ALEXANDHER BUILDING CO, INC. | B= | C | 04/30/2008 | | DALE | DALE | | B= | C | 3668853 |
ALEXANDHER BUILDING CO, INC. | BSP | T | 04/29/2008 | PAID (REC#803640): crac feeder per shelby...splice | KATHY | KATHY | | BSP | T | 3667552 |
ALEXANDHER BUILDING CO, INC. | B= | P | 03/26/2008 | complete all other inspections | DALE | DALE | | B= | P | 3661281 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 03/06/2008 | wall ok at basement | DALE | DALE | | BFR | P | 3661273 |
ALEXANDHER BUILDING CO, INC. | BSP | T | 03/04/2008 | PAID (REC#794852)ADDITIONAL PLAN REVIEW TIME: $50.000 From: MICHAEL splice changes to wall framing | MICHAELA | MICHAELA | | BSP | T | 3661258 |
ALEXANDHER BUILDING CO, INC. | BSP | T | 03/04/2008 | PAID (REC#794851)ADDITIONAL PLAN REVIEW TIME: $50.000 From: RUSSELL Revised mechanical plan layout | RUSSELL | RUSSELL | | BSP | T | 3661265 |
ALEXANDHER BUILDING CO, INC. | BFR | R | 02/05/2008 | WALLS OK PENDING OTHER INSPECTIONS | DALE | DALE | | BFR | R | 3661250 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 04/30/2008 | CRAC FEEDER HAS BEEN CHANGED TO AL AND APPROVED. | DEAN | DEAN | | E= | C | 3668275 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 04/17/2008 | ONE OF THE CRAC UNITS PHASE COLOR LABELS NEEDS TO BE CHANGED FROM BLACK TO BROWN, THE PLANS SHOW AL OPTION ON SOM OF THE FEEDERS BUT NOT FOR THE CRAC UNITS. APPROVED IS #4CU WITH #8GROUND. INSTALLED AL. NEED TO CHANGE ON PLANS AND RESUBMIT. | DEAN | DEAN | | E= | P | 3661242 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 03/25/2008 | STILL NEED TO INSPECT BOTH CRAC UNITS; LABEL ALL DISCONNECTS LABEL ALL PANELS WITH PHASE COLORS | JOSEPH | JOSEPH | | E= | P | 3661234 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ES | P | 03/14/2008 | Commercial Service: 1600 AMP 4 WIRE 277/480 VOLT ADDITION TO EXISTING SWITCHGEAR---OK FOR CSPU TO SHUT DOWN & RECONNECT FOR TIE-IN ON SATURDAY--TALKED TO KARI ANN | THOMAS | THOMAS | | ES | P | 3661227 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 03/14/2008 | grid cielings--IT & MEN'S & WOMENS LOCKER ROOMS===TRANSFORMER CONNECTIONS CORRECTED | THOMAS | THOMAS | | ER | P | 3661218 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | EP | P | 03/10/2008 | IN THE ELECTRICAL ROOM WITH THE NEW DISTRIBUTION PANEL AND 3 NEW STEP DOWN TRANSFORMERS WITH OVERCURRENT DEVICES ON SECONDARY SIDE OF TRANSFORMERS OK. ALSO CHECKED 3 NEW PANELS IN NEW DATA ROOM.------------NEED TO TERMINATE THE BUILDING STEEL GROUNDING ELECTRODE CONDUCTOR ON NEUTRAL BAR IN ALL 3 TRANSFORMERS.----------------- | DEAN | DEAN | | EP | P | 3661211 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 03/10/2008 | UNDER FLOOR WIRING FOR RECEPTS OK (METALIC FLEX). DEVICES ALL MARKED WITH PANEL AND CIRCUIT NUMBERS. | DEAN | DEAN | | ER | P | 3661204 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/06/2008 | WALLS | MIKEC | MIKEC | | ER | P | 3661197 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 04/17/2008 | HVAC FINAL, RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 3661189 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 03/21/2008 | OK TO DROP TILE. NEED TO SEE COMPUTOR ROOM AND ROOF WORK, BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3661181 |
PEAK HEATING & AIR CONDITIONING, INC. | HRP | C | 03/14/2008 | 4- 250# TESTS OK. NEED TO SEE ROOF WORK AT FINAL. | LYNNS | LYNNS | | HRP | C | 3661174 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 03/06/2008 | ROUGH DUCT OK TO INSULATE, NEED TO SEE CONDENSATE RUN TO AN APPROVED DRAIN AT FINAL. | LYNNS | LYNNS | | HD | C | 3661166 |
DRUMMOND PLUMBING LLC | P= | C | 02/26/2008 | | LEE | LEE | | P= | C | 3661301 |
DRUMMOND PLUMBING LLC | PTO | C | 02/11/2008 | SHEET A2.02 SHOWS SHOWERS BEING ADA SPECS, NOT TYPICIAL BASES? | LYNNIE | LYNNIE | | PTO | C | 3661294 |