BRYAN CONSTRUCTION, INC. | B= | P | 11/21/2008 | Temp CO: transfer of equipment | MARY | MARY | | B= | P | 3759224 |
BRYAN CONSTRUCTION, INC. | B= | C | 11/18/2008 | items in previous final inspection have been completed. | NATHAN | NATHAN | | B= | C | 3771912 |
BRYAN CONSTRUCTION, INC. | B= | P | 10/21/2008 | 39" HALLWAY LEADING TO ADA TOILET / MOVE SIGNAGE FROM DOORS TO STRIKE SIDE ON WALL @ 60" FROM FF TO CENTER OF SIGN @ BATHROOM DOORS (ALL) / HANDRAIL @ EXTERIOR STAIRS NEEDS TO HAVE PICKETS SPACED SO THAT A 4" SPHERE CANNOT PASS THRU / NEED SIGN OFF FROM FIRE DEPARTMENT FOR HAZMAT / DOORS FROM OFFICES TO PATH OF EGRESS NEED TO BE SINGLE ACTION LATCHES FROM INSIDE OFFICE | JEREMY | JEREMY | | B= | P | 3759214 |
BRYAN CONSTRUCTION, INC. | BFR | C | 10/16/2008 | | BOBB | BOBB | | BFR | C | 3756819 |
BRYAN CONSTRUCTION, INC. | BFR | P | 09/22/2008 | no new framing added, mechanical needs to be completed before frame can be signed off | ED | ED | | BFR | P | 3743845 |
BRYAN CONSTRUCTION, INC. | BSP | P | 09/22/2008 | seal tops of pre-cast joints at the west side of wall and any penitrations. can be seen at final | ED | ED | | BSP | P | 3743842 |
BRYAN CONSTRUCTION, INC. | BSP | R | 09/15/2008 | STOP BY JOB SITE ON 9-12-08 TO INFORM SUPERINTENDENT THAT PRECAST PANEL CAULKING DESIGN SUPPLYED BY THEIR CONTRACTOR WOULD NOT BE EXCEPTABLE. | BOBB | BOBB | | BSP | R | 3740307 |
BRYAN CONSTRUCTION, INC. | BSP | P | 09/10/2008 | PICK UP DESIGN TO SEAL PENITRATIONS AT PRESTRESS WALL PANELS. | BOBB | BOBB | | BSP | P | 3738296 |
BRYAN CONSTRUCTION, INC. | BSP | T | 09/08/2008 | PAID (REC#825064) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY revised service laterals | SHELBY | SHELBY | | BSP | T | 3736946 |
BRYAN CONSTRUCTION, INC. | BSP | P | 08/22/2008 | PICK UP DESIGN FOR PENITRATIONS AT RATED FIREWALLS. | BOBB | BOBB | | BSP | P | 3729710 |
BRYAN CONSTRUCTION, INC. | BSP | P | 08/22/2008 | PICK UP DESIGN FOR FIREWALL SEAL & PENITRATIONS AT RATED WALL. | BOBB | BOBB | | BSP | P | 3729604 |
BRYAN CONSTRUCTION, INC. | BFI | C | 08/18/2008 | | BOBB | BOBB | | BFI | C | 3726759 |
BRYAN CONSTRUCTION, INC. | BFN | C | 08/18/2008 | | BOBB | BOBB | | BFN | C | 3726750 |
BRYAN CONSTRUCTION, INC. | BFT | C | 08/18/2008 | 3000 PSF / 2ND OPEN HOLE LETTER ON FILE | BOBB | BOBB | | BFT | C | 3726749 |
BRYAN CONSTRUCTION, INC. | BSP | P | 08/15/2008 | Reviewed construction progress with superintendent, Need to update inspections,Need rated wall details | MIKE | MIKE | | BSP | P | 3726257 |
BRYAN CONSTRUCTION, INC. | BSP | T | 08/15/2008 | PAID (REC#821691) ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH splice see clouded areas | DALEH | DALEH | | BSP | T | 3725801 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/22/2008 | ALL FRAMING OK WITH MECHANICAL ROUGH INSPECTION & OTHER INSPECTIONS. | BOBB | BOBB | | BFR | P | 3712040 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/15/2008 | FRAMING FOR BATHROOM WALLS AT SHOP AREAS OK WITH ELECTRIC ROUGH INSPECTION. | BOBB | BOBB | | BFR | P | 3707850 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/11/2008 | INTERIOR OFFICE PARTITIONS OK WITH ELECTRIC ROUGH INSPECTION. | BOBB | BOBB | | BFR | P | 3706343 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/10/2008 | FRONT OFFICE INTERIOR WALLS OK WITH ELECTRIC ROUGH INSPECTION. | BOBB | BOBB | | BFR | P | 3705702 |
BRYAN CONSTRUCTION, INC. | BIN | P | 07/10/2008 | OK INSULATION AT FRONT OFFICE EXTERIOR WALLS. | BOBB | BOBB | | BIN | P | 3705696 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/08/2008 | EXTERIOR WALL FRAMING OF OFFICE & SHOW ROOM AREAS CHECK OK WITH OTHER ROUGH INSPECTIONS. | BOBB | BOBB | | BFR | P | 3704040 |
BRYAN CONSTRUCTION, INC. | BFI | P | 06/26/2008 | REMAINING FOUNDATION INSULATION AT HORIZONTAL 12" AREAS INSPECTED MARKED IN SQUIGGLY ORANGE HILITER AND DATED INITIALED. N-P AT GRID 18,19/ T LINE 10-15/ S LINE 3-5/ N.9-N.5 AT LINE 1. | NATHAN | NATHAN | | BFI | P | 3698674 |
BRYAN CONSTRUCTION, INC. | BFI | P | 06/24/2008 | N LINE AND F LINE @ 21 LINE / P LINE AND R LINE @ 20 LINE / 10 AND 15 LINE BETWEEN R7 AND Q LINE / S LINE @ WET PREP DOOR WAY ALL O.K. | JEREMY | JEREMY | | BFI | P | 3697799 |
BRYAN CONSTRUCTION, INC. | BFR | P | 06/23/2008 | GRID LINE (A) FRONT PARAPET WALL FRAMING OK | ED | ED | | BFR | P | 3696459 |
BRYAN CONSTRUCTION, INC. | BFI | P | 06/17/2008 | bfi marked in blue with 6-17 dated | JIMA | JIMA | | BFI | P | 3693081 |
BRYAN CONSTRUCTION, INC. | BFI | P | 06/12/2008 | INTERIOR ROOMS WITH FLOOR INSULATION OK, | ED | ED | | BFI | P | 3690896 |
BRYAN CONSTRUCTION, INC. | BSP | P | 06/12/2008 | NORTH WALL 2ND TIRE, WILL NEED COMPACTION REPORT WHEN COMPLETED | ED | ED | | BSP | P | 3690873 |
BRYAN CONSTRUCTION, INC. | BSP | P | 06/06/2008 | OK NORTH & WEST WALLS TO MID ELEVATIONS. | BOBB | BOBB | | BSP | P | 3688002 |
BRYAN CONSTRUCTION, INC. | BFI | P | 06/06/2008 | OK REMAINING FROST INSULATION AT LISTED AREAS ON APPROVED PLAN. | BOBB | BOBB | | BFI | P | 3687977 |
BRYAN CONSTRUCTION, INC. | BSP | T | 05/22/2008 | PAID (REC#807654) splice for change to site lighting | SHELBY | SHELBY | | BSP | T | 3680281 |
BRYAN CONSTRUCTION, INC. | BFN | P | 05/05/2008 | OK STRUCTURAL FLOOR; 6.3 TO 14 BETWEEN A & D.5 LINES. | BOBB | BOBB | | BFN | P | 3670891 |
BRYAN CONSTRUCTION, INC. | BFN | P | 05/01/2008 | OK STEEL FOR DOORWAY OPENING; N TO P ON 18 LINE. | BOBB | BOBB | | BFN | P | 3669254 |
BRYAN CONSTRUCTION, INC. | BSP | T | 04/21/2008 | PAID (REC#8083077)ADDITIONAL PLAN REVIEW TIME: $50.000 FROM: SHELBY NO ELECTRICAL | SHELBY | SHELBY | | BSP | T | 3652618 |
BRYAN CONSTRUCTION, INC. | BSP | T | 04/21/2008 | PAID (REC#803877)ADDITIONAL PLAN REVIEW TIME: $50.000 From: TCRIPPEN removed some plumbing things | TCRIPPEN | TCRIPPEN | | BSP | T | 3652625 |
BRYAN CONSTRUCTION, INC. | BSP | T | 04/21/2008 | PAID (REC#8083877) ADDITIONAL PLAN REVIEW TIME: $50.000 From: TCRIPPEN new gas line pages | TCRIPPEN | TCRIPPEN | | BSP | T | 3652632 |
BRYAN CONSTRUCTION, INC. | BFI | P | 04/11/2008 | OK 24" OF FROST INSULATION AT EXTERIOR WALLS. | BOBB | BOBB | | BFI | P | 3652779 |
BRYAN CONSTRUCTION, INC. | BFN | P | 04/07/2008 | OK REINFORCEMENT STEEL FOR DOORWAY OPENONGS AT SOUTH END OF BUILDING. | BOBB | BOBB | | BFN | P | 3652772 |
BRYAN CONSTRUCTION, INC. | BFN | P | 04/02/2008 | OK STEEL FOR PADS; A TO J ON 4 LINE. | BOBB | BOBB | | BFN | P | 3652765 |
BRYAN CONSTRUCTION, INC. | BFN | P | 03/27/2008 | OK STEEL AT DOORWAY OPENINGS . SEE APPROVED PLAN FOR LOCATIONS. | BOBB | BOBB | | BFN | P | 3652758 |
BRYAN CONSTRUCTION, INC. | BFI | P | 03/14/2008 | OK 12" FROST INSULATION & 36" AT FOUNDATION WALLS. | BOBB | BOBB | | BFI | P | 3652752 |
BRYAN CONSTRUCTION, INC. | BSP | T | 03/13/2008 | PAID (REC#796456)ADDITIONAL PLAN REVIEW TIME: $50.000 From: SHELLEY modified foundation plan | SHELLEY | SHELLEY | | BSP | T | 3652738 |
BRYAN CONSTRUCTION, INC. | BSP | T | 03/13/2008 | PAID (REC#796454)ADDITIONAL PLAN REVIEW TIME: $50.000 From: GARYL ADDITIONAL PLAN REVIEW FOR SERVICE UPGRADE. | GARYL | GARYL | | BSP | T | 3652744 |
BRYAN CONSTRUCTION, INC. | BFT | P | 03/12/2008 | ENGINEERS LETTER ON FILE FOR ADDITIONAL FOOTING PAD; ON 5 LINE AT A&B LINES. | BOBB | BOBB | | BFT | P | 3652730 |
BRYAN CONSTRUCTION, INC. | BFN | P | 03/10/2008 | OK WALLS; A TO K ON 5 LINE / 5 TO 16.3 ON A&B LINES / A TO H ON 16 & 16.3 LINES. | BOBB | BOBB | | BFN | P | 3652723 |
BRYAN CONSTRUCTION, INC. | BFI | P | 03/07/2008 | BOTTOM OF FOOTING INSULATING OK, NEED TO COMPLETE TOP OF FOOTING AND FOUNDATION WALL WHEN READY | ED | ED | | BFI | P | 3652716 |
BRYAN CONSTRUCTION, INC. | BSP | P | 03/07/2008 | VOID INSTALLED AT BOTTOM OF FOUNDATION WALL OK, AREA INSPECTED MARKED IN YELLOW. | ED | ED | | BSP | P | 3652709 |
BRYAN CONSTRUCTION, INC. | BFN | R | 03/07/2008 | STEEL REINCORCING CLEARANCES ARE NOT CORRECT, OUTSIDE FACE BARS TO TIGHT TO FORMS, PILASTER STEEL NEEDS CORRECT CLEARANCES, BOTTOM # 7 CORNER BARS NOT TIED TO HORIZONTAL BARS. | ED | ED | | BFN | R | 3652701 |
BRYAN CONSTRUCTION, INC. | BFT | P | 03/04/2008 | FOOTINGS AND PADS FOR MEZZANINE OKAY. SEE PLAN FOR YELLOW HIGHLIGHTED AREA INSPECTED. | LEEG | LEEG | | BFT | P | 3652695 |
BRYAN CONSTRUCTION, INC. | BFT | P | 03/03/2008 | OK FOOTINGS; A TO K ON 5 LINE / 5 TO 16 ON A LINE / A TO H ON 16 LINE / 16 TO 17.5 ON H LINE / PADFS; 7 TO 13 ON J LINE / K.8 & L.2 ON 17 LINE / 13 ON L LINE / 3.7 ON L LINE. | BOBB | BOBB | | BFT | P | 3652688 |
BRYAN CONSTRUCTION, INC. | BFI | P | 02/29/2008 | OK 12" OF FROST INSULATION AT BUILDING FOOTING . SEE APPROVED PLAN FOR LOCATIONS. | BOBB | BOBB | | BFI | P | 3652679 |
BRYAN CONSTRUCTION, INC. | BFT | P | 02/28/2008 | OK FOOTINGS; F TO Q ON 18 & 19 LINE, F TO N&M ON 21 LINE, 18 TO 20 ON R LINE, P TO R ON 20 LINE, 18 TO 20 ON P LINE , 18 TO 21 ON F LINE , 4.25 TO 21 ON N&M LINES. | BOBB | BOBB | | BFT | P | 3652673 |
BRYAN CONSTRUCTION, INC. | BFT | P | 02/26/2008 | OK FOOTINGS; 2 TO 6 ON S LINE , 2 TO 19.25 ON Q LINE , 4.5 , 5, & 6 LINES BETWEEN Q&S LINES, 10 TO 15 BETWEEN Q & T LINES, R.7 BETWEEN 10& 15 LINES. | BOBB | BOBB | | BFT | P | 3652665 |
BRYAN CONSTRUCTION, INC. | BFT | P | 02/22/2008 | Ok footings; N.9 to S on 1-line, 1 to 2 on N,9 line, 1 to 2 on Q line & S line, N.9 to S on 2- line. | BOBB | BOBB | | BFT | P | 3652657 |
BRYAN CONSTRUCTION, INC. | BFT | P | 02/21/2008 | 3000 psf / Ok footings; 3 to 5 on K-line, K to N on 3-line , 1 to 3 on M & N lines, N to N.5 on 1-line & 2-line , 1 to 2 on N.5 line, N.5 to N.9 on 1-line. | BOBB | BOBB | | BFT | P | 3652648 |
BRYAN CONSTRUCTION, INC. | BSP | T | 02/11/2008 | PAID (REC#791731)ADDITIONAL PLAN REVIEW TIME: $50.000 From: SHELBY | SHELBY | SHELBY | | BSP | T | 3652640 |
WEST ELECTRIC GROUP, INC. | E= | C | 11/03/2008 | | TIMA | TIMA | | E= | C | 3764592 |
WEST ELECTRIC GROUP, INC. | E= | P | 10/20/2008 | SERVICE BAYS ,ELECTRIC ROOM AND PARKING LOT LIGHTS OK | TIMA | TIMA | | E= | P | 3758036 |
WEST ELECTRIC GROUP, INC. | E= | P | 10/08/2008 | SHOW ROOM,SERVICE BAYS OK EXCEPT FOR LIFT HOOK UP,DETAIL SHOP OK NEED GFCI OUTLETS FOR VENDING MACHINES | TIMA | TIMA | | E= | P | 3752725 |
WEST ELECTRIC GROUP, INC. | E= | P | 10/01/2008 | SALES AREA AND ALL OFFICES OK | TIMA | TIMA | | E= | P | 3749059 |
WEST ELECTRIC GROUP, INC. | EP | C | 09/25/2008 | PANELS LA,HA,HM,HS OK | TIMA | TIMA | | EP | C | 3746019 |
WEST ELECTRIC GROUP, INC. | ER | C | 09/25/2008 | ALL DROP CEILINGS COMPLETE, ROOF TOP UNITS COMPLETE | TIMA | TIMA | | ER | C | 3746017 |
WEST ELECTRIC GROUP, INC. | EP | P | 09/22/2008 | PANEL BOARDS LM,LB,LS1 AND LS2 OK | TIMA | TIMA | | EP | P | 3743946 |
WEST ELECTRIC GROUP, INC. | ER | P | 09/22/2008 | RTU UNITS 2-7 OK,MUA UNIT 4 OK,ALL EXHAUST FANS OK | TIMA | TIMA | | ER | P | 3743943 |
WEST ELECTRIC GROUP, INC. | EP | P | 09/11/2008 | TRANSFORMERS T1,T2,TA,TM,TB OK PRIMARY AND SECONDARY OVERCURRENT PROTECTION OK | TIMA | TIMA | | EP | P | 3739416 |
WEST ELECTRIC GROUP, INC. | ES | C | 09/08/2008 | COMMERCIAL SERVICE: 1200 AMP 4/W 480V WEST ELECTRIC | TIMA | TIMA | | ES | C | 3737073 |
WEST ELECTRIC GROUP, INC. | ER | P | 09/08/2008 | CEILINGS MARKED ON SHEET E-1.2 OK | TIMA | TIMA | | ER | P | 3737070 |
WEST ELECTRIC GROUP, INC. | ER | P | 09/05/2008 | ALL CEILINGS MARKED ON SHEET E 1.2 OK | TIMA | TIMA | | ER | P | 3736532 |
WEST ELECTRIC GROUP, INC. | ES | R | 09/03/2008 | APPROVED DRAWINGS DON'T MATCH WHATS INSTALLED NEED DRAWINGS REVISED AND TAKEN THROUGH PLAN CHECK SERVICE OK AFTER THIS IS DONE | TIMA | TIMA | | ES | R | 3735179 |
WEST ELECTRIC GROUP, INC. | ER | P | 08/21/2008 | 2 X 4 TROFFERS IN HIGH BAY COMPLETE | JOSEPH | JOSEPH | | ER | P | 3728733 |
WEST ELECTRIC GROUP, INC. | ER | P | 08/20/2008 | PARTIAL DROP CEILING IN HIGH BAY AND OFFICE AREAS. THIS DOES NOT INCLUDE THE 2 X 4 TROFFERS IN HIGH BAY AREA!!!!!!!!!!!!!! | JOSEPH | JOSEPH | | ER | P | 3727966 |
WEST ELECTRIC GROUP, INC. | ER | R | 08/19/2008 | NOT READY | JOSEPH | JOSEPH | | ER | R | 3727267 |
WEST ELECTRIC GROUP, INC. | EUG | P | 07/24/2008 | ALL LIGHT POLES ON SOUTH SIDE OF BUILDING | JOSEPH | JOSEPH | | EUG | P | 3713391 |
WEST ELECTRIC GROUP, INC. | EUG | P | 07/22/2008 | see highlighted plans | MIKEC | MIKEC | | EUG | P | 3712067 |
WEST ELECTRIC GROUP, INC. | EUG | P | 07/18/2008 | marked on plans | MATTHEW | MATTHEW | | EUG | P | 3710914 |
WEST ELECTRIC GROUP, INC. | ER | P | 07/15/2008 | south offices walls and hard lids ok | TIMA | TIMA | | ER | P | 3708425 |
WEST ELECTRIC GROUP, INC. | ER | P | 07/11/2008 | walls marked on sheet e 1.1 ok | TIMA | TIMA | | ER | P | 3706306 |
WEST ELECTRIC GROUP, INC. | ER | P | 07/09/2008 | walls marked on drawings | TIMA | TIMA | | ER | P | 3705172 |
WEST ELECTRIC GROUP, INC. | EUG | P | 06/25/2008 | north site lighting & service secondarys ok | TIMA | TIMA | | EUG | P | 3697856 |
WEST ELECTRIC GROUP, INC. | EUG | P | 06/18/2008 | site lighting marked on sheet e1.0 | TIMA | TIMA | | EUG | P | 3694522 |
WEST ELECTRIC GROUP, INC. | EUG | P | 06/12/2008 | partial light poles | MIKEC | MIKEC | | EUG | P | 3691011 |
WEST ELECTRIC GROUP, INC. | EUG | P | 06/09/2008 | site lighting marked on plans e1.0 and elec room slab ok | MATTHEW | MATTHEW | | EUG | P | 3689165 |
WEST ELECTRIC GROUP, INC. | EUG | P | 05/29/2008 | SALES FLOOR SLAB OK | TIMA | TIMA | | EUG | P | 3683590 |
WEST ELECTRIC GROUP, INC. | EUG | P | 05/27/2008 | NORTH EXTERIOR BRANCH CIRCUT FEEDS OK | TIMA | TIMA | | EUG | P | 3681619 |
WEST ELECTRIC GROUP, INC. | EUG | P | 05/13/2008 | CONTINUATION OF 3.5IN AND 1IN PVC CONDUITS UNDER SLAB ACROSS GARAGE AREA. | DEAN | DEAN | | EUG | P | 3674895 |
WEST ELECTRIC GROUP, INC. | ESL | P | 05/05/2008 | FLOOR BOXES & 3" CAR WASH FEED OK | TIMA | TIMA | | ESL | P | 3670852 |
WEST ELECTRIC GROUP, INC. | ER | P | 04/24/2008 | ROOF DECK OK | TIMA | TIMA | | ER | P | 3652785 |
WEST ELECTRIC GROUP, INC. | EUG | P | 02/21/2008 | UFER OK | MATTHEW | MATTHEW | | EUG | P | 3652792 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 10/15/2008 | BALANCE REPORT IN IMAGES | JON | JON | | H= | C | 3756350 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | C | 10/10/2008 | GAS FINAL.. INSPECTED ON 10-10-08 | JON | JON | | H= | C | 3754229 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 10/09/2008 | NEED BALANCE REPORT | JON | JON | | H= | P | 3753706 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | P | 09/17/2008 | NEEDS LABELING AND ROOF INSPECTION. METER STILL NOT IN PLACE. | JON | JON | | H= | P | 3742173 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | C | 09/11/2008 | NEED ALL DRAINS AND PLUGS AT WATER HEATER AND VENTING, PERMITS AS NOTED PREVIOUSLY WITH APPROVED PLAN CORRECTIONS. WATER HEATERS TO MATCH SCHEDULE. | JON | JON | | HV | C | 3739389 |
HARMON - BONDED PLUMBING & HEATING, INC. | HC | C | 09/11/2008 | READY FOR METER | JON | JON | | HC | C | 3739388 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 09/08/2008 | TRAILER LOCKED.. SIGN CARD AND SEE DRAWINGS NEXT TRIP. OK FOR TILE AT ROOMS NORTH AND EAST OF SALES FLOOR ONLY. | JON | JON | | HD | P | 3736736 |
HARMON - BONDED PLUMBING & HEATING, INC. | HC | R | 08/26/2008 | NEED COMPLETED VENT INSPECTION. | JON | JON | | HC | R | 3731439 |
HARMON - BONDED PLUMBING & HEATING, INC. | HI | C | 08/26/2008 | 60 LB TEST OK. SIGN CARD NEXT TRIP. NEED APPROVAL FROM CSPU FOR 2# SYSTEM. REGULATORS AND PIPE LABELING BEFORE FINAL. RBD NOTE ALL REG'S WILL BE ON ROOF. | JON | JON | | HI | C | 3731437 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 08/15/2008 | Ductwork complete in the showroom and offices adjacent on the North and East. | JIMV | JIMV | | HD | P | 3726013 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 07/29/2008 | DRYER DUCT AND 2- FIRE DAMPER FRAME INSPECTIONS OK. NEED RETAINING ANGLES BEFORE FINAL. NEED PLANS REVISED FOR WATER HEATER NUMBER 2 SEE VENT NOTES, NEW FIRE DAMPER AND RETURN PATH FOR RTU-2 FOR STORAGE, SERVICE CHECK IN AND WARANTY AREAS. | JON | JON | | HD | P | 3715695 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | P | 07/29/2008 | WILL NEED PERMITS FOR 2 WATER HEATERS BEFORE FINAL. VENT OK FOR WATER HEATER NUMBER ONE. WATER HEATER NUMBER 2 WILL REQUIRE REVISED PLAN FOR CHANGING TO NON-DIRECT VENT. THIS DOES CREATE AN COMBUSTION AIR AND EXHAUST MAKEUP AIR ISSUE FOR THIS ROOM AND WILL HAVE TO MEET MINIMUM CODE FOR BOTH, NEED INSTRUCTIONS FOR WATER HEATER AS WELL. APPEARS THIS ROOM IS A RATED ROOM. | JON | JON | | HV | P | 3715673 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 07/21/2008 | READY FOR FLEX AND DIFFUSERS AT OFFICES AND FRONT AREA. STILL NEED FIRE DAMPER INSPECTION WHEN READY. SEE ALL PREVIOUS NOTES. | JON | JON | | HD | P | 3711153 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/13/2008 | UNDER GROUND EXHAUST DUCTING READY FOR COVER. | JON | JON | | HD | P | 3692089 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/05/2008 | OK FOR WRAP AT RTU'S 1-7. QUESTION RETURN TRANSFER AT RTU #2, SHOWS UNDERCUT ON 90 MINUTE DOOR ON M-SHEET, DOOR SCHEDULE INDICATES NO UNDERCUT. CALL SEPARATE FIRE DAMPER INSPECTION WHEN READY. NEED SEQUENCE OF OPERATION ON SERVICE BAY INFLOOR EXHAUST SYSTEM, MAKE-UP AIR ETC. DID NOT SEE ANY CO SENSORS NOTED ON PLANS FOR SERVICE BAYS. SMOKE DETECTORS BEFORE FINAL WHERE REQUIRED. | JON | JON | | HD | P | 3687487 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/04/2008 | OK TO COVER EXHAUST PVC PIPE IN TRENCHES WHERE NEEDED, STILL WORKING ON ARES WITH PIPE SADDLES. REVIEW PLANS NEXT TRIP. | JON | JON | | HD | P | 3686740 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 10/14/2008 | | LYNNIE | LYNNIE | | P= | C | 3755407 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 10/10/2008 | 1) LABEL ALL POTABLE NON-POTABLE LINES 2) REST ROOMS NOT MAKING MIN HOT WATER TO LAVS 3) DF X2 HAS LOW STREAMS | LYNNIE | LYNNIE | | P= | P | 3754173 |
HARMON - BONDED PLUMBING & HEATING, INC. | PRD | C | 07/25/2008 | | MICK | MICK | | PRD | C | 3714366 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | C | 07/25/2008 | WILL SEE REST OF WATER IN WATER METER ROOM AT FINALS--CHECK ON WATER HOSE REELS FOR PROTECTION AT FINALS | LYNNIE | LYNNIE | | PTO | C | 3714362 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 07/10/2008 | DWV COMPLETE | MICK | MICK | | PTO | P | 3705525 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 07/09/2008 | DWV ONLY. LEAKS AT 3X2" COUPLINGS IN TWO PLACES. WATER IN MECH ROOM AND MAINS TESTED. | MICK | MICK | | PTO | P | 3704728 |
HARMON - BONDED PLUMBING & HEATING, INC. | PRD | P | 06/10/2008 | WRAP VERTICAL SECTIONS THROUGH CONCRETE. NEED RISER CLAMPS AT BASE OF ALL VERTICAL DRAINS AFTER CONCTETE IS POURED. | MICK | MICK | | PRD | P | 3689408 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | C | 05/30/2008 | | MICK | MICK | | PB | C | 3684141 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 05/29/2008 | MECHANICAL, BREAK AND RESTROOMS, COFFEE BAR. | MICK | MICK | | PB | P | 3682996 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 05/20/2008 | WATER SERVICE STUB UP. | MICK | MICK | | PB | P | 3678483 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 05/16/2008 | SANITARY IN SHOWROOM OK. | MICK | MICK | | PB | P | 3677079 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 05/09/2008 | SERVICE AREA SANITARY AND SAND&OIL AIR TESTS OK. STUBBED UNDER AND THROUGH WALLS N,S AND WEST SIDES. | MICK | MICK | | PB | P | 3674130 |