T-BONE CONSTRUCTION, INC. | B= | C | 03/24/2008 | | TODDS | TODDS | | B= | C | 3618378 |
T-BONE CONSTRUCTION, INC. | B= | R | 03/21/2008 | REMOVE KEYED DEADBOLT FROM SOUTH EXIT DOOR | DANF | DANF | | B= | R | 3618371 |
T-BONE CONSTRUCTION, INC. | BLA | C | 01/29/2008 | NORTH OF WEST DOOR OK | DANF | DANF | | BLA | C | 3618362 |
T-BONE CONSTRUCTION, INC. | BFR | P | 01/04/2008 | INTERIOR WALL FRAMING OK; LETTER ON FILE FOR TUBE POST BEARING ON FOOTER AND LENTAL ON HOLLOW CMU AT BOTH ENDS | DANF | DANF | | BFR | P | 3618353 |
T-BONE CONSTRUCTION, INC. | BFR | P | 12/12/2007 | 1) NEED ADDRESS CORRECTED ON PERMIT TO 4745 FORGE RD PER SUPER 2) NEED ENGINEER'S LETTER TO OK TO BEAR 4X4 TUBE POSTS ON SIDE OF FOOTER 3) NEED OK TO BEAR LENTALS ON NON-GROUTED CMU BLOCKS AT NEW OPENINGS | DANF | DANF | | BFR | P | 3618345 |
T-BONE CONSTRUCTION, INC. | E= | C | 01/30/2008 | | MIKEC | MIKEC | | E= | C | 3618400 |
T-BONE CONSTRUCTION, INC. | ER | C | 01/24/2008 | DROPPED CEILING | MIKEC | MIKEC | | ER | C | 3618392 |
T-BONE CONSTRUCTION, INC. | ER | P | 12/21/2007 | | THOMAS | THOMAS | | ER | P | 3618385 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 02/01/2008 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 3618268 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 01/29/2008 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3618263 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 01/28/2008 | GAS INSPECTION ONLY. | NANCY | NANCY | | H= | C | 3618285 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 01/23/2008 | 10 LB TEST OK. NEW GAS LINE INSTALLED TO PRINT. AT FINAL CHECK TIE IN OF NEW LINE TO EXISTING MAIN. | NANCY | NANCY | | HI | C | 3618277 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 01/22/2008 | OK TO DROP TILE. | LYNNS | LYNNS | | H= | P | 3618254 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 01/22/2008 | ROUGH DUCT COMPLETE. | LYNNS | LYNNS | | HD | C | 3618247 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/11/2008 | ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3618237 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 02/12/2008 | | MARTY | MARTY | | P= | C | 3618338 |
LANDMARK PLUMBING AND HEATING, INC. | P= | R | 02/08/2008 | WRONG AIR GAP ON D/WASHER,UNPLUG WOMENS W/CLOSET,STUB OUT CONDENSATE EAST W/HEATER,TIGHTEN UP SHOWER HEAD,NO STUDOR VENT ON LAUNDRY TUB. | MARTY | MARTY | | P= | R | 3618330 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 01/11/2008 | INSULATE PIPING BY FINAL,PLAN CALLS FOR RECIRC.LINE | MARTY | MARTY | | PTO | C | 3618322 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/03/2008 | MAIN FLOOR BATHROOMS,NEXT TIME COMPLETE ALL ROUGH INS,COMPLETE DWV FOR L/TUB. | MARTY | MARTY | | PTO | P | 3618314 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | R | 01/02/2008 | NO TEST,SOME AREAS NOT ACCESSIBLE. | MARTY | MARTY | | PTO | R | 3618306 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 12/12/2007 | | MARTY | MARTY | | PB | C | 3618300 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 12/10/2007 | BATH AND LAUNDRY TUB. | MARTY | MARTY | | PB | P | 3618293 |