DSP BUILDERS INC | B= | C | 12/11/2009 | OTHER FINALS COMPLETED | DANF | DANF | | B= | C | 3921466 |
DSP BUILDERS INC | B= | R | 08/03/2009 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), . BUILDING OK; NEED FIRE AND HEATING FINALS | DANF | DANF | | B= | R | 3866790 |
DSP BUILDERS INC | BSP | T | 05/20/2009 | PAID (REC#866290) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY splice two pages | SHELBY | SHELBY | | BSP | T | 3836595 |
DSP BUILDERS INC | BSP | T | 05/14/2009 | PAID (REC#866291) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY changed breakroom layout | SHELLEY | SHELLEY | | BSP | T | 3834722 |
DSP BUILDERS INC | BSP | T | 05/14/2009 | PAID (REC#866292) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice page moved sinks | TCRIPPEN | TCRIPPEN | | BSP | T | 3834709 |
DSP BUILDERS INC | BFR | P | 05/07/2009 | walls are still ok pending other rough plumb, elec and mech inspections/ 2 hour stair enclosure still not repaired, showed drywaller brian of rocky mtn interior construction where repair needs to take place | BLAKE | BLAKE | | BFR | P | 3832242 |
DSP BUILDERS INC | BFR | P | 05/04/2009 | WALLS OK; NEED TO CHECK REPAIR ABOVE GRID OF 2HR STAIRWELL ENCLOURE BEFORE FINAL | DANF | DANF | | BFR | P | 3830483 |
ROCK ELECTRIC | E= | C | 06/12/2009 | | MIKEC | MIKEC | | E= | C | 3845354 |
ROCK ELECTRIC | ER | C | 06/04/2009 | ceiling | MIKEC | MIKEC | | ER | C | 3842185 |
ROCK ELECTRIC | ER | P | 05/05/2009 | walls | MIKEC | MIKEC | | ER | P | 3831161 |
ROCK ELECTRIC | ER | P | 05/04/2009 | dem. wall | MIKEC | MIKEC | | ER | P | 3830512 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 09/22/2009 | RECEIVED BALANCE REPORT APPROVED BY ENGINEER. | LYNNS | LYNNS | | H= | C | 3887876 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 07/29/2009 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 3864523 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | R | 07/27/2009 | TILE STILL NOT REMOVED AT VAV 1&2 FOR ROUGH DUCT AND NEED TILE OUT AT REGISTERS FOR FINAL. | LYNNS | LYNNS | | H= | R | 3863244 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | R | 07/24/2009 | TILE DROPPED. | LYNNS | LYNNS | | H= | R | 3862666 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 07/06/2009 | ROUGH DUCT COMPLETE. NEED TO SEE MEDIUM PRESSURE FLEX TO NEW VAV AT FINAL. | LYNNS | LYNNS | | HD | C | 3854262 |
CHIEF MECHANICAL CONTRACTORS, INC. | P= | C | 07/20/2009 | scanned letter | JOEL | JOEL | | P= | C | 3860100 |
CHIEF MECHANICAL CONTRACTORS, INC. | P= | T | 07/13/2009 | PAID (REC#867079): DID NOT INSTALL ISOLATION BALL VALVE ABOVE CHECK AS NOTED ON LAST INSPECTION, NEED APPROVAL LETTER WITH SUITE # FOR D/W ON EJECTOR | LEE | LEE | | P= | T | 3857363 |
CHIEF MECHANICAL CONTRACTORS, INC. | P= | P | 07/06/2009 | INSTALL BALL VALVE ABOVE CHECK VALVE, DISHWASHER ADDED TO EJECTOR PIT, GPM CAPACITY IN QUESTION, PTO INCOMPLETE ?? | LEE | LEE | | P= | P | 3854486 |
CHIEF MECHANICAL CONTRACTORS, INC. | PTO | R | 05/11/2009 | NO APPROVED PLANS ON SITE | JOEL | JOEL | | PTO | R | 3833095 |