J. C. FELDMAN CONSTRUCTION | B= | C | 11/13/2008 | | CHRISM | CHRISM | | B= | C | 3769275 |
J. C. FELDMAN CONSTRUCTION | BSP | T | 11/05/2008 | PAID (REC#835154) ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH splice | DALEH | DALEH | | BSP | T | 3765698 |
TOTAL PLUMBING INC. | BSP | T | 11/04/2008 | PAID (REC#834452) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages | TCRIPPEN | TCRIPPEN | | BSP | T | 3764967 |
J. C. FELDMAN CONSTRUCTION | BSP | T | 11/04/2008 | PAID (REC#835153) ADDITIONAL PLAN REVIEW TIME: $50 From: GARYL ELECTRICAL SPLICE FOR RELOCATED PANELS | GARYL | GARYL | | BSP | T | 3764919 |
J. C. FELDMAN CONSTRUCTION | BFR | P | 10/31/2008 | ok to start to drop ceiling tile, some penetrations in smoke wall | CHRISM | CHRISM | | BFR | P | 3763885 |
J. C. FELDMAN CONSTRUCTION | BSP | P | 10/16/2008 | above grip firechaulk some penetrations need work will need additional inspection | CHRISM | CHRISM | | BSP | P | 3757029 |
J. C. FELDMAN CONSTRUCTION | BFR | P | 09/23/2008 | walls ok | CHRISM | CHRISM | | BFR | P | 3744628 |
J. C. FELDMAN CONSTRUCTION | BFR | P | 09/15/2008 | walls ok after other roughs | CHRISM | CHRISM | | BFR | P | 3740611 |
J. C. FELDMAN CONSTRUCTION | BSP | P | 09/11/2008 | frming for tops of rated columns ok | CHRISM | CHRISM | | BSP | P | 3738948 |
FOSTER ELECTRIC CORPORATION | E= | C | 11/10/2008 | | GARYL | GARYL | | E= | C | 3767850 |
FOSTER ELECTRIC CORPORATION | E= | R | 11/07/2008 | NEED DUAL SWITCHING OR OCCUPANCY SENSORS IN 4 OFFICES | GARYL | GARYL | | E= | R | 3767282 |
FOSTER ELECTRIC CORPORATION | EP | R | 11/07/2008 | NEED TO IDENTIFY CIRCUITS CLEARLY IN PANELS, | GARYL | GARYL | | EP | R | 3767279 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/05/2008 | CEILINGS IN SUITE 100 | GARYL | GARYL | | ER | P | 3765769 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/31/2008 | trip fee need plans changed----ceiling ok to close------PLANS SPLICED 11-4-08 JERRY MILLER TRIP FEE REMOVED | ARNOLD | ARNOLD | | ER | P | 3763750 |
FOSTER ELECTRIC CORPORATION | ER | T | 10/29/2008 | PAID (REC#833404): TRIP FEE WILL BE DELETED WHEN PRINTS ARE DONE | GARYL | GARYL | | ER | T | 3762300 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/24/2008 | MC'S GOING INSIDE OF SHAFT TO A/C GFI AND FANS OK | GARYL | GARYL | | ER | P | 3760942 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/09/2008 | NEED TO GET A SPLICE ON NEW PANEL LOCATIONS... | GARYL | GARYL | | ER | P | 3753756 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/24/2008 | WALLS ONLY FOR UNIT #100 | GARYL | GARYL | | ER | P | 3745590 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/18/2008 | WALLS ONLY FOR #120 | GARYL | GARYL | | ER | P | 3742823 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | C | 11/12/2008 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 3768220 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 11/05/2008 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3766022 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 10/27/2008 | REMOVE ALL FIRE CAULKING AROUND ALL FIRE/SMOKE DAMPERS. OK TO DROP TILE EXCEPT AT F/S DAMPERS. | LYNNS | LYNNS | | H= | P | 3761521 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HV | P | 10/16/2008 | INSPECTION ON 3 EXHAUST DUCTS IN SHAFT. 12 INCH ROUND FOR DAVITA REUSE ROOM OK, COMPLETE WHEN SCAFFOLD IS REMOVED. 10 INCH ROUND DAVITA TOILET EXHAUST OK, COMPLETE WHEN SCAFFOLD IS REMOVED. RECTANGULAR EXHAUST DUCT OK, OK TO WRAP FIRST TEN FEET AS REQUIRED ON PRINTS. COMPLETE WHEN SCAFFOLD IS REMOVED. NOTE: THE RECTANGULAR DUCT IS FOR THE JULIE PENROSE LEARNING CENTER. | NANCY | NANCY | | HV | P | 3756663 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/15/2008 | PARTIAL ROUGH DUCT ON M.1 SOUTH SIDE, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3740846 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/12/2008 | HHD EXAM OK TO WRAP. FROM NORTH SIDE OF SPACE TO C LINE OK TO WRAP. SEE SHEET M1. DUCTS IN WALL OK TO COVER. 3 SMOKE DAMPERS OK. SEE SHEET M2. | NANCY | NANCY | | HD | P | 3739545 |
TOTAL PLUMBING INC. | P= | C | 11/07/2008 | | JEFF | JEFF | | P= | C | 3766900 |
TOTAL PLUMBING INC. | PTO | C | 11/07/2008 | | JEFF | JEFF | | PTO | C | 3766897 |
TOTAL PLUMBING INC. | P= | P | 10/30/2008 | PTO TO BE COMPLETED, NEED REVISED PLANS APPROVED(INSPECTOR REVIEWED AND DO MATCH SCOPE OF WORK), DOME STRAINERS MISSING IN FLOOR SINKS, PLANS CALL FOR TRAP PRIMERS AT ALL FLOOR DRAINS, REST OK | JEFF | JEFF | | P= | P | 3763446 |
TOTAL PLUMBING INC. | P16 | C | 10/30/2008 | Revised to update plans to coincide with previous base plumbing plans done by first contractor. | KYE | KYE | | P16 | C | 3762929 |
TOTAL PLUMBING INC. | PTO | P | 09/17/2008 | plans being revised, agreement made to use studor vents on risers in combination drain and vent system that have multiple traps, rest ok, pto complete less water heater and water treatment room | JEFF | JEFF | | PTO | P | 3741644 |
TOTAL PLUMBING INC. | PTO | P | 09/16/2008 | still have issues with plans and design | JEFF | JEFF | | PTO | P | 3741589 |
TOTAL PLUMBING INC. | PTO | R | 09/08/2008 | wraps missing, contractor to provide information for cross connection protection at p-6 x 3, all vents must drain, work performed does not match approved plans, provide approved plans that match work performed, need to properly vent drainage system(whether upc or ipc) | JEFF | JEFF | | PTO | R | 3736697 |