NUNN CONSTRUCTION, INC. | B= | C | 10/06/2010 | All other required Final inspections are complete. (This is a computer generated result) | DANF | DANF | | B= | C | 4051650 |
NUNN CONSTRUCTION, INC. | B= | P | 10/12/2009 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396). BUILDING OK | DANF | DANF | | B= | P | 3897293 |
NUNN CONSTRUCTION, INC. | BE | L | 10/09/2009 | Renewed at 10/9/2009 8:41:31 AM | JIMP | JIMP | | BE | L | 3896329 |
NUNN CONSTRUCTION, INC. | BSP | P | 09/10/2008 | above ceiling ok | DALE | DALE | | BSP | P | 3738636 |
NUNN CONSTRUCTION, INC. | BSP | R | 08/13/2008 | seal all penatrations | DALE | DALE | | BSP | R | 3724762 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/10/2008 | wall ok pending other inspections | DALE | DALE | | BFR | P | 3706076 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 09/11/2008 | | MIKEC | MIKEC | | E= | C | 3739150 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | R | 09/04/2008 | EPO SHUTOFFS NOT INSTALLED | MIKEC | MIKEC | | E= | R | 3735650 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/23/2008 | SAME NEW WALL THAT MIKE INSPECTED. CONTRACTOR ADDED 5 NEW SETS OF RECEPTS AND LOW VOLT BOXES UP HIGH FOR TV'S. | DEAN | DEAN | | ER | P | 3713225 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/11/2008 | wall | MIKEC | MIKEC | | ER | P | 3706779 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 09/19/2008 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 3743096 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/04/2008 | FOR HVAC FINAL NEED BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3735527 |
HEATING & PLUMBING ENGINEERS, INC | HWP | C | 08/25/2008 | UNITS UP AND RUNNING. NO VISIBLE LEAKS SEEN AT TIME OF INSPECTION. CONDENSATE DRAINS INSTALLED. PIPING INSULATED. | NANCY | NANCY | | HWP | C | 3730305 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/25/2008 | NEED TO SEE TIE IN FROM HALLWAY TO INLET SIDE OF VAV 1. REST OF OFFICE AREA OK, OK TO DROP CEILING TILES PER MECHANICAL ONLY. IT CLEAN ROOM ALL OK. OK TO DROP TILES IN IT CLEAN ROOM PER MECHANICAL ONLY. NEED TO SEE NEW DUCT IN HALLWAY. | NANCY | NANCY | | H= | P | 3730294 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 08/13/2008 | CHILL LINESW FOR THREE AC UNITS OK. NEED TO DO A VISUAL CHECK AT FINAL. | LYNNS | LYNNS | | HWP | P | 3724545 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 07/24/2008 | PARTIAL ROUGH DUCT ON LOW PRESSURE DUCT DOWN STREAM OF VAV'S, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3713621 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 10/06/2008 | CONDENSATE DRAIN OK. | LYNNS | LYNNS | | P= | C | 3751533 |