139 |