ROBINSON CONSTRUCTION, LLC. | B= | C | 10/19/2011 | All other required Final inspections are complete. (This is a computer generated result) | BLAKE | BLAKE | | B= | C | 4224149 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 10/17/2011 | Additional Inspections Required: HOGAN MECHANICAL, INC Plumbing Final Inspection is not Completed yet. shell is complete | BLAKE | BLAKE | | B= | P | 4222216 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 09/23/2011 | Fire barrier wall in Unit #110 2nd layer - Complete sheetrock screws at studs against front & rear walls | MIKE | MIKE | | BSP | P | 4211564 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 09/21/2011 | Fire barrier wall Unit # 110 1st Layer - Need to complete screws at corners & at exterior walls | MIKE | MIKE | | BSP | P | 4210308 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 09/16/2011 | Unit #110 Fire Barrier Wall - 1st layer of 5/8" sheetrock not screwed off as specified in UL listing (remove 2nd layer, screw 1st layer per design, recall for 1st layer inspection) | MIKE | MIKE | | BSP | R | 4208468 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 09/14/2011 | Unit #110 Fire Barrier Wall - Framing ok, Need to inspect double layer of sheetrock & through penetration protection | MIKE | MIKE | | BFR | P | 4207292 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 08/30/2011 | Unit #110 fire barrier wall - Need to complete framing at bar joist & steel beam | MIKE | MIKE | | BSP | P | 4200501 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 03/04/2011 | unit #150 exterior wall insulation r13 OK | DANF | DANF | | BSP | P | 4118753 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 02/17/2011 | PAID (REC#962261): Unit #140 - Caulk collar at roof drain in 2hr fire barrier not complete as specified on UL listed design (3rd trip) | MIKE | MIKE | | BSP | T | 4112576 |
ROBINSON CONSTRUCTION, LLC. | BSP | L | 02/16/2011 | Dave not in Unit #150, His phone number is disconnected | MIKE | MIKE | | BSP | L | 4111688 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 12/21/2010 | Unit #140 - Caulk collar at roof drain in 2hr fire barrier not complete as specified on UL listed design | MIKE | MIKE | | BSP | R | 4088532 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 12/20/2010 | Caulk collar at plastic drain line through fire barrier wall - Need UL listed design, Installation not complete | MIKE | MIKE | | BSP | R | 4087853 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 11/19/2010 | Fire barrier walls Unit #120 - Need to complete through penetration protection | MIKE | MIKE | | BFR | P | 4074338 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 11/15/2010 | Fire barrier walls at unit #120 - Need approved fire barrier wall at Unit #140, Complete all fire caulking | MIKE | MIKE | | BSP | P | 4071691 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 11/12/2010 | Items listed on 11/10 not corrected, Still need stud at end of sheetrock in utility room wall | MIKE | MIKE | | BSP | R | 4070954 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 11/10/2010 | Fire barrier walls at Unit #120 - Need framing/fire caulking detail for slip track under steel bar joist, Need top track head wall design, Need to complete all putty pack at back to back electric boxes, Need approved 2hr fire barrier wall at Little Ceasers | MIKE | MIKE | | BSP | R | 4069739 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 10/29/2010 | Fire barrier walls at Unit #120 - Need electric rough inspection, Ok to start 1st layer of sheetrock where no electric required, Still need to install putty packs at new electric boxes | MIKE | MIKE | | BFR | P | 4063913 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 10/29/2010 | Reviewed stair enclosure ?'s to roof top dining | MIKE | MIKE | | BSP | P | 4063909 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 10/29/2010 | Unit #110 - Exterior wall insulation ok, Need window & door U-Factor cert | MIKE | MIKE | | BFR | P | 4063907 |
ROBINSON CONSTRUCTION, LLC. | BIN | P | 10/29/2010 | Unit #120 - Exterior wall insulation ok, Need window cert. | MIKE | MIKE | | BIN | P | 4063906 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 10/21/2010 | 2hr fire barrier wall at unit #130 - Work not complete | MIKE | MIKE | | BSP | R | 4059787 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 09/13/2010 | 2hr Fire Barrier walls at Unit #130 - Framing ok, Complete per approved design | MIKE | MIKE | | BFR | P | 4038723 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 08/23/2010 | Temp CO: all inspections partial and safty plan scanned in ( Expires: 9/22/2010 12:00:00 AM) | JIMP | JIMP | | B= | P | 4028122 |
ROBINSON CONSTRUCTION, LLC. | B= | P | 08/20/2010 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977), MEYER ELECTRIC Electrical Final Inspection is not Completed yet. eng and fire still not signed off/ items 3,4, and 5 still need to be completed (items 4 and 5 to be done later per jim pepper) -- Schedule a new Building Final when above items are complete. | BLAKE | BLAKE | | B= | P | 4027833 |
ROBINSON CONSTRUCTION, LLC. | B= | R | 08/19/2010 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: ngadson@springsgov.com or 385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977), COLORADO GAS SYSTEMS Mechanical Final Inspection is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet, MEYER ELECTRIC Electrical Final Inspection is not Completed yet. 1)NEED OTHER MEP FINALS 2) FIRE FINAL IS PARTIALED 3) COMPLETE FRONT AWNING STEEL SKIN 4) FRAMING STRUCTURAL ELEMETS OK; STILL NEED RATED DEMISING WALLS ROCKED AND FIRECAULKED 5)INSULATION FOR SHELL OKED TO BE COMPLETED AS TI DONE | DANF | DANF | | B= | R | 4027116 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | BSP | T | 08/19/2010 | PAID (REC#927232): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice for relocated rtus and gas piping | DALEH | DALEH | | BSP | T | 4026879 |
ROBINSON CONSTRUCTION, LLC. | B= | R | 08/18/2010 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: ngadson@springsgov.com or 385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: enijkamp@springsgov.com or 385-5977), COLORADO GAS SYSTEMS Mechanical Final Inspection is not Completed yet, ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet, MEYER ELECTRIC Electrical Final Inspection is not Completed yet. Not ready for final inspection, Reviewed with supt. Dave | MIKE | MIKE | | B= | R | 4026375 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 08/17/2010 | Front awning framing ok | MIKE | MIKE | | BSP | P | 4025884 |
ROBINSON CONSTRUCTION, LLC. | BIN | P | 08/16/2010 | Unit #140 ok | MIKE | MIKE | | BIN | P | 4025040 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 08/13/2010 | Awning framing - Missing plates at through bolts, Missing through bolts, Tighten all bolts | MIKE | MIKE | | BFR | P | 4024280 |
ROBINSON CONSTRUCTION, LLC. | BIN | R | 08/13/2010 | Unit #140 - Need R-13 per approved IECC | MIKE | MIKE | | BIN | R | 4024273 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 08/12/2010 | Roof inspection - Work not complete | MIKE | MIKE | | BSP | R | 4023812 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 08/11/2010 | Reviewed final inspection ?'s | MIKE | MIKE | | BSP | P | 4023056 |
MEYER ELECTRIC | BSP | T | 08/10/2010 | PAID (REC#925389) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Splice to address inspector comments | SHELBY | SHELBY | | BSP | T | 4022577 |
ROBINSON CONSTRUCTION, LLC. | BFR | R | 08/04/2010 | Common wall framing - Work not complete, Reviewed framing & fire caulk requirements with supt. | MIKE | MIKE | | BFR | R | 4019467 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 07/30/2010 | PAID (REC#923436): PLAN SPLICE FEE: $50 by: JAY for Construction: Add rated demising wall (A-2.2) | JAY | JAY | | BSP | T | 4017384 |
ROBINSON CONSTRUCTION, LLC. | BLA | C | 07/27/2010 | | MIKE | MIKE | | BLA | C | 4015295 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 07/27/2010 | Received Structural Steel Inspection Report from EEC(40838), Splice plans for revised common walls are in for review per Fred Robinson | MIKE | MIKE | | BFR | P | 4015294 |
ROBINSON CONSTRUCTION, LLC. | BIN | P | 07/27/2010 | Roof insulation ok, Revised IECC approved by plan check | MIKE | MIKE | | BIN | P | 4015288 |
ROBINSON CONSTRUCTION, LLC. | BFR | R | 07/23/2010 | Splice plan for interior common walls - Common walls do not reflect separated use as specified on Code Study Form | MIKE | MIKE | | BFR | R | 4014082 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 07/23/2010 | Sign band framing complete | MIKE | MIKE | | BSP | P | 4014078 |
ROBINSON CONSTRUCTION, LLC. | BLA | P | 07/23/2010 | Sign band - West side ok | MIKE | MIKE | | BLA | P | 4014077 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 07/22/2010 | PAID (REC#921672): Framing for sign border/parapet - Still need engineer/arch approved revised framing design/attachment, More framing covered without inspection | MIKE | MIKE | | BSP | T | 4013320 |
ROBINSON CONSTRUCTION, LLC. | BLA | P | 07/22/2010 | Sign band - Lath on north side of building ok, Must install cap flashing on top of columns & at low areas of parapet as detailed on approved plans | MIKE | MIKE | | BLA | P | 4013312 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 07/22/2010 | PAID (REC#921675): PLAN SPLICE FEE: $50 by: JAY for Construction: add demising wall / add det 7/A5.01 / ComCheck update | JAY | JAY | | BSP | T | 4013218 |
ROBINSON CONSTRUCTION, LLC. | BLA | R | 07/20/2010 | Not ready - Work not complete | MIKE | MIKE | | BLA | R | 4012192 |
ROBINSON CONSTRUCTION, LLC. | BSP | R | 07/20/2010 | Framing for sign border west side - Framing covered without inspection | MIKE | MIKE | | BSP | R | 4012190 |
ROBINSON CONSTRUCTION, LLC. | BIN | R | 07/14/2010 | Unit #100 - R13 wall insulation ok, Rejected roof insulation is being covered without reinspection, Missing all windows & doors | MIKE | MIKE | | BIN | R | 4009590 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 07/14/2010 | Framing for sign border north exterior wall - Construction does not match design, Need engineer revised design | MIKE | MIKE | | BSP | P | 4009588 |
ROBINSON CONSTRUCTION, LLC. | BIN | P | 07/09/2010 | ROOF INSULATION IS 3" FOR R18.1, IECC REQUIRES R24. NEED REVISED IECC FOR REDUCED INSULATION ON ROOF | DANF | DANF | | BIN | P | 4007600 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 07/08/2010 | EXTERIOR FURRED WALLS OK; NEED ENGINEER'S LETTER FOR STRUCTURAL ELEMENTS OF BUILDLING | DANF | DANF | | BFR | P | 4006885 |
ROBINSON CONSTRUCTION, LLC. | BTR | R | 07/08/2010 | INSPECTION COULD NOT BE DONE DUE TO WEATHER CONDITIONS; RECALL | DANF | DANF | | BTR | R | 4006858 |
ROBINSON CONSTRUCTION, LLC. | BBB | C | 06/22/2010 | BOND BEAMS OK; NEED ENGINEER'S LETTER FOR STEEL AND ROOF BAR JOIST FRAMING TO COMPLETE FRAMING | DANF | DANF | | BBB | C | 3998792 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 05/25/2010 | PAID (REC#911346): ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice page adding interceptor | TCRIPPEN | TCRIPPEN | | BSP | T | 3986359 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 05/21/2010 | PAID (REC#911347): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Modified structural to accomodate future rooftop bar | SHELLEY | SHELLEY | | BSP | T | 3984548 |
ROBINSON CONSTRUCTION, LLC. | BBB | P | 05/06/2010 | NORTH BEAM AT 16', WEST AND EAST WALLS AT 19' OK | DANF | DANF | | BBB | P | 3977644 |
ROBINSON CONSTRUCTION, LLC. | BBB | P | 04/15/2010 | REAR WALL "C" LINE AND 9 LINE AND 1 LINE AT 14' OK | DANF | DANF | | BBB | P | 3967775 |
ROBINSON CONSTRUCTION, LLC. | BBB | R | 04/14/2010 | Not ready - Not up to bond beam at time of inspection | MIKE | MIKE | | BBB | R | 3966797 |
ROBINSON CONSTRUCTION, LLC. | BBB | P | 04/08/2010 | South & west walls at 8' height - Missing ties for pilaster bond beams | MIKE | MIKE | | BBB | P | 3964336 |
ROBINSON CONSTRUCTION, LLC. | BBB | P | 04/07/2010 | East wall at 8' height ok | MIKE | MIKE | | BBB | P | 3963555 |
ROBINSON CONSTRUCTION, LLC. | BFI | P | 02/08/2010 | Need approved IECC, Inspected 24" depth R-10 | MIKE | MIKE | | BFI | P | 3941640 |
ROBINSON CONSTRUCTION, LLC. | BFN | C | 02/08/2010 | Received Foundation Inspection Report from EEC Lester Litton(23957), No UFER Ground installed | MIKE | MIKE | | BFN | C | 3941639 |
ROBINSON CONSTRUCTION, LLC. | BFT | C | 02/08/2010 | Received Footing Inspection Report from EEC Lester Litton(23957) | MIKE | MIKE | | BFT | C | 3941637 |
ROBINSON CONSTRUCTION, LLC. | BFI | L | 02/05/2010 | Trailer locked, Need approved footing & foundation inspections, Need approved IECC | MIKE | MIKE | | BFI | L | 3941064 |
ROBINSON CONSTRUCTION, LLC. | BFN | P | 01/19/2010 | ok for Earth Engineering to do inspection | BLAKE | BLAKE | | BFN | P | 3933653 |
ROBINSON CONSTRUCTION, LLC. | BFT | P | 01/19/2010 | ok for Earth Engineering to do inspection | BLAKE | BLAKE | | BFT | P | 3933652 |
MEYER ELECTRIC | E= | C | 09/14/2010 | | GARYL | GARYL | | E= | C | 4039103 |
MEYER ELECTRIC | E= | P | 08/20/2010 | RTU'S, OUTSIDE BUILDING LIGHTING STILL LEFT | GARYL | GARYL | | E= | P | 4027385 |
MEYER ELECTRIC | ES | P | 08/19/2010 | COMMERCIAL SERVICE: NEW,200A., 4-WIRE, OK TO SET METER FOR UNIT 140, LITTLE CEASURES PIZZA, MEYER ELECT. MEYER ELECT | GARYL | GARYL | | ES | P | 4026709 |
MEYER ELECTRIC | ES | P | 08/19/2010 | COMMERCIAL SERVICE: NEW 100A., 4-WIRE, "HOUSE" METER,OK TO SET THIS METER, MEYER ELECT | GARYL | GARYL | | ES | P | 4026669 |
MEYER ELECTRIC | E= | R | 08/18/2010 | NOT READY FOR FINAL | GARYL | GARYL | | E= | R | 4026161 |
MEYER ELECTRIC | ES | R | 08/18/2010 | NEED LOAD CALCULATIONS ON ALL TENANT PANELS ETC. NEED AIC RATINGS ETC, CALL IN UNITS BY ADDRESS | GARYL | GARYL | | ES | R | 4026158 |
MEYER ELECTRIC | ES | P | 08/11/2010 | COMMERCIAL SERVICE: 2-NEW SERVICES, 1-1200A.,WEST, 1-100A., EAST, 4-WIRE, 120/208, OK TO SET ONE METER ONLY AT THIS TIME FOR UNIT #100., MEYER ELECT | GARYL | GARYL | | ES | P | 4022795 |
MEYER ELECTRIC | ES | P | 08/10/2010 | Commercial Service: 1000 amp 3 phase bussed gutter for new strip mall by meyer electric: ok to set meter for unit 100 only--------------- at time of reinspect verify: grounding electrode conductor is installed in pvc, bond bushings installed on nipples to 400 amp disconnect and al bond wires changed to cu------ plans need to be revised by final showing service for t3 is not being installed | MATTHEW | MATTHEW | | ES | P | 4022377 |
MEYER ELECTRIC | EUG | P | 08/06/2010 | THE AREA ON BACK SIDE OF BLDG FOR SERVICE CONDUITS | GARYL | GARYL | | EUG | P | 4020557 |
MEYER ELECTRIC | ESL | T | 07/21/2010 | PAID (REC#924586) UFER WAS MISSED OR CUT OFF, NEEDED TO ADD 2-UFERS FOR SERVICES, CONCRETE ENCASED, ROUGH WAS OK TRIP FEE FOR ADDED UFER INSPECTION | GARYL | GARYL | | ESL | T | 4012594 |
MEYER ELECTRIC | EUG | P | 07/21/2010 | 4-LIGHT POLES, TRENCH FOR THESE ONLY | GARYL | GARYL | | EUG | P | 4012589 |
MEYER ELECTRIC | EUG | P | 07/20/2010 | 2-UFERS, CONCRETE ENCASED | GARYL | GARYL | | EUG | P | 4011756 |
MEYER ELECTRIC | EUG | P | 07/13/2010 | feeders ok; leave ditch open at both services to check where conduits turn up | MATTHEW | MATTHEW | | EUG | P | 4008486 |
MEYER ELECTRIC | ESL | P | 05/28/2010 | service conduits coming into far left unit | GARYL | GARYL | | ESL | P | 3987825 |
COLORADO GAS SYSTEMS | H= | C | 08/19/2010 | GAS FINAL. | LYNNS | LYNNS | | H= | C | 4027161 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 08/19/2010 | HVAC FINAL. | LYNNS | LYNNS | | H= | C | 4027159 |
COLORADO GAS SYSTEMS | HC | C | 08/13/2010 | OK FOR METERS ON SUITES 100,110,120,130,140 AND 150. | LYNNS | LYNNS | | HC | C | 4024038 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | C | 08/11/2010 | ROUGH DUCT OK. NEED TO REVISE PLANS TO SHOW ACTUAL PLACEMENT OF RTU'S FOR FINAL. | LYNNS | LYNNS | | HD | C | 4023182 |
COLORADO GAS SYSTEMS | HI | C | 08/11/2010 | 6- 10# TEST AND DESIGN OK. NEED TO TAG LINES WITH SUITE NUMBERS AND REVISE PLANS TO SHOW ACTUAL INSTALLATION FOR FINAL. | LYNNS | LYNNS | | HI | C | 4023176 |
HOGAN MECHANICAL, INC. | P= | C | 10/19/2011 | | LYNNIE | LYNNIE | | P= | C | 4224147 |
HOGAN MECHANICAL, INC. | P= | P | 10/17/2011 | LABELING IN WATER ENTRY ROOM IS STILL NOT COMPLETE--HAS 2 SYSTEMS ALL NEED LABELED--HAS CAPPED VENTS ON ROOF--UN GLUED STUDOR VENTS THROUGHOUT?--3" VENT GOING OVER THE WALL AND DOWN THE OUTSIDE WALL OF THE BUILDING ABOVE WALKWAY? | LYNNIE | LYNNIE | | P= | P | 4222811 |
HOGAN MECHANICAL, INC. | PBP | P | 06/30/2010 | FOR WATER SERVICE ENTRY AND METER ROOM--NO SPRINKLER STUBBED OUT | LYNNIE | LYNNIE | | PBP | P | 4003463 |
HOGAN MECHANICAL, INC. | P= | P | 06/30/2010 | 1) NO WATER METER INSTALLED 2) LABEL ALL WATER SYSTEMS 3) RE INSPECT ALL VTR AS TO THE RTU'S AND DINING AREA | LYNNIE | LYNNIE | | P= | P | 4003456 |
HOGAN MECHANICAL, INC. | PTO | C | 06/30/2010 | SEE VENT TERMINATIONS FOR FINALS--RTUS MAYBE MOVING AS TO THE CURRENT LOCATIONS AND NOW THERE IS A DINNING AREA ON THE ROOF OF MIDDLE UNITS? | LYNNIE | LYNNIE | | PTO | C | 4003446 |
HOGAN MECHANICAL, INC. | PGI | C | 06/30/2010 | VENTS FOR GI | LYNNIE | LYNNIE | | PGI | C | 4003440 |
HOGAN MECHANICAL, INC. | PB | C | 06/28/2010 | 11/2" WS | LYNNIE | LYNNIE | | PB | C | 4002120 |
HOGAN MECHANICAL, INC. | PRD | C | 06/28/2010 | SCUPPERS ARE THE OVER FLOWS | LYNNIE | LYNNIE | | PRD | C | 4002115 |
HOGAN MECHANICAL, INC. | PB | P | 05/21/2010 | new entry----06/24/10----now there is roof drains installed and no inspection at this time -----WRONG PERMIT CALLED--SHOULD HAVE BEEN SHELL H17109--THERE IS NO PLUMBING PERMIT PULLED AT THIS TIME ---BOTH THE GW AND SS ARE OK TO COVER--LACKS THE 11/2" WS INSTALLED | LYNNIE | LYNNIE | | PB | P | 3984965 |