PALACE HOMES, INC. | B= | C | 04/30/2012 | | JOHNP | JOHNP | | B= | C | 4303524 | PALACE HOMES, INC. | BE | L | 01/12/2012 | Renewed for 1/2 Fee at 1/12/2012 9:58:34 AM (Receipt#1022383) | BPHILLIPS | BPHILLIPS | | BE | L | 4258803 | PALACE HOMES, INC. | BFR | C | 05/27/2011 | | JOHNP | JOHNP | | BFR | C | 4155778 | PALACE HOMES, INC. | BIN | C | 05/27/2011 | | JOHNP | JOHNP | | BIN | C | 4155772 | PALACE HOMES, INC. | BSP | T | 05/26/2011 | PAID (REC#977054) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised window wall framing and remove deck (grade doesn't allow deck) | SHELLEY | SHELLEY | | BSP | T | 4155536 | PALACE HOMES, INC. | BSP | P | 12/01/2010 | Retaining wall - OK to pour, need revised design, wrap sewer pipe penetration | JOHNP | JOHNP | | BSP | P | 4078511 | PALACE HOMES, INC. | BLA | C | 10/25/2010 | | JOHNP | JOHNP | | BLA | C | 4060787 | PALACE HOMES, INC. | BLA | C | 10/22/2010 | | JOHNP | JOHNP | | BLA | C | 4060250 | PALACE HOMES, INC. | BFR | P | 10/22/2010 | Strap peak, corners & plate breaks. Need plans stamped by RBD to delete deck & change great wall construction | JOHNP | JOHNP | | BFR | P | 4060249 | PALACE HOMES, INC. | BLA | C | 10/22/2010 | | JOHNP | JOHNP | | BLA | C | 4060235 | PALACE HOMES, INC. | BLA | P | 10/08/2010 | OK TO START - CHECK DOOR FLASHING AT FINAL | JOHNP | JOHNP | | BLA | P | 4053083 | PALACE HOMES, INC. | BE | C | 08/13/2010 | | TERRI | TERRI | | BE | C | 4024614 | PALACE HOMES, INC. | BFD | C | 09/29/2009 | | JOHNP | JOHNP | | BFD | C | 3891004 | PALACE HOMES, INC. | BFI | C | 09/29/2009 | | JOHNP | JOHNP | | BFI | C | 3891000 | PALACE HOMES, INC. | BFN | C | 09/24/2009 | NO EUFER GROUND, SOILS & DESIGN PICKED UP, NO DRAIN REQUIRED | JOHNP | JOHNP | | BFN | C | 3889199 | PALACE HOMES, INC. | BFT | C | 09/18/2009 | SOILS4000PSF-DESIGN4000PSF/NEED STAMPED OPEN HOLE AND CLEAN DESIGN | BERTW | BERTW | | BFT | C | 3887129 | JAGUAR ELECTRIC INC | E= | C | 03/30/2012 | | MIKEC | MIKEC | | E= | C | 4290547 | JAGUAR ELECTRIC INC | E= | R | 03/27/2012 | equipment ground bar not connected to enclosure,protect wire in unfinished area | MIKEC | MIKEC | | E= | R | 4288577 | JAGUAR ELECTRIC INC | ER | P | 10/11/2010 | GROUND BAR NOT CONNECTED TO ENCLOSURE, DID NOT SEE DRAIN IN EQUIPMENT ROOM AT END OF POOL 680.11 | MIKEC | MIKEC | | ER | P | 4054413 | JAGUAR ELECTRIC INC | EUG | C | 01/13/2010 | Ok per Mike C. | DEAN | DEAN | | EUG | C | 3932286 | JOLLY PLUMBING & HEATING INC. | H= | C | 03/21/2012 | OK | DAVIDH | DAVIDH | | H= | C | 4285475 | JOLLY PLUMBING & HEATING INC. | HE | L | 03/20/2012 | Renewed for 1/2 Fee at 3/20/2012 12:17:50 PM (Receipt#1034064) | JANE | JANE | | HE | L | 4285062 | DOUBLE J GAS, INC. | H= | C | 10/18/2010 | 10 LB TEST OK TO SPA ROOM NOTE BOILER AND W/H | DAVIDH | DAVIDH | | H= | C | 4057417 | DOUBLE J GAS, INC. | HO | C | 10/18/2010 | 10 lb OK TO POOL HOUSE | DAVIDH | DAVIDH | | HO | C | 4057408 | BARKER HEATING, INC. | H= | C | 10/15/2010 | OK | DAVIDH | DAVIDH | | H= | C | 4056725 | BARKER HEATING, INC. | HV | C | 10/15/2010 | OK NOTE 1 BATH EXHAUST FAN | DAVIDH | DAVIDH | | HV | C | 4056721 | DOUBLE J GAS, INC. | H= | P | 02/25/2010 | GAS LINE TO FIREPIT OK - changing to partial because additional gas lines added 10/15/10 | DAVIDH | DAVIDH | | H= | P | 3948116 | DOUBLE J GAS, INC. | HO | P | 02/19/2010 | NEED PAST INSPECTION NOTES ADDRESSED. NEED TRACER WIRE COMPLETED ALL THE WAY TO RISER AT HOUSE. ALL CONCEALED AT THIS TIME. HAS TEST COMPLETE TO INSIDE LINE. NEED TO ALSO SEE TIE IN AT SOURCE INSIDE HOUSE BEFORE FINAL. CHANGD STATUS TO ENABLE HO INSPECTION | JON | JON | | HO | P | 3945785 | DOUBLE J GAS, INC. | HI | C | 02/19/2010 | INSIDE LINE FOR FIRE PIT, TEST OK. | JON | JON | | HI | C | 3945779 | JOLLY PLUMBING & HEATING INC. | HWP | P | 10/16/2009 | lower level. | MARTY | MARTY | | HWP | P | 3899289 | DOUBLE J GAS, INC. | HO | P | 09/14/2009 | INSPECTED DITCH CONTRACTOR TO TAKE PICTURES OF SCH 80 PIPE INGROUND AND ALONG SIDE OF FOUNDATION AT NEXT INSPECTION THIS IS FOR FUTURE USE NO GAS OR TRACER WIRE IN GROUND AT THIS TIME.PICTURES SENT OK | DAVIDH | DAVIDH | | HO | P | 3884530 | JOLLY PLUMBING & HEATING INC. | P= | C | 04/27/2012 | future bar sink and shower | JOEL | JOEL | | P= | C | 4302925 | JOLLY PLUMBING & HEATING INC. | PTO | C | 10/14/2010 | | MARTY | MARTY | | PTO | C | 4056116 | JOLLY PLUMBING & HEATING INC. | PTO | C | 10/14/2010 | | MARTY | MARTY | | PTO | C | 4056524 | JOLLY PLUMBING & HEATING INC. | PB | C | 10/06/2009 | no permit | MARTY | MARTY | | PB | C | 3894737 |
|
|