GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 01/08/2010 | | MIKE | MIKE | | B= | C | 3930759 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 01/08/2010 | | DANF | DANF | | BFR | C | 3930710 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BE | L | 09/29/2009 | Renewed at 9/29/2009 2:47:11 PM | MINDY | MINDY | | BE | L | 3891434 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 09/23/2009 | PAID (REC#878363) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice for two new mechanical sheets | DALEH | DALEH | | BSP | T | 3888659 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/05/2009 | 2ND FLOOR NORTH WING, STERILE STORAGE ONLY; FIRE SIGNED OFF PERMIT | DANF | DANF | | B= | P | 3809114 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/25/2009 | FIRECAULKING AT CORE BOARD SHAFTS ON 3RD FLOOR; 2 ON NORTH WING AND 2 AT WEST WING AND AT PENTHOUSE OK | DANF | DANF | | BFR | P | 3805886 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/11/2009 | 3RD FLOOR NORTH WING 2 SHAFTS, WEST WING 2SHAFTS AND PENTHOUSE OK PENDING FIRECAULKING AT PENETRATION AND EDGES; NEED MECHANICAL INPECTION OF DAMPERS | DANF | DANF | | BFR | P | 3801082 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 12/29/2008 | PAID (REC#845982) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY 10 new pages to reflect mechanical changes | SHELBY | SHELBY | | BSP | T | 3785790 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 12/23/2008 | PAID (REC#845981) ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH splice for sdding new mechanical sheets | DALEH | DALEH | | BSP | T | 3784782 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/17/2008 | 2nd floor stairle area north wing; men locker room; coustodian closet shafts OK | DANF | DANF | | BSP | P | 3782927 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/26/2008 | FLOOR CEILING PENETRATION OK; STILL NEED 2 SHAFTS INSTALLED 2ND FLOOR TO 3RD FLOOR | DANF | DANF | | BSP | P | 3775694 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/21/2008 | 1ST FLOOR NORTH WING FRAMING OK PENDING MECHANICAL SHAFT FRAMING AND 2 FLOOR CEILING PENETRATIONS TO STORAGE ROOM ABOVE; WEST WING FRAMING OK PENDING FLOOR CEILING PENTRATIONS TO WOMENS AND MENS LOCKER ROOMS ABOVE; 2ND FLOOR STORAGE ROOM FRAMING OK PENDING 18" DIA PENETRATION TO 3RD FLOOR AND 3 SHAFTS TO BE BUILT | DANF | DANF | | BFR | P | 3773432 |
GREEN ELECTRIC INC | E= | C | 11/20/2009 | | MIKEC | MIKEC | | E= | C | 3914257 |
GREEN ELECTRIC INC | ER | C | 11/20/2009 | | MIKEC | MIKEC | | ER | C | 3914255 |
GREEN ELECTRIC INC | EE | L | 10/12/2009 | Renewed online for 1/2 Fee at 10/12/2009 11:55:27 AM (RECEIPT #: 880367) | WEBSITE | WEBSITE | | EE | L | 3897069 |
GREEN ELECTRIC INC | E= | P | 02/26/2009 | FIRE ROUGH COMPLETE | BRET | BRET | | E= | P | 3806375 |
GREEN ELECTRIC INC | ER | C | 02/26/2009 | BASEMENT 1ST AND 3RD FLOORS | BRET | BRET | | ER | C | 3806371 |
GREEN ELECTRIC INC | ER | P | 01/09/2009 | --------------CONTRACTOR TO PULL SEPARATE STAND ALONE PERMIT FOR FIRE ALARM-----------------2ND FLOOR STERILIZATION STORAGE ROOM OK. | DEAN | DEAN | | ER | P | 3789712 |
GREEN ELECTRIC INC | ER | P | 01/08/2009 | 2ND FLOOR STERILE STORAGE ROOM CEILING, INCLUDING THE CEILING OF THE CORRIDOR LEADING INTO THE ROOM FROM THE SOUTH. | DEAN | DEAN | | ER | P | 3788977 |
GREEN ELECTRIC INC | ER | P | 12/02/2008 | 1ST FLOOR WALLS AND LID OK | BRET | BRET | | ER | P | 3776665 |
GREEN ELECTRIC INC | ER | P | 11/20/2008 | PARTIAL WALLS SEE ELECTRICAIN SET OF PLANS FOR LOCATIONS. (1ST FLOOR EAST, NORTH AND SOUTH OFFICES. 2ND FLOOR NORTH WING WALLS OK). | BRET | BRET | | ER | P | 3772651 |
COLORADO SHEET METAL CO., INC. | H= | C | 01/07/2010 | RECEIVED BALANCE REPORT. | LYNNS | LYNNS | | H= | C | 3929953 |
COLORADO SHEET METAL CO., INC. | H= | P | 12/17/2009 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3923810 |
COLORADO SHEET METAL CO., INC. | HD | P | 11/19/2009 | SHEET M-101 SOUTH 1ST FLOOR, REGISTERS INSTALLED. NEED TO SEE UNIT FOR ENTRYWAY AND DUCT. | LYNNS | LYNNS | | HD | P | 3913652 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/29/2009 | FIRE SMOKE DAMPERS ON SHEET M100A OK. | LYNNS | LYNNS | | HD | P | 3904874 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/16/2009 | M SHEET 101-A SOUTH 1ST FLOOR CORRIDOR EAST AND WEST 10 HOT DECK COLD DECK BOXES OK FOR COVER. | JON | JON | | HD | P | 3899488 |
COLORADO SHEET METAL CO., INC. | HE | L | 10/15/2009 | Renewed for 1/2 Fee at 10/15/2009 8:48:11 AM (Receipt#880990) | JAN | JAN | | HE | L | 3898540 |
COLORADO SHEET METAL CO., INC. | H= | P | 03/06/2009 | RECEIVED BALANCE REPORT. Second floor only. | LYNNS | LYNNS | | H= | P | 3809308 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/27/2009 | ROUGH DUCT AND FANS FOREF-01, 02 AND 03. OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3806920 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/12/2009 | PARTIAL HVAC FINAL FOR ALL OF 2ND FLOOR ONLY OK. NEED BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3801628 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/12/2009 | ALL FIRE/SMOKE DAMPERS OK, EXHAUST RISERS ON 3RD FLOOR AND PENTHOUSE OK. | LYNNS | LYNNS | | HD | P | 3801627 |
COLORADO SHEET METAL CO., INC. | HD | P | 01/09/2009 | FIRE/SMOKE DAMPERS FOR DR'S LOCKER ROOM, SHAFT SOUTH OF DR'S LOUNGE, 2ND FLOOR STERILE STORAGE, ALL OK. | LYNNS | LYNNS | | HD | P | 3789409 |
COLORADO SHEET METAL CO., INC. | HD | P | 12/19/2008 | FIRST FLOOR EXHAUST DUCT AND FLOOR F/S DAMPERS OK. ELEVATOR SHAFT DAMPERS ON 2ND AND 3RD FLOORS OK. | LYNNS | LYNNS | | HD | P | 3784064 |
COLORADO SHEET METAL CO., INC. | HD | P | 11/24/2008 | EXHAUST IN SOFFITS ON FIRST FLOOR, NORTH AND WEST CORRIDORS, OK. NEED TO SEE FIRE/SMOKE DAMPERS YET. | LYNNS | LYNNS | | HD | P | 3774072 |